Company Interviews

Santacruz Silver CEO outlines 2027 growth targets driven by Bolivar recovery, Zimapan upgrades, and M&A strategy

21 min Listen to the original Episode page
Silver MiningMexico MiningCapital AllocationOperational EfficiencyM&A Strategy

Summary

Santacruz Silver Executive Chairman and CEO Arturo Préstamo Elizondo discusses the company's operational recovery and growth strategy for 2027. He confirms that dewatering at the Bolivar mine was completed on time and on budget, returning the mine to production in Q4 2026, with two high-grade silver blocks expected online in mid-to-late Q1 2027. The company invested over $15M in the Zimapan mine to increase throughput and grades, targeting an 8-10% production increase with a 1.5-year payback period. Additionally, Santacruz Silver acquired a dedicated mill for San Lucas to restore production levels after internal capacity constraints. With a debt-free balance sheet holding $130M in cash, the company targets at least 20% growth in profitable ounces for 2027 through operational efficiencies, the Soracaya development asset, and potential M&A.

Key takeaways

  1. 1
    we have an internal policy that runs through our all of our minds, mines uh through our all of our operations, and uh the geology department. needs to inventory at least one point three times what the mining department is depleting.

    Unidentified speaker (speaker_0) · 5:29

  2. 2
    Right. Yes, I mean we're seeing opportunities, Matt. Um we're building a lot of cash. I mean, Q3, uh we end up the quarter with around $130 million dollars in the Treasury, uh very clean balance sheet nowadays. no deb, no, no streamings, no royalties attached. So we we have a lot of uh

    Unidentified speaker (speaker_0) · 13:49

Episode sections

  1. 0:00 – 2:06

    Intro and Macro Outlook

    Arturo Préstamo Elizondo introduces himself as Executive Chairman and CEO of Santacruz Silver. The speakers discuss the volatility of metal prices and the importance of preparing for inflationary pressures regardless of price direction.

  2. 2:06 – 3:29

    Bolivar Mine Recovery and Production

    Elizondo confirms that dewatering at the Bolivar mine was completed on time and on budget, returning the mine to production in Q4. He highlights the identification of two high-grade silver blocks expected to come online in mid-to-late Q1 2027.

  3. 3:29 – 4:47

    Zimapan Investments and Efficiency Gains

    The CEO discusses investments of over $15M in the Zimapan mine over 15 months, targeting a payback period of 1.5 years. These investments aim to increase throughput, head grades, and mill recoveries, with expected production increases of 8-10%.

  4. 4:47 – 9:50

    Resource Estimates and Inventory Policy

    Santacruz Silver plans to file a resource estimate soon, including a maiden report for Zimapan. The company maintains a policy of maintaining geological inventory at 1.3 times the mining depletion rate to ensure operational flexibility against cost inflation.

  5. 9:50 – 13:23

    San Lucas Ore Sourcing and Mill Acquisition

    Elizondo explains that San Lucas production dropped because the company's own mines are consuming more milling capacity. To address this, the company acquired a 500 tons/day mill dedicated to San Lucas, aiming to restore and grow its production by another 10% next year.

  6. 13:23 – 19:00

    M&A Strategy and Balance Sheet Strength

    With $130M in cash and a clean balance sheet, the company is actively seeking M&A opportunities. Elizondo emphasizes a conservative approach, focusing on projects that require a 'tailor-made' operational approach rather than just specific geologies.

  7. 19:00 – 20:46

    2027 Growth Targets

    The company targets at least 20% growth in 2027, measured in profitable ounces. This growth is expected to come from efficiencies at existing mines, the Soracaya development asset, and potential M&A.

Assets discussed

AssetKindStanceContext
SilvercommoditybullishYeah. We're I'm bullish about silver and zinc definitely, but um we always uh have to prepare, no?

“Stance” is how the speakers talked about the asset, not a recommendation.

Claims worth verifying

Santacruz Silver spent 2026 preparing operations to run efficiently regardless of metal prices.

Unidentified speaker (speaker_0) ·0:56

How to verify: Company press releases or investor presentations from late 2026 detailing operational strategy and cost management initiatives. For recent events, verify 2026-08-12 through 2026-11-12. Use another period only when the speaker explicitly names it.

Silver price fell from $84.39/oz in Q1 2026 to $62.73/oz in Q3 2026.

Unidentified speaker (speaker_0) ·1:16

How to verify: LBMA Silver Price historical data or London Bullion Market Association reports for Q1 and Q3 2026. For recent events, verify 2026-08-12 through 2026-11-12. Use another period only when the speaker explicitly names it.

Zinc price rose from $3,243/t to $3,830/t over the same period.

Unidentified speaker (speaker_0) ·1:16

How to verify: LME (London Metal Exchange) zinc cash settlement prices for Q1 and Q3 2026. For recent events, verify 2026-08-12 through 2026-11-12. Use another period only when the speaker explicitly names it.

Santacruz drew 53.2% of H1 2026 revenue from silver and 40.3% from zinc.

