Transmission

Batteries unlock grid capacity via FCAs and curative redispatch in Germany

40 min Listen to the original Episode page
Battery StorageGrid InfrastructureGerman Energy MarketRegulatory PolicyRenewable IntegrationEnergy Storage Economics

Summary

Georg Gallmetzer and Ed Porter discuss how battery storage can mitigate grid congestion in Germany through Flexible Connection Agreements (FCAs) and curative redispatch. They argue that grid operators must retain control over battery schedules to ensure stability, citing the Bollingstedt case study where rapid deployment led to grid instability. Gallmetzer criticizes current German capacity market mechanisms, including clawbacks and frozen intraday schedules, as inefficient and costly for developers. The speakers predict a shift toward longer-duration storage and innovative financing models to navigate the evolving regulatory landscape.

Episode sections

  1. 0:00 – 1:24

    Intro and Bollingstedt Case Study

    Ed Porter introduces the episode, highlighting the Bollingstedt battery project in Germany, which faced grid congestion within eight weeks of commissioning. This incident led to the adoption of Flexible Connection Agreements (FCAs) as a standard mechanism to manage grid stability.

  2. 1:24 – 3:18

    Three Perspectives on Batteries

    Georg Gallmetzer outlines three 'parallel universes' regarding battery storage: governments misunderstanding their cost structure, grid operators underestimating their ability to mitigate grid costs, and developers ignoring the need for grid cooperation.

  3. 3:18 – 6:46

    Curative Redispatch and Grid Capacity

    Gallmetzer explains 'curative redispatch,' a principle allowing TSOs/DSOs to adjust battery schedules ad-hoc to maintain grid stability. He claims this method can extend grid access capabilities by 30-40% without new infrastructure.

  4. 6:46 – 9:35

    Flexible Connection Agreements (FCAs)

    The discussion covers FCAs as a behavioral framework to restore trust between grid operators and battery developers. Gallmetzer argues that without clear rules on battery behavior, grid operators will restrict connections to prevent blackouts.

  5. 9:35 – 12:20

    German Capacity Market Auction Results

    Gallmetzer details the recent German capacity auction, noting that 5.1 GW were awarded to gas projects (LEAC, Arge) repurposing coal sites. He criticizes the inefficiency of these assets but acknowledges they do not interfere with wholesale markets.

  6. 12:20 – 16:23

    Duration Trends and Duck Curve Evolution

    The speakers discuss how Germany's 'Dunkelflaute' (low renewable output) periods necessitate longer-duration storage. Gallmetzer predicts battery durations will increase beyond four hours, driven by market signals rather than subsidies, as the 'duck curve' flattens into a 'castle profile'.

  7. 16:23 – 22:55

    Clawback Mechanism Critique

    Gallmetzer strongly criticizes Germany's capacity market clawback mechanism, calling it an 'evident error' that forces batteries to bid higher to cover potential revenue losses. He argues this inefficiency ultimately increases costs for German consumers.

  8. 22:55 – 29:31

    Frozen Intraday Schedules

    Gallmetzer highlights the hidden cost of Germany's single price zone: TSOs freezing battery schedules hours before delivery to manage congestion. He argues this deprives batteries of revenue opportunities and calls for compensation.

  9. 29:31 – 31:22

    Battery Financing and Tolling Innovation

    Speaker_1 notes that early high-revenue projects have already paid down debt, while new projects face different debt sizing due to lower revenues. To mitigate risk, developers are turning to tolling and contracting innovations, with new platforms emerging beyond large utilities to include insurance companies and international players.

  10. 31:22 – 35:41

    Bollingstedt Case Study and FCA Pilot

    The 104 MW / 240 MWh Bollingstedt battery caused grid instability (voltage, congestion) after eight weeks of operation. This led to a Flexible Connection Agreement (FCA) pilot, now adopted by E.on (70% DSO owner in Germany), to balance grid operability with asset viability through strict operational guardrails.

  11. 35:41 – 39:59

    Scalability and Grid Operator Control

    Speaker_1 argues that FCAs are essential for scaling battery storage in Germany, comparing the grid operator to a 'rabbit' and the battery industry to a 'poisonous snake.' He contends that grid operators must retain control over their grid under FCAs to ensure security of supply, rejecting alternative concepts like 'green flexibility' as non-scalable.

Claims worth verifying

Bollingstedt was the biggest operating battery in Germany when switched on and caused grid congestion within eight weeks.

Unidentified speaker (UNKNOWN) ·0:10

How to verify: Check grid operator reports or press releases from 50 Hertz or the project developer regarding Bollingstedt's commissioning date and initial operational incidents. For recent events, verify 2026-08-24 through 2026-11-24. Use another period only when the speaker explicitly names it.

Flexible Connection Agreements (FCAs) are becoming the standard across Germany following the Bollingstedt incident.

Ed Porter ·0:30

How to verify: Review German grid connection regulations or industry reports from 2026-2026 on the adoption rate of FCAs by German TSOs/DSOs. For recent events, verify 2026-08-24 through 2026-11-24. Use another period only when the speaker explicitly names it.

Curative redispatch can extend grid access capabilities by 30-40% without new grid build.

Ed Porter ·4:45

How to verify: Verify against technical papers or pilot project results from EcoStore or German TSOs demonstrating the capacity uplift from curative redispatch. For recent events, verify 2026-08-24 through 2026-11-24. Use another period only when the speaker explicitly names it.

The German capacity auction awarded 5.1 GW to gas projects, with LEAC and Arge capturing 99% of bids.

Unidentified speaker (speaker_1) ·9:59

How to verify: Check the official results of the German capacity market auction held in November 2026 from the Bundesnetzagentur or relevant auctioneer. For recent events, verify 2026-08-24 through 2026-11-24. Use another period only when the speaker explicitly names it.

LEAC and Arge repurposed phased-out coal sites, reusing existing boilers and changing burners from lignite to gas.

Unidentified speaker (speaker_1) ·10:18

How to verify: Verify project details and permits for LEAC and Arge gas projects on company websites or regulatory filings. For recent events, verify 2026-08-24 through 2026-11-24. Use another period only when the speaker explicitly names it.

Primary source

Gas units receive ~85% of the capacity market clearing price, while batteries receive 20-35% depending on duration.

