Cabral Gold triples resource to 3.5M oz and self-funds Phase 2 PEA via oxide production
Summary
Alan Carter reports that Cabral Gold's Cuiú Cuiú district resource estimate has nearly tripled from 1.2 million ounces to 3.5 million ounces across six deposits. The company distinguishes between 3 million ounces of hard rock material and 500,000 ounces of oxide material, noting the hard rock contains high-grade zones averaging 2.3 g/t at a 1.00 g/t cutoff. Carter emphasizes that the company is self-funding its path to a Phase 2 Preliminary Economic Assessment (PEA) through current oxide operations producing ~3,000 ounces per month, avoiding capital dilution. He highlights that the resource growth is driven by additional drilling rather than changes in pit assumptions, and notes the use of a more conservative 0.35 g/t cutoff despite higher gold prices. The current heap leach operation boasts an all-in sustaining cost of approximately $1,200 per ounce.
Key takeaways
- 1 All six deposits are open at depth and four or five are open along strike, providing significant exploration upside beyond the current resource boundary.
Alan Carter · 2:35
- 2 The company adopted a more conservative 0.35 g/t cutoff for hard rock resources in this update compared to the 0.26 g/t used in 2022, despite gold prices being roughly double, which adds credibility to the resource estimate.
Alan Carter · 4:14
Episode sections
- 0:00 – 0:36
Resource Update and District Growth
Alan Carter announces a new resource estimate for the Cuiú Cuiú district, noting the indicated and inferred resource has grown from 1.2 million ounces to 3.5 million ounces across six deposits. He highlights that the district is becoming one of the largest undeveloped primary gold deposits in Brazil.
- 0:36 – 1:36
Hard Rock vs Oxide Material and Grades
Carter distinguishes between approximately three million ounces of hard rock material and half a million ounces of oxide material. He notes that while oxide is currently mined, the hard rock contains high-grade material, with nearly two million ounces averaging 2.3 grams per tonne at a 1.00 g/t cutoff.
- 1:36 – 3:45
2027 Development Plans and Self-Funding
The company aims to complete a Preliminary Economic Assessment (PEA) by the end of Q3 2027 to evaluate the hard rock resource. Carter emphasizes that the company is self-funded through its current oxide operation, generating about 3,000 ounces of gold per month, avoiding the need for capital dilution.
- 3:45 – 5:03
Conservative Cutoffs and Market Context
Carter explains that despite gold prices doubling since 2022, the company used a more conservative 0.35 g/t cutoff for hard rock resources compared to the previous 0.26 g/t. He attributes the resource growth primarily to additional drilling rather than changes in pit assumptions.
- 5:03 – 8:25
Operational Costs and Future Drilling Focus
The current heap leach operation has an all-in sustaining cost of approximately $1,200 per ounce. Carter states that 2027 infill drilling will focus on upgrading the resource inventory, particularly in the primary material which averages 1.14 g/t overall but contains significant high-grade zones.
Assets discussed
| Asset | Kind | Stance | Context |
|---|---|---|---|
| Gold | commodity | neutral | It changes things a lot, Matt. I mean the the the indicated and inferred resource within the district has grown from about 1.2 million to 3.5. So it's a massive, massive jump. We now have six gold deposits. I mean, and it's only going to get bigger. It's going to keep growing. |
“Stance” is how the speakers talked about the asset, not a recommendation.
Claims worth verifying
The indicated and inferred resource within the Cuiú Cuiú district has grown from about 1.2 million ounces to 3.5 million ounces.
Matt ·0:09
How to verify: Check Cabral Gold's press release dated November 2026 for the updated Mineral Resource Estimate (MRE) for the Cuiú Cuiú district. For recent events, verify 2026-08-22 through 2026-11-22. Use another period only when the speaker explicitly names it.
The district now contains six gold deposits, up from three in the previous hard rock estimate.
Matt ·0:27
How to verify: Review the MRE technical report or press release from Cabral Gold detailing the number of deposits included in the new estimate. For recent events, verify 2026-08-22 through 2026-11-22. Use another period only when the speaker explicitly names it.