Unidentified speaker (speaker_0) ·1:16

How to verify: Santacruz Silver H1 2026 financial results or interim report filed on SEDAR+. For recent events, verify 2026-08-12 through 2026-11-12. Use another period only when the speaker explicitly names it.

Bolivar mine dewatering ran on time and on budget after May 2025 water inflow.

Unidentified speaker (speaker_0) ·2:06

How to verify: Santacruz Silver operational updates or press releases from Q4 2026 confirming dewatering completion and budget adherence. For recent events, verify 2026-08-12 through 2026-11-12. Use another period only when the speaker explicitly names it.

Q3 2026 silver output was 408,087 oz, up 19% QoQ and 209% YoY.

Unidentified speaker (UNKNOWN) ·2:25

How to verify: Santacruz Silver Q3 2026 production report filed on SEDAR+. For recent events, verify 2026-08-12 through 2026-11-12. Use another period only when the speaker explicitly names it.

Bolivar head grade rose to 186 g/t from 165 g/t.

Unidentified speaker (UNKNOWN) ·2:25

How to verify: Santacruz Silver Q3 2026 production report filed on SEDAR+. For recent events, verify 2026-08-12 through 2026-11-12. Use another period only when the speaker explicitly names it.

Two high-grade silver blocks at Bolivar are targeted for production in mid-to-late Q1 2027.

Unidentified speaker (speaker_0) ·2:45

How to verify: Santacruz Silver mine plans or operational updates for Bolivar mine in late 2026. For recent events, verify 2026-08-12 through 2026-11-12. Use another period only when the speaker explicitly names it.

Santacruz invested slightly more than $15M in Zimapan over 15 months.

Unidentified speaker (speaker_0) ·3:48

How to verify: Santacruz Silver capital expenditure reports or press releases detailing Zimapan investments in 2026-2026. For recent events, verify 2026-08-12 through 2026-11-12. Use another period only when the speaker explicitly names it.

Zimapan investment payback is targeted within 1.5 years.

Unidentified speaker (UNKNOWN) ·3:59

How to verify: Santacruz Silver feasibility studies or internal investment memos regarding Zimapan capital projects. For recent events, verify 2026-08-12 through 2026-11-12. Use another period only when the speaker explicitly names it.

Do your own research

  • Verify the Q3 2026 financial statements in the company's latest quarterly report (Form 10-Q or equivalent) to confirm the $130M cash balance and absence of debt/streamings.
  • Review the most recent Technical Report or NI 43-101 filing for the Bolivar mine to validate the status of dewatering and the existence of the two high-grade silver blocks.
  • Check the Zimapan mine's production reports for the last 15 months to verify the $15M investment amount and the 8-10% throughput increase claim.
  • Examine the San Lucas mill acquisition details in recent press releases or regulatory filings to confirm the 500 tons/day capacity and dedicated use.
  • Assess the Soracaya development asset's status by reviewing the company's pipeline disclosures and capital expenditure plans for 2027.
  • Compare the company's geological inventory depletion rate against the stated 1.3x policy in recent operational updates or sustainability reports.
  • Research historical M&A activity in the Mexican silver sector to evaluate the 'tailor-made' operational approach claim and identify potential competitors.
  • Verify the 8.4 million ounces historical production figure against the company's public production history or reserve reports.
Full transcriptexpand
0:00
Unidentified speaker (speaker_0): Good morning. My name is Arturo Prestamo. I'm an executive chairman and CEO of Santa Cruz Silver. Thank you for having me here.
0:07
Unidentified speaker (speaker_1): Arthur, good to see you here. We're here in Switzerland doing the rounds in in Europe and drumming up some interest. Right. It's kind of interesting times at the moment. You know, it's been a it's been an up and down year. Metal prices are holding reasonably well. You happy
0:23
Unidentified speaker (UNKNOWN): with
0:23
Unidentified speaker (speaker_1): metal prices?
0:24
Unidentified speaker (speaker_0): Yeah, they they're are holding as you as you well point
0:26
Unidentified speaker (UNKNOWN): out.
0:27
Unidentified speaker (speaker_0): Yeah.
0:27
Unidentified speaker (speaker_1): Yeah. Okay, so the conversation today I want to have with you is we'll we'll we'll go through the assets and the and the projects and what you've been doing there. But I think ultimately it's for me, it's about how companies prepare for what is to come. Okay, because I th I think we've seen some inflationary pressures this year, Yeah, a little bit. Maybe there's
0:47
Unidentified speaker (speaker_1): more to come and you know, and how do you set yourself up for success for success? uh next year. So um should we s should we start running through the projects initially and we'll talk about some of the things that you're doing?
0:56
Unidentified speaker (speaker_0): Absolutely, Matt. Yeah. Uh well we um well first of all we're always uh preparing our minds for any any challenges in terms of uh uh prices, metal prices, as you will said, uh if we're seeing inflation in the industry, I I I we I feel there's some inflation and
1:16
Unidentified speaker (speaker_0): maybe more to come. So uh we're getting our minds ready so that uh they can be efficiently uh running uh on following years regardless of where metal pr metal prices go. Yeah. We're I'm bullish about silver and zinc