Ed Porter ·13:19

How to verify: Analyze the clearing prices and allocation rules from the German capacity market auction results. For recent events, verify 2026-08-24 through 2026-11-24. Use another period only when the speaker explicitly names it.

Germany's capacity market includes a clawback mechanism that can take back revenues from batteries.

Ed Porter ·16:23

How to verify: Review the German Capacity Market Act or regulatory guidelines regarding the clawback clause and its application to BESS. For recent events, verify 2026-08-24 through 2026-11-24. Use another period only when the speaker explicitly names it.

TSOs in Germany are freezing intraday schedules for batteries hours before delivery to manage congestion.

Unidentified speaker (UNKNOWN) ·22:55

How to verify: Check German grid codes or TSO operational guidelines regarding intraday schedule freezing and compensation mechanisms. For recent events, verify 2026-08-24 through 2026-11-24. Use another period only when the speaker explicitly names it.

EcoStore built Germany's first largest battery in 2016 with a half-hour duration.

Unidentified speaker (speaker_1) ·13:55

How to verify: Verify EcoStore's project history and technical specifications of their early projects via company press releases or industry databases. For recent events, verify 2026-08-24 through 2026-11-24. Use another period only when the speaker explicitly names it.

German consumers pay for the capacity market costs, particularly through dynamic grid fees or energy charges.

Unidentified speaker (speaker_1) ·19:48

How to verify: Review German energy pricing structures and regulatory decisions on the pass-through of capacity market costs to end consumers. For recent events, verify 2026-08-24 through 2026-11-24. Use another period only when the speaker explicitly names it.

Early battery projects with high forecasts have harvested high revenues and paid down debt, while future projects face different debt sizing.

Unidentified speaker (speaker_1) ·29:37

How to verify: Review financial disclosures or press releases from early German BESS developers (e.g., ECO STOR, E3/CO) regarding project completion dates and debt repayment status; compare with current merchant revenue data from EPEX SPOT. For recent events, verify 2026-08-24 through 2026-11-24. Use another period only when the speaker explicitly names it.

Bollingstedt is a 104 MW, 240 MWh battery project.

Ed Porter ·31:53

How to verify: Check ECO STOR's official website or press releases for project specifications of the Bollingstedt site. For recent events, verify 2026-08-24 through 2026-11-24. Use another period only when the speaker explicitly names it.

The Bollingstedt battery operated for eight weeks before grid restrictions were imposed.

Unidentified speaker (UNKNOWN) ·32:01

How to verify: Review news archives or grid operator reports from late 2026/early 2026 regarding the Bollingstedt connection timeline. For recent events, verify 2026-08-24 through 2026-11-24. Use another period only when the speaker explicitly names it.

E.on owns 70% of DSOs in Germany.

Unidentified speaker (UNKNOWN) ·33:48

How to verify: Verify E.on's ownership stake in German Distribution System Operators via E.on's annual report or investor presentations. For recent events, verify 2026-08-24 through 2026-11-24. Use another period only when the speaker explicitly names it.

The Bollingstedt FCA included a charge obligation at solar peak.

Unidentified speaker (UNKNOWN) ·34:12

How to verify: Review the specific terms of the Bollingstedt FCA published by ECO STOR or grid operators; compare with standard FCA templates. For recent events, verify 2026-08-24 through 2026-11-24. Use another period only when the speaker explicitly names it.

Primary source

DSOs in Germany are not doing well in digitalization of their operation.

Unidentified speaker (speaker_1) ·36:47

How to verify: Review regulatory reports from Bundesnetzagentur (German Federal Network Agency) on grid digitalization metrics or industry analyses of DSO IT infrastructure. For recent events, verify 2026-08-24 through 2026-11-24. Use another period only when the speaker explicitly names it.

Speaker_1 believes concepts like 'green flexibility' and 'Keon' do not incorporate scalability.

Unidentified speaker (speaker_1) ·38:21

How to verify: Cross-reference with episodes featuring 'green flexibility' and 'Keon' (e.g., Modo Energy episodes) to compare the proposed mechanisms with FCA requirements. For recent events, verify 2026-08-24 through 2026-11-24. Use another period only when the speaker explicitly names it.

Do your own research

  • Verify the 30-40% grid capacity extension claim by reviewing German TSO/DSO operational reports or regulatory filings on redispatch effectiveness.
  • Check the German Federal Network Agency (BNetzA) auction results for the specific 5.1 GW award to LEAC/Arge gas projects.
  • Review the German Energy Industry Act (EnWG) and grid connection regulations regarding 'curative redispatch' and FCA legal frameworks.
  • Analyze ECO STOR's published operational data from the Bollingstedt project to assess the actual grid impact and FCA terms.
  • Compare battery revenue streams in the German capacity market against gas peaking plants to validate duration-dependent pricing claims.
  • Investigate the 'clawback' mechanism details in the German capacity market design to understand revenue risk for battery developers.
Full transcriptexpand

0:00Ed Porter: I'm your host, Ed Porter. Welcome back to Transmission.

0:10Unidentified speaker (UNKNOWN): When

0:10Ed Porter: it was switched on, Bollingstedt was the biggest operating battery in Germany. Within eight weeks, the local grid was struggling to keep up with it. The battery was causing congestion problems the grid couldn't handle. So the choice was simple: accept limits, or for the battery queue, don't connect the grid. EcoStore took the limits, and those rules became the pilot for flexible connection agreements, or FCAs, which are now becoming the standard across Germany. Georg Galmetzer, managing director of EcoStore, joins me today to discuss why he thinks grid operators should stay in control. His argument is that without clear rules on how batteries behave, no grid operators. operator will let them connect at scale. We also get into Germany's new capacity market, and the one rule Georg says will leave German consumers paying more than they need to. For this episode, if you're going live with wind, solar, or battery projects in Germany, I'd recommend using Co. Moto Energy's AI analysts to set up benchmarks to see how FCA restricted. assets perform today, or to get an FCA specific revenue forecast generated. Let's jump

1:21Unidentified speaker (UNKNOWN): in.

1:24Ed Porter: Hey, thank you for inviting me. Our pleasure. And as ever, let's get straight into it. So what is one thing that people get wrong about batteries in Germany?