The hard rock material comprises about three million ounces, with 1.9 million ounces averaging 2.3 grams per tonne at a 1.00 g/t cutoff.
Alan Carter ·0:56
How to verify: Verify against the specific grade-tonnage tables in the updated MRE report for the hard rock resource at the 1.00 g/t cutoff. For recent events, verify 2026-08-22 through 2026-11-22. Use another period only when the speaker explicitly names it.
The company aims to complete a Preliminary Economic Assessment (PEA) for the hard rock resource by the end of Q3 2027.
Unidentified speaker (UNKNOWN) ·2:35
How to verify: Check Cabral Gold's corporate presentation or investor updates for the timeline of the Phase 2 PEA. For recent events, verify 2026-08-22 through 2026-11-22. Use another period only when the speaker explicitly names it.
The current oxide operation produces approximately 3,000 ounces of gold per month.
Unidentified speaker (UNKNOWN) ·3:01
How to verify: Review Cabral Gold's quarterly production reports or operational updates for monthly gold production figures. For recent events, verify 2026-08-22 through 2026-11-22. Use another period only when the speaker explicitly names it.
The company used a 0.35 g/t cutoff for hard rock resources in the new estimate, compared to 0.26 g/t in 2022.
Alan Carter ·4:14
How to verify: Compare the cutoff grades listed in the 2026 MRE report against the 2026 hard rock resource estimate report. For recent events, verify 2026-08-22 through 2026-11-22. Use another period only when the speaker explicitly names it.
The all-in sustaining cost (AISC) of the current heap leach operation is approximately $1,200 per ounce.
Unidentified speaker (UNKNOWN) ·5:03
How to verify: Check the Pre-Feasibility Study (PFS) or Pre-Feasibility Study (PFS) referenced by Carter, or recent operational cost disclosures in Cabral Gold filings. For recent events, verify 2026-08-22 through 2026-11-22. Use another period only when the speaker explicitly names it.
Primary sourceThe oxide material has a cutoff of 0.1 g/t and averages 0.4 g/t, while current feed is 1-2 g/t.
Alan Carter ·7:41
How to verify: Verify against the MRE report for oxide resource grades and Cabral Gold's operational reports for current mill feed grades. For recent events, verify 2026-08-22 through 2026-11-22. Use another period only when the speaker explicitly names it.
The primary (hard rock) material makes up 86% of the total 3.5 million ounce resource.
Alan Carter ·7:21
How to verify: Calculate the percentage of primary vs. oxide ounces from the MRE tables in the updated resource report. For recent events, verify 2026-08-22 through 2026-11-22. Use another period only when the speaker explicitly names it.
The gold price used for pit shells in the resource estimate is $3,500/oz.
Matt ·3:45
How to verify: Check the assumptions section of the updated MRE report for the gold price used in economic modeling. For recent events, verify 2026-08-22 through 2026-11-22. Use another period only when the speaker explicitly names it.
Do your own research
- Verify the 3.5 million ounce resource estimate against the official NI 43-101 technical report filed with SEDAR+ for Cabral Gold (TSXV:CBR).
- Check the company's latest quarterly operational reports to confirm the 3,000 ounces per month production rate and the ~$1,200/oz all-in sustaining cost (AISC).
- Review the 2022 technical report to compare the historical 0.26 g/t cutoff against the new 0.35 g/t cutoff and assess the impact on resource classification.
- Analyze the company's cash flow statements to verify self-funding status and ensure no recent equity raises or debt issuances contradict the claim of avoiding dilution.
- Research the Cuiú Cuiú district's infrastructure and permitting status in Brazil to assess the feasibility of the planned Phase 2 PEA completion by Q3 2027.
- Look for independent geological audits or peer reviews of the Cuiú Cuiú deposit to validate the claim that all six deposits are open at depth and along strike.
- Compare Cabral Gold's AISC against other Brazilian gold producers to contextualize the competitiveness of the $1,200/oz cost figure.
- Check for any insider trading disclosures or related-party transactions that might indicate conflicts of interest regarding the self-funding narrative.
Full transcriptexpand
0:00Alan Carter: My name's Alan Carter. I'm the president and CEO of Corral Gold. We've just built our first gold mine in Brazil and we've just announced a new resource something.
0:09Matt: You have indeed. So how does this change things, Alan?
0:12Alan Carter: It changes things a lot, Matt. I mean the the the indicated and inferred resource within the district has grown from about 1.2 million to 3.5. So it's a massive, massive jump. We now have six gold deposits. I mean, and it's only going to get bigger. It's going to keep growing.
0:27Matt: Okay. And in terms of what you've what you've seen here, I mean, i I know it's early days, but does how how does this change the way you think you'll develop the project?
0:36Alan Carter: Um look, we've always known that Kuyukuyu is a district, so I I don't think it changes things, but obviously it's it it it's getting quite large. And the other interesting thing about it is that um, you know, there's about three million ounces here, which is hard hard rock. material and about half a million ounces now which is oxide material. As you know, we're mining the oxide material right now. But but the hard rock material has pretty good grade. It's it's over a gram. Actually, if you raise the cutoff to about one gram a ton, um within that three million ounces there's about one point nine million ounces, which is averaging about two 2.3 point three grams a ton. So there's a lot of high grade material, as I've said to you in the past. So um it's a big jump. This makes it one of the largest gold deposits in Brazil. Certainly the largest deposit in Tapajos region by quite some size. And it's the second largest undeveloped primary gold deposit in Brazil. So yeah, look, um, the priority for us uh moving forward here, looking at 2027, is um obviously we want to keep growing this resource, but we also want to up. upgrade the resource that we've just announced too. So quite a lot of infill drilling, but also sort of like um you know full speed ahead of the expiration.
1:46Matt: It's it's amazing how um things have changed. This was meant to be a kind of starter project, some cash flowing to get after the the the the bigger uh prize, as it were. I I guess that hasn't changed much, but the the even the the s scale of this must be surprising, even you.
2:00Alan Carter: Um yeah, look, I mean i you know, you and I have been chatting for some time and it and and you know, and I I've always maintained that I think this is going to be quite large and and it is getting to be significantly large. Um the next step for us now, now we've got something, you know, a hard rock or prime resource of this sort of size, it's over three million ounces right now. As I said, it it's it's it's gonna keep growing. Um
2:25Unidentified speaker (UNKNOWN): what
2:25Alan Carter: we'll do next in twenty twenty. seven was we'll get a PA done. So by the end of the the third quarter of of twenty twenty seven, I'd like to have a PA and then that will give some visibility on
2:35Unidentified speaker (UNKNOWN): you
2:35Alan Carter: know what the viability is of that hard rock resource. But it's got excellent grade, there's a lot more of it. Um all of the gulp deposits that we've got, we've got six now in very close proximity, um, they're all open at depth and four arguably five of them are open along strike. So and then and then we've got 50 peripheral targets here, you know, where we where we found gold and other places and trenching and reconnaissance drilling. We've got boulder fields here, Matt, that average uh three ounces a ton.
3:01Unidentified speaker (UNKNOWN): But you
3:01Alan Carter: know, we we've never tested. And now we've got you know cash flow from the um heat leak operation, which is mining the sacralite material. We're doing about three thousand ounces a month right now. So we're self funded. Uh we don't need to go and dilute the capital. structure with this company any further. Um yeah, we've got a lot of work to do. But um
3:19Unidentified speaker (UNKNOWN): you
3:20Alan Carter: know we're um we're in production and and we're and we're growing this enormous district in northern Brazil.
3:25Matt: Look and I and I think obviously it's it's a changing world out there at the moment. I think the resource pets used like thirty five hundred gold and perhaps that's good news indeed g given where we are today. And Um so y you y you you'll be you'll be making money for sure. Um can you just let me know how much of the the new answers came through drilling? How much came to change is in the model or the pit assumptions? You know, how much how much has really changed and in f and obviously lend comfort to um retail and say, you know, does this still look good at three thousand dollar gold?