1:33Unidentified speaker (speaker_1): Well, uh it depends uh which people you mean. So I think we are in a about three parallel BES realities. Let's start with people from governments. I think they get wrong that BES is not a cost like a piece of grid or renewables. Any bet benefit BES brings into the system is for free for the public because the investor pays all the bills. So actually, the government should have an incentive as to deploy as many BES bests as as it could be. But I don't see this aspect in today's government and the regulation. Unexpectedly, the regulator, Binets A, is the one as to push BES. If you look at the metering concept novel or the Agnes, uh the grid fee novel, as it's going to be,

2:20Unidentified speaker (UNKNOWN): which is

2:20Ed Porter: Agnes.

2:21Unidentified speaker (speaker_1): Which is Agnes.

2:21Ed Porter: Yeah.

2:22Unidentified speaker (speaker_1): It is very effective what has been regulated and helping BES best having really reliable business foundations from 29 onwards.

2:30Unidentified speaker (UNKNOWN): Well,

2:31Ed Porter: let's let's just pause there because um first things first, uh I can I can hear you've got sort of a list of three, which which tells me that you're an engineer. Uh because when

2:39Unidentified speaker (UNKNOWN): you

2:40Ed Porter: ask engineers for one thing, they always come with a list of three, which is great. Uh but the second thing is this this concept of batteries sort of not costing consumers something is really important, right? So so somebody somebody builds a private enterprise, builds a battery, and then you only really see that battery interacting with the market if it's cheaper than something else. So if the battery was super expensive and really, you know, really costly to cool on, you'd never see it because it would always be sort of stacked away and too high a price. But because because you because you do see it acting every day, what it's doing is it's always bringing down that price. And something that is so simple, yet yeah, often people get wrong.

3:14Unidentified speaker (speaker_1): They're That just is thank you for the summary. You can have said it better. Let's get into the next

3:18Unidentified speaker (UNKNOWN): people like around. Let's do more people.

3:20Unidentified speaker (speaker_1): There's parallel universes. The next parallel universe is the universe of grid operators. It's a big and important universe. But grid operators get wrong that BES actually is their only realistic chance to mitigate the exploding grid cost and the eternal connection date for renewables. us deliver quick access for grid and renewables as soon as they can. Why? Because BES actually they operate in a way that expands virtually the grid access capabilities. You need to see how grid operates. The BES operate. And if you lay both profiles overload, you can access much more PV and you can actually rule. also best in a reserve access capacity as to give industry the priority without damaging the best uh revenues. Um, I give you an example. The actual novel that I uh EcosO tries out to uh demonstrate with uh several DSOs and TSOs is the so-called curative review. redispatch principle. It

4:28is a principle where the TSO, DSO can ad hoc live, change the schedules without anticipation, and of course compensate the lost opportunities. But in this way, the DSO and TSO have full control, especially on the charge side of batteries.

4:45Ed Porter: Yeah.

4:45Unidentified speaker (speaker_1): And allow uh even in a case of a uh fault of the grid. to keep the grid stable and push the battery out of the the the charge site in the normal case. This extends the grid by about 30 to 40 percent.

5:02Unidentified speaker (UNKNOWN): Yeah,

5:02Unidentified speaker (speaker_1): and this is a unlevered um resource. It doesn't cost anything, it comes for free, it needs a bit of processing and a bit of regulatory introduction, but that is what grid operators get wrong, I think.

5:17Ed Porter: So like the old-fashioned to to be um maybe a little bit dismissive, like the old-fashioned way of a grid operator uh working would have been to think about okay, we want to connect more demand and more generation. Okay, let's build more grid. Um that was kind of always this the solution, right? Just get the the grid to be bigger.

5:33Unidentified speaker (speaker_1): They are incentivized by the regulation scheme as to always build bigger grids, grid,

5:38Ed Porter: but

5:38Unidentified speaker (speaker_1): not to be uh the efficient as they could.

5:41Ed Porter: Exactly. So this efficiency thing is is really important. And in in power markets, I think it's always been understood that better utilization of the assets generally brings down costs to consumers. And so to play it back to you, you're saying, well, I'm a battery owner, I want to be charging and discharging. But if you tell me that there's some time that you want industry to have priority and just want to wait or ask me to wait for two hours or four hours. whatever it might be. As

6:04Unidentified speaker (UNKNOWN): long

6:04Ed Porter: as you let me know and and you kind of give me some sort of um uh economic um reimbursement. Yeah, exactly for the for the sort of lost money, then I'm happy to shift.

6:14Unidentified speaker (speaker_1): Sure.

6:15Ed Porter: And and and then your your grid goes from thirty or forty percent utilization to fifty percent utilization.

6:21Unidentified speaker (speaker_1): Much more.

6:21Ed Porter: And we haven't had to build more grid, right? Which you know and

6:24Unidentified speaker (UNKNOWN): And

6:24Unidentified speaker (speaker_1): it's is above all, you can connect now. and not in ten years after grid enforcement with regard to the new data center industry that desperately waits for connection data or all the other electrification industries that we really need for a success of the transition. Yeah.

6:38Ed Porter: So you can think of batteries as this like skeleton key. You can kind of put them into the grids and and uh unlock more capabilities. Okay,

6:44Unidentified speaker (UNKNOWN): we're

6:45Ed Porter: we're we're at two of three. Let's

6:46Unidentified speaker (UNKNOWN): do three.

6:46Unidentified speaker (speaker_1): The the th the third uh universe actually is the the wild west world of uh best developers. I think best developers do get wrong that there is no free ride on public infrastructure. You

6:57Unidentified speaker (UNKNOWN): know,

6:57Unidentified speaker (speaker_1): when best developers in 23-24 came in in a mass to uh to Germany and they virtually plundered grid capacities, as I must say, and uh the grid operators reacted in panic by holding back completely. I think what happened is that both understood that grid and bass both are actually a couple of destiny. They need to come together because there is no grid operation without BES, there's no BESS without grid. But I must say the first date really failed. And we now need to rearrange a like a etiquette on what's the rules of building up the setting for the new first date. And I think FCAs is a very important set of ruling as to define

7:47Unidentified speaker (UNKNOWN): flexible connection agreements.

7:48Unidentified speaker (speaker_1): Connection agreements is a kind of etiquette to let grid operators again find trust in BAS operation because it defines how BAS actually behaves. Which is something when you decide to marry, you should first check. the behavior of a partner. And I think FCAs are a little bit like a behavior scheme where the grid operator doesn't have to fear the lose of the loss of control. Because what he feels most that he has the grid operator must make sure that the grid stays stable. There's no blackout, Out, there's no brownout. And with not knowing batteries' battery's behavior, he can't let battery batteries access in a volume that we want. I'm not telling about hundreds of gigawatts, but even single-digit gigawatts could be um uh dangerous enough as to endanger the grid and uh uh keep it from 50 hertz was here lately and exactly described this principle. And this is really true. And I want to emphasize that we need to respect, we as developers, a certain etiquette and then come up with a new dating proposal, accepting certain FCA rules and some other rules

8:58Unidentified speaker (UNKNOWN): that

8:59Unidentified speaker (speaker_1): are essential for playing that game.

9:01Ed Porter: Yeah. So if you want to hear both sides of this date, then you've got the you've got this episode, and we're going to get into it in more detail. And then Wilhelm Kiewitz from 50 Hertz also came on a few weeks ago and talked about how 50 Hertz, one of the four transmission system operators in Germany. was seeing the sort of evolution of batteries and how they were thinking about batteries and and where they could get more from them, which is uh yeah, it's nice to see sort of two sides of that coin. Okay. So that's our that's our sort of three parallel universes, what's three sets of people get wrong. We've also recently just had uh the capacity market auction in in Germany. Um what happened?

9:35Unidentified speaker (speaker_1): Well, it it was uh two days ago. We had a recording coding on the fifth 5th of November. And uh the setting was that the German government wanted to start with a allocation of 9 gigawatt for gas speakers in two tranches. The first tranche was uh awarded uh two days ago, and the result is that uh 5.1 gigawatt we were are actually awarded with um the big ones, LEAC layac and Arda. rwe catching 99% of uh all auction bids. Why? Because uh interestingly, they uh uh tendered with um brown field sites as to repurpose phased-out coal sites, importantly phased out and not uh running in 31, and are that are most cost efficient as to bid into auction. Interestingly, LAC, LEAC, and I really like that aspect, doesn't even dismantle their coal site, but they reuse their existing boilers and just uh change burners on and uh from from lignite to uh gas. I really like because they are super inefficient, and

10:37inefficiency brings me to the point that they don't interfere with the actual market, which was one of the targets. So, as a best developer, I don't want any subsidized asset to interfere with wholesale markets and healthy energy. only price signals, which that is the feed we live from and we want in the market. And these very inefficient um, like say gas steam boilers, they're not going to to bother much and are reliably there when the dunkelflaute, which is you know, the the end game, the end an enemy in the the energy transition, where's no wind, no solar, uh uh maybe it this is cold, maybe it's dark.

11:14Ed Porter: We

11:14Unidentified speaker (speaker_1): need a lot of power and we need reliable control of capacity, and that is where they kick in.

11:20Ed Porter: Okay. Well, we'll come on to Dunkelflouter in a second. I think just first to give a comment on the the types of site repurposings that that are going on. That's happening in GB, um, looking at, say, at the Thought Marsh power station, uh, that's now being repurposed for a very large battery project uh by a company called Fidra. If you look at Italy in the and the Maxa, it was Anel who won lots of projects with their brownfield sites as well. And so it it does make sense, right? People are repurposing these old sites and and and that's sort of where the lowest cost uh to play is coming from. I think maybe going on to the the Dungle Flouter, so this period where you have low wind, low solar, and high demand. Let's let's talk about that because it's it's different in different places across across Europe. So the the sort of the length of that system tightness really it really matters where you are in uh from from a geography point of view, and it matters how long it is. And that's important because it it it will change um how much say a battery can contribute to it and how much say gas capacity you need.

12:20Unidentified speaker (speaker_1): Yeah, no wonder we are going into an energy system where the weather defines the availability of power. And well, the weather in Italy uh is is certainly different than in Germany or UK. And unfortunately in UK the weather is the worst, so but you have uh in in terms of uh tourism, but you have so much

12:37Unidentified speaker (UNKNOWN): wind

12:37Ed Porter: the the look out the window today, yeah, it's kind of overcast

12:40Unidentified speaker (UNKNOWN): and dark. So it's the same in

12:42Unidentified speaker (speaker_1): Germany today, so don't worry. But anyways, um the power system being defined by weather, you need to say to say anticipate that weather eventually. eventualities and and save up for for the gaps. And gaps in Germany are a little bit longer and deeper as they may be in in other markets. A lot of wind in in UK or a lot of solar in Italy. So I understand that this so-called resource adequacy, which is a proceeding as to identify these gaps, turns out to be different in any uh market. And in Germany it turns out to be kind of a a a one week, two weeks uh uh worst weather year event that needs to be covered.

13:19Ed Porter: And that means that when uh gas units come to get a capacity market contract and batteries come to get a capacity market contract, you'll see the gas units getting say 85% of the clearing price. But a battery, depending on its duration, will get something like 20 or 35%, depending on how how long the duration is.

13:35Unidentified speaker (speaker_1): Yeah, that's the duration is a very important question because I believe. we are not at the end of the duration rate we find in the market. Um I'm in now for more than 10 years in this battery space and uh started to build out the first battery largest in Germany back in 2016 with half an hour duration. Uh the next project we are going to deploy is four-hour Hour duration, so it's uh uh eightfold in in 10 years or so. And this is not going to end. So we're going to see, I mean,

14:04Unidentified speaker (UNKNOWN): also your

14:04Unidentified speaker (speaker_1): reports show you're going to see longer duration assets driven by endoganeous build-out, like the price and investment incentives, despite falling curves, maybe also because of falling curves, as the right mitigation strategy to be an investable business, still despite falling curves. Yeah. I really like that. If you look uh actually also at the profiles of the future. that is very difficult to get that data, but an idea of what is the duck curve in the future. I don't believe it's going to be a duck anymore. I think it is kind of like a kind of a castle profile, something flattened the day and

14:41Unidentified speaker (UNKNOWN): the evening

14:41Unidentified speaker (speaker_1): with different levels.

14:42Ed Porter: We totally agree. You you kind of get this if you're kind of if you're familiar with PowerShape, you kind of see a peak in the morning

14:47Unidentified speaker (UNKNOWN): and

14:48Ed Porter: and a a bigger peak in the evening. And what we see is you get a bigger and bigger. power fleet is that essentially they start to kind of put a cap on that

14:54Unidentified speaker (UNKNOWN): on that peak. And so you get this kind

14:55Ed Porter: of flat tabletop type behavior.

14:57Unidentified speaker (speaker_1): And that's perfect uh investment foundation for long duration batteries. Let's

15:02Unidentified speaker (UNKNOWN): see

15:02Unidentified speaker (speaker_1): long duration, we're not talking about two weeks. We are talking about maybe eight hours or or ten hours up to and the the the longer we wait in the future the the the the more innovation we will see because we have survived as an industry ever without subsidies. We had to innovate every time. And being in that space for more than 10 years, innovation is a constant. Innovation and agility. And that is where EcoStore is really good at. We have a fully integrated value chain with a lot of engineers, and we build everything ourselves, we develop everything ourselves. And the one constant. is constant innovation, constant change, adaptability. And that is why we believe we will be in the game still in the 30s, even in flattened-out curves. And coming back to the capacity market, I mean, that helps even prolonging the duration rate. If there's a little incentive on the investment for longer hours, even if the um durating

16:02factory factor is long.

16:03Ed Porter: Yeah. And and and we're on this longer hour duration. There's something almost unique about the German capacity market in the concept of the this clawback option. So if you have a um if you have a a battery uh that's trying to provide the the the dispatch and yet the event runs for a long period of time, then you can have some of your capacity market revenues taken back from you. based on a sort of strike price that's set on gas. How do you think about that? Because that's very unusual. Like I think a lot of capacity markets are almost seen as being sacred by financiers and you'll always get that money. But uh in Germany's case, not so.

16:39Unidentified speaker (speaker_1): Well, Germany would be the first market that strikes the perfect scheme with the first introduction. So of course this is wrong and needs to be corrected. And actually you should spread your analysis. It's really good how you identify a actually quite astonishing error in the regulation scheme. Uh, and highlight the consequences of it on battery bits, which is absolutely eye-let's say eye eye-burning to me. Anyways,

17:10Unidentified speaker (UNKNOWN): we would say

17:11Ed Porter: eye watering, but

17:12Unidentified speaker (UNKNOWN): I eye burning. burn it.

17:14Unidentified speaker (speaker_1): I'm I'm on fire uh

17:15Unidentified speaker (UNKNOWN): if I

17:15Unidentified speaker (speaker_1): see this mistake and uh this must be corrected. And uh Modo is doing a good job in highlighting um that mistake for first, and we're gonna propagate the the concept uh until I think March, um or at least in springtime, when the new law is going to be defined and enforced, and we hope to get it done first. If not, um probably the next round in the true capacity market. is going to be too expensive, inefficiently too expensive, and any consumer has to pay for it. And therefore it's worthwhile getting a hit on correcting that mistake.

17:47Ed Porter: That's really where I wanted to go next. So if you have sort of um a particularly painful process that causes batteries to bid higher than they kind of otherwise would, then the person who ends up uh losing in that situation is

18:00Unidentified speaker (UNKNOWN): the German

18:01Ed Porter: consumer, right? So so take maybe taking a step back from the the nuance, like what's your view on the capacity market's impact on German consumers?

18:09Unidentified speaker (speaker_1): Well, this it depends uh what the consumer wants. If the consumer wants to be protected with a capacity market, he buys kind of an insurance policy against uh price peaks,

18:22Unidentified speaker (UNKNOWN): uh

18:22Unidentified speaker (speaker_1): if price peak protection is what he's going for. I believe that insurance policy. is in vain because price peak protection you can also get by deployment of the best fleet of the 20 gigawatt plus we are going to see in the coming years. That will eliminate the peaks. Actually, the regulator intends to be protected. But there is another protection aspect that is the unintended curtailment of load, where consumers are willing actually to pay to have reliable and secure energy. Now Nevertheless, there is a misincentive because the end consumer down at the household is the last one to be curtailed in times of, and that is actually the one paying for it because the energy intensive industry is not probably going to pay for it because there will be definitely, again, a kind of exemption discussion of energy intensive. So the ones actually being able to be curtailed and providing flexibility. to the market too are the ones not paying for the bills and the others being protected, they pay for the bill, although they are protected anyways.

19:21Unidentified speaker (UNKNOWN): So

19:22Unidentified speaker (speaker_1): it's it's a bit non-stringent and non-logic

19:25Unidentified speaker (UNKNOWN): in

19:26Unidentified speaker (speaker_1): my eyes. And interestingly,

19:29Unidentified speaker (UNKNOWN): it

19:29Unidentified speaker (speaker_1): is probably not going to be a flat uh 0.2 euro per megawatt hour cost of this 12 billion uh of the auction uh two days ago. And then another probably even more uh costly auction in December. Apparently, the one using the power in times of shortage would have to pay the bill. And it's unclear how this is going to be rolled out. It looks to me like kind of a dynamic grid fee for using power in In a congested time. And that brings me to the point that we already discussed about dynamic grid. fees from a Agnes and grid fee regulation perspective. And we also talk about other price signals for shortages. And I fear that these instruments overlay and they're not coordinated.

20:15Ed Porter: It

20:15Unidentified speaker (speaker_1): would be new to me that anyone out there in the regulation or governmental scheme tries to coordinate all instruments.

20:21Unidentified speaker (UNKNOWN): Yeah. And

20:22Unidentified speaker (speaker_1): this leads me to the point that the instruments overlapping, they are inefficient too.

20:26Ed Porter: And I think if I'm if I'm a consumer, right, in Germany and somebody says to me, Oh, they're going to try and recover the capacity market cost from me uh during this period, um, whenever whenever the market gets gets tight, well, the prices are already tight, the network fees will be high, and there's a capacity market charge that's going

20:42Unidentified speaker (UNKNOWN): on top.

20:42Ed Porter: Well I'm just going to build a battery on my own, my home or my industry and try

20:46Unidentified speaker (UNKNOWN): trying and to

20:46Ed Porter: try and sneak around

20:47Unidentified speaker (UNKNOWN): the

20:47Ed Porter: charge.

20:48Unidentified speaker (speaker_1): This could be an uh investment incentive for our industry, you mean?

20:51Unidentified speaker (UNKNOWN): So the

20:51Unidentified speaker (speaker_1): more efficient the system, the more batteries are being built. Yeah well that's that's a logic kind of

20:55Unidentified speaker (UNKNOWN): if

20:55Ed Porter: there's a there's a balloon that's being squeezed somewhere

20:57Unidentified speaker (UNKNOWN): and there's

20:57Ed Porter: sort of the revenue's popping up in unexpected places.

21:00Unidentified speaker (speaker_1): I mean we do have uh uh a kind of extremity extremities in prices are not a tolerable system. So batteries are helping to to mitigate that let's say it's not a system error but it's uh uh a system uh claiming for investments and batteries always help out. Yeah. Uh though it probably would be clever as to not uh um uh make mistakes first and batteries uh investing and and and solving a problem and and and concentrate the industry on the really topic that is the energy transition, getting renewables integrated at the lowest cost possible for the consumer.

21:36Ed Porter: Okay. Well, maybe uh next question. If I put you in charge of this process of designing the capacity market, or maybe we can also expand that to sort of the broader rules that exist in the German power market today. Like what's one thing that you would change uh for for for the power system?

21:52Unidentified speaker (speaker_1): If it was for the capacity market, I would definitely go for the claim back mechanism, which is uh evident uh error. If I looked at a larger uh scale, I mean we have one price zone, not this this ever topic that every FCA, every other rule we are discussing is kind of a uh a detour and and uh counter solution to not having split uh the price zones.

22:16Ed Porter: Totally.

22:17Unidentified speaker (speaker_1): Um this discussion is very old and is in vain to discuss since we need to find other ways. It's a political death discussion. Unless the problems don't disappear because politicals don't like uh the price on split and it's on our table. It makes things complex and expensive to like.

22:32Ed Porter: Yeah. If you so if you don't go down that locational market route, you then have to have all these other extra things that try and act like locational markets to try and make it happen. Yeah. Um which is my favorite German expression through the back of the chest.

22:44Unidentified speaker (speaker_1): The back of a chest. I I'll give you another uh another blossom that uh bl blow uh c grows w in in this discussion. It's the TSO's idea of actually freezing schedules

22:55Unidentified speaker (UNKNOWN): on

22:55Unidentified speaker (speaker_1): an intraday continuous. It's a bit nerdy, but actually, in order to be still in the control seat from a TSO point of view, batteries in the future may be frozen on their schedule hours before delivery,

23:11Ed Porter: yeah,

23:11Unidentified speaker (speaker_1): in order to deliver better. So batteries lose a lot of opportunity. The discussion is about non-compensating this. My opinion is there must be compensation. Yes.

23:22Unidentified speaker (UNKNOWN): And there

23:22Unidentified speaker (speaker_1): must be better ways as to mitigate. And the answer is well, price zone split. And that is impossible. So batteries in this regard are actually now probably paying a hard price for no price zone splits by this uh alternative uh route of um freezing schedules and this. has not been uh discussed fairly so far. And yeah, that's why

23:42Unidentified speaker (UNKNOWN): I need to

23:43Unidentified speaker (speaker_1): highlight it here.

23:44Ed Porter: This is happening in in other markets as well. So if you don't have locational signals, what you tend to have is a central dispatcher who then wants more control over the process and does things like and will will freeze your dispatch profile ahead of time. And just to kind of highlight just how silly that is, you're taking your most flexible asset that can react within seconds. and you're blocking it out of the market where it gets to react to the changes that are happening. Yeah,

24:07Unidentified speaker (UNKNOWN): yeah.

24:07Ed Porter: That's crazy.

24:08Unidentified speaker (speaker_1): The the the issue is the the the batteries are simply too quick for today's processing in congestion management for for TSO and DSOs. Uh batteries were not uh asked to come into the game. We just came on on a party without being invited. And here we are, we are so dynamic and so uh quick and uh the threat is um seen, of course, first from DSO and Tiersaur. Uh I think there is better instruments, or at least these instruments of freezing schedules can be mitigated to extremities and only one side and on both sides as to keep the financial damage low. And I believe this rationale of keeping the financial damage low is going to prevail, since then therefore I don't see it as as a fundamental threat to the industry. Okay. But I want to highlight the industry, look closely what your TSO proposed your next.

24:57Ed Porter: Yes, uh firmly agree. And we've we've been spending a lot of time on this topic as well. Um but maybe I ask you to swap your hat. So maybe from being an engineer to perhaps going towards uh sort of commercial uh as as a as a commercial head. So when you're building your business case for for batteries, uh do you think how do you think about the revenue streams? You've

25:16Unidentified speaker (UNKNOWN): got

25:16Ed Porter: sort of day ahead, intraday, FCR, AFRR. Like where where are you willing to sort of place your bets for the for the future of the battery business case?

25:25Unidentified speaker (speaker_1): I place the bet there where the Modo index uh is going to tell me. So we buy your curves and your curves tell me while this is the mix. And if this mix is bankable, we do it. Or we show this mix to dollars and ask them for a good price. I'm agnostic to the mix. Well, not really. If I uh or if if EcoStore sees all these mixes, this has some meaning for the vertically integrated value chain because we need to adapt our systems. If the curves change and the mix changes, you can't still build the same asset. You need to change your technology, you need to adapt whatever your efficiency means. If you need to cycle heavier and more energy, efficiently. efficiency becomes really important. And long-living of your asset because you need more cycles. Or the duration rate becomes really crucial. And that is where we are really good at because the curves, if they come in, we instantly look very closely to the new projects and how we can adapt higher um uh financial performance, higher economic performance as to make. mitigate potential risk of curves going down.

26:29Ed Porter: I mean to to kind of go behind the scenes a little bit of how we see this, but we see the FCR market saturating, we see A AFRR saturating as well. So kind of the day ahead intraday, those those markets are really key in terms of making that future stack, which is a little bit why people have gone from the half hour system that you built in 2016 to now looking at two, four, six hour systems, because they're more building their business case on wholesale trading than they are ancillary services.

26:53Unidentified speaker (speaker_1): Yeah, but I'm not afraid because we are we are so agile, we learned that a business plan made a few years it can't a business plan can't be right if you freeze it because there's so much uh development on on the market, on the technology, also on regulation. And that is a little bit uh the the point I see with the German developers that they believe that uh that business plans once made on a shiny PowerPoint slide prevail until operational. They don't. They

27:22Unidentified speaker (UNKNOWN): have

27:23Unidentified speaker (speaker_1): they have never done. I'm I'm in the game now for more than 10 years in the battery field, and no uh business plan made in the first place has turned out the same. The decisive point is that uh if you encounter a risk like FCR, AFR AFIR saturation, what is your conclusion? on mitigating that risk? How agile are you as to adapt your processes, your contracts, your technology, your your your financing, as to mitigate that risk? If you're agile, you will have a different business plan, but it will be still attractive. Yeah. If you're not agile, you're lost and you're out of the

27:55Unidentified speaker (UNKNOWN): game.

27:55Ed Porter: And something that I think people get wrong all the time is is this kind of concept that oh I've built a battery and it's gonna do seven years and that's the end of the asset. And it's a little bit set by sort of how financiers think about the duration that they're willing to put debt in. But these assets, the the lease for the site is 40 years, the connection is 40 years. And so when you get to year six or year seven, well, you're swapping your half hour or your one hour system for possibly a four hour system, and it's a new asset, it's a new, it's a new investment opportunity. And so you have flexibility in the life of this project.

28:23Unidentified speaker (speaker_1): But in theory, if you already also have the means as to adapt to it, because you need someone doing it. You need someone to uh change permitting, you d to buy probably get more land or do the engineering, do the repurposing and and and the servicing, this is what what you need. You need a whole tool set uh to actually extract that opportunity that is there. And I believe those uh um there's there's more than Modern Ecoso Ecosor to have uh a kind of a uh uh agile uh environment and then and um but we especially are are are the deepest in in in delivering on everything. And that is the license to operate in in the 2030s, I believe.

28:58Unidentified speaker (UNKNOWN): And

28:58Ed Porter: maybe actually just a I think a fundamentally quite hard question is that in in the German market, the revenues have been pretty good up until now. You've you've seen revenues over two hundred two hundred thousand euros per megawatt per year, which is a a good number. Um

29:10Unidentified speaker (UNKNOWN): one

29:11Ed Porter: of the things that we've seen in other markets is that if the forecasts are too high. for too long, people will bring in debt and they'll bring in debt at a kind of too high a level. And then as the market starts to saturate, so as you s move on from sort of FCR markets and you go into sort of more intraday or day ahead, it can get quite hard for some asset owners because they've got these large debt repayments to pay. How do you think about that? Because it's something you must be really aware of and trying to navigate with the uh how how you how you think about financing.

29:37Unidentified speaker (speaker_1): Well, um uh those projects that have had very high forecasts and have been online already, well, they have harvested the high revenues. And if they would go down, well, they they will probably be paid off already.

29:49Unidentified speaker (UNKNOWN): So

29:49Ed Porter: they've sort of done some um uh some some cash sweeps

29:52Unidentified speaker (UNKNOWN): and been able to

29:53Ed Porter: pay down their debt.

29:53Unidentified speaker (speaker_1): I think uh the historical assets are not uh endangered. We're looking to the future I think the bank um sector has really well learned uh it is still possible in Germany to do merchant financing despite of course going down, but the debt sizing is certainly different. Yes, incorporating that. And that is that is one angle as to to tackle it, bring more equity. And um the other angles are protecting by by tolling, by contracting. Okay. EcoStore is is really uh um uh in front of uh getting contracting innovation also to the market, together with banks and and tollers. that that that like us and help us to get it leveraged and that is the way to go in certain times of uncertainty. And

30:33Ed Porter: how how do you see that tolling market? Is it sort of uh alive and kicking or is it is it sort of a s a few select players uh uh uh sort of dominating it at the moment?

30:41Unidentified speaker (speaker_1): Well there's a lot of innovation in the tolling market. There is kind of interesting platforms coming out for small battery players. There's um uh others than just um large utilities, there's there's also insurance companies or unexpected corners of the international industry interesting in providing tolls.

31:01Ed Porter: And

31:01Unidentified speaker (speaker_1): not only tolls, as you have recorded uh an episode with Nodel B, there's certain um innovation degrees also in the contracting market. Also, the EPEX brings out new products where you can swap to or trade against. So I think. contracting and securing revenues is key. It doesn't have to be a toll, but it had to be a certain coverage of uh the bank exposure.

31:22Ed Porter: Okay, that makes sense. Uh I'm gonna move you on to to to Bollingstedt. Uh could you talk us through the project? Uh I know you I I I know you don't uh own it any longer, but could

31:31Unidentified speaker (UNKNOWN): you just tell us a

31:32Ed Porter: story of of how it progressed and what you learned from it?

31:35Unidentified speaker (speaker_1): Bollingstedt BoilingShit was uh a learning vehicle for the for the whole industry. And

31:39Unidentified speaker (UNKNOWN): we've

31:39Unidentified speaker (speaker_1): been transparent on it ever since because we knew it's not only eco-store learning, but we wanna establish industrial standards and etiquette also how to operate assets because we knew you can't operate it uh uh in any ways we unrestricted.

31:53Ed Porter: And just very quickly, I will add that it was 104 megawatts, 240 40

31:57Unidentified speaker (UNKNOWN): megawatt hours ish. So

31:59Ed Porter: just a little bit longer than two hours. And it

32:00Unidentified speaker (UNKNOWN): was a

32:00Ed Porter: battery.

32:01Unidentified speaker (UNKNOWN): It's

32:01Unidentified speaker (speaker_1): a battery, yeah. For for a certain while it was the largest operating battery in Germany. And in in that time, um we we connected the batteries uh to the grid with a grid operator. Wasn't yet sure whether this goes really well, but it was an experiment on both sides. And we connected it, operated for eight weeks. And of course, it created real trouble on voltage, on congestion, on operability on the grid operator side. And after eight weeks, uh the grid operator was either us to pull the plug or as to impose hard FCA restrictions with the feeding and charge restriction, ramp rates, uh caps and auxiliaries. They were not intended as to um damage our business case, which eventually for some extent initially did, but it was intended as to gain back operability of the grid that has been lost. And there is uh absolute um uh German uh legislation background for a grid operator, as to claim back operability if a NASA behavior endangers security of the supply. There's no legal way us to argue around. And we have taken that opportunity because we didn't have any other chance and said,

33:11okay, let's make an opportunity about it and try and um be build a certain etiquette. Now it's called FCA Flexible Connection Agreement pilot, as to find a compromise on operability, but at the same time, business viability and investment viability for the asset owner. Because this the industry was looking very closely, and maybe this is going to be copy-pasted to other markets. There is other models on the market as to mitigate, but eventually. the Bollingstedt blueprint was then as to be rolled out by the Eon, 70% DSO owner in Germany

33:48Unidentified speaker (UNKNOWN): of

33:48Unidentified speaker (speaker_1): all DSOs, and is being adopted now in life. It's

33:52Ed Porter: becoming more of a standard across all DSOs.

33:57Unidentified speaker (speaker_1): From Bollingstedt, because Bollingstedt um has some some specialties I really like about a charge obligation at solar peak, which is the evidence. Is the that is the factor uh to connect more solar without building out the grid.

34:12Unidentified speaker (UNKNOWN): It's

34:12Ed Porter: it's it's a funny thing to sort of say you must charge when solar's at the peak. It's like someone coming into this office and saying, Ed, you've got to eat lunch during lunchtime.

34:19Unidentified speaker (UNKNOWN): And I kinda like,

34:19Ed Porter: Yeah, I do anyway.

34:20Unidentified speaker (UNKNOWN): Well Ed sometimes you

34:21Unidentified speaker (speaker_1): would want to have lunch at one o'clock because there's a meeting and the battery batteries is the same. There's a high price. at one, and but it had to be charging at at eleven.

34:29Unidentified speaker (UNKNOWN): It's

34:30Ed Porter: kind of a rule that I'm very happy to sign up to.

34:32Unidentified speaker (speaker_1): You would do there's a little financial downside to it, but the other side it makes so much sense for the whole industry. And this well aspect hasn't yet found um entrance in the new FCA standard. And the new FCA standard still is not complete and has uh severe deficiencies on the legal side, by the way. But anyways, um FCAs is a topic where uh Bullingstedt

34:51Unidentified speaker (UNKNOWN): has

34:52Unidentified speaker (speaker_1): been seen as the pilot. And I believe in one thing, especially in an emerging market, that you must create trust

35:00Unidentified speaker (UNKNOWN): on

35:00Unidentified speaker (speaker_1): all parties and all stakeholders, because they deserve it as to join in the game. And our important task to bring a trust was via transparency. We made everything transparent, all the ruling, and now even the operational data.

35:16Ed Porter: Yes.

35:16Unidentified speaker (speaker_1): And uh I believe the mourning of the grid operator side and uh has ended with the transparency we brought into the operational scheme of Wollingstedt.

35:25Ed Porter: And what was sort of the end position from the as you say, like this story is a is a date with two sides and this is your side. Were you able to kind of give an impression of what the system operator ended up thinking about the the site now that you made the the information information from the site's operation public.

35:41Unidentified speaker (speaker_1): There is a German saying of the rabbit being shocked in front of the poisonous snake. And the rabbit is the grid operator. This the poisonous snake is the best industry asking for 500 gigawatt of grid capacity. And now imagine the grid operator SH Nets in Boilingstedt seeing operators. operation of 100 megawatt, 0.1 gigawatt with a grid endangering uh aspects, and then ask knowing that there is 5,000 times more coming in. That's impossible. You can't scale. So the the aspect of Boeingstead um being um in a an FCA scheme with a lot of guardrails is that now it has become scalable us to deploy gigawatts and gigawatts of BES into the German markets. It's not true that gigawatts could have been scaled without FCAs. FCA is the etiquette to scale BES in the German market. There's no scaling without Is certain rules. Of course, you can discuss about

36:47rules, why rules are different at TSO level. Yes, because TSOs DSOs have. more tools to control their connected assets, much more than the uh DSOs. You can say DSOs could do better in the the digitalization of their operation. They're not doing really well, they need to improve. But nevertheless, even if they would do really well, you need still guardrails.

37:09Ed Porter: Yeah.

37:10Unidentified speaker (speaker_1): And before scaling.

37:11Ed Porter: Mm-hmm. And if you can get this transparency and this etiquette right. the sort of poisonous snake becomes less uh less concerning and it's a happier relationship.

37:20Unidentified speaker (speaker_1): Well, the snake is not a danger to the rabbit anymore because it's behind the glass.

37:25Ed Porter: Okay, there we go.

37:27Unidentified speaker (UNKNOWN): It's

37:27Unidentified speaker (speaker_1): protected.

37:27Ed Porter: I think we have a lovely name for the episode now, you know, the rabbit and the poisonous snake, and people will have to listen to this point to find out what on earth we're talking about. Um okay, one final question. Uh what is a contrarian view you hold? about the energy market in Germany?

37:41Unidentified speaker (speaker_1): Well, I I need to highlight FCAs because FCAs are a pain to the industry, but they are very, very important. And I believe the license to operate in the German market comes with etiquette and FCAs, as we have covered it in this episode. And there's contrarian views on how to actually rule FCAs. I think the foundation for ruling must be operability of the grid. And you can complain that operability is limited because of the lacking digitalization of the grid. I don't think there's a contrarian view on this that DSOs and DSOs could do more. But there's there's uh different opinions on what the actual solution could be. You've covered it with uh green flexibility and keon lately in your episode. My view is that these uh concepts don't incorporate actually the scale. scalability of the solution. Therefore, I I uh really like the Aeon approach, despite of still some corners to be shaped. And I like the TSO approach. Both are designed to be scalable and still reliable and operate for the

38:41security of grid supply, even in a fully renewable system. And that is where what EchoStore is aiming for. We still have a lot to do and we want to be in the game. after FCAs, being agile as to compensate and mitigate their financial impact and play it until the end.

38:57Ed Porter: Okay. And just to give uh one one sort of that that final piece that you're talking about system operability, you're saying you would like that sort of control to remain with the system operator under the FCA. That's kind of the critical twist to what we would have had on previous episodes.

39:13Unidentified speaker (speaker_1): It has to. There's no other choice. And you come to that point when you deploy assets in a certain amount and come to certain volumes that I don't see other ways. Grid operators do not do not see other ways. If anyone comes around as and have better concepts,

39:29Ed Porter: yeah.

39:29Unidentified speaker (speaker_1): Fine to understand. I'm open for new concepts. And at the moment I am contrarian on seeing let the grid operator be controlling his grid and us contemplating with the rules and freedom of space he gives us because it's enough to invest.

39:44Unidentified speaker (UNKNOWN): Yeah,

39:44Ed Porter: super. Georg, thank you very much for coming on. You've been a wonderful guest and all eyes on what happens in Germany next year.

39:49Unidentified speaker (speaker_1): Thank

39:50Unidentified speaker (UNKNOWN): you.