3:55Alan Carter: Yeah, look most of it came through additional drilling. Obviously the last coin that we updated the hard rock resources four years ago, so the gold price was a lot lower. The gold price has backed off. Um back in twenty-two for the the the uh the actual uh cutoff for the uh for for the hard rock material, we used a point two six gram cutoff. And even though the gold price is has has risen considerably, even with the pullback, it's doubled what it was four years ago. But we've used we've been more conservative with our cutoff. So instead of using a.26 a point two six gram cutoff. that we used uh four years ago, we used a point three five gram cutoff. So um you know, yes, I mean it has been a bit ugly in terms of of the gold market. We'll see what happens into the new year. Um yeah obviously interest rates are going up. Um but uh but you know we've got an emerging district here and and I think the big worry for a lot of companies or junior companies, particularly on the expiration size is side is you know they they've got to raise money, and I know that very well. So you've got to keep coming back to the market. Share price is low, you're gonna suffer a lot more dilution. We don't have to do that.
5:03Unidentified speaker (UNKNOWN): You know,
5:03Alan Carter: we've got a very low cost heap leach operation which has uh got an all in sustaining cost as per the uh pre pre-feasibility feasibility study of about twelve hundred dollars an ounce. Now there's been some inflation with fuel prices and stuff, but still it's very, very low cost operation where we're mining work now, and it's it's uh we're mining satellite materials, so there's no drilling and blasting, there's no crushing grinding. So you know to have that uh little cash generating engine uh and fake that phase one heaping each up is uh puts us in a in in a pretty good position.
5:36Matt: Generating early your own money gives you options uh for for showing in a great position from that point of view. In terms of where these um nuances are gonna come from um that are gonna hit the heat bleach uh pads first. Where where where's this where where where's which of these which of these depositors are gonna come from? You know, where are you gonna kind of focus your additional infill drilling in twenty twenty seven?
5:57Alan Carter: Well, all of the gold deposits projects that we've got, Matt, have this um oxidized oxidised material on the top. which is about sixty metres thick. It's weathered material. So we've added about two hundred thousand ounces to that inventory, that resource inventory. So we're now at half a million. That's grown quite a lot. That's going to continue to grow. Some of it's very, very good material. But the really big jump is in that primary material. And as I said, a lot of it is excellent grain. I mean one point nine million ounces of that is is well over up well over two grams. two point three grams or so. So for an you know for an open pit mining operation that the grades here are excellent. So you know, we've got a lot of work to do. I and there'll be a lot of drilling uh moving forward infill drilling as we as we work to um upgrade the invert resources here. There's a lot of invert material in both the oxide and the hard rock. But uh these deposits as I said are all still open. So you know we're gonna keep uh we're gonna keep exploring as well. It's it it's been a very busy year. I think next year's gonna be a very exciting year too, moving
6:57forward. It's um there's a lot to do.
6:59Matt: Well, look, um just kind of finishing up because I'm not I know you're in a you're in an airport, just to explain to folks, there's a bit of noise in the background. Uh just coming back from Brazil uh on on his way to London to speak to some investors there. Um just remind us of the kind of grades so people can work at them. and do the math themselves, the kind of grades that we're talking about and the kind of recoveries that you're you're coming up against.
7:21Alan Carter: Well, the the the the the resource, the three point five million uh ounce resource that we put out is about eighty six percent primary material. And the point three five cutoff that material average is It's about one hundred 141 one grams a ton. As I said, at a one gram cutoff, we have almost two million ounces about 1.9 million ounces, about 2.3 grams a ton. The oxide material is lower grade. It's got a lower cutoff. It's got a cutoff of about 0.1 grams a ton. It's much uh you know, it's near surface, it's very, very cheap to mine it. So we've got about half a million ounces of that, averaging about 0.4 grams or so. But right now, what we're mining in the oxide material is quite a lot higher grade than that. It's six more like one gram on two material two. material that we're putting through the plant right now. So um yeah, it's there's a lot of very good grade material. As I said, it's um it's all open fit.
8:11Matt: Well Alan, look I appreciate you making the time for us uh on en route uh or in transit, I should say. Um great way to kind of finish the year. I know you've got the money to get on and do what you need to do in terms of the drilling into twenty twenty seven. Um we'll see you soon. Thank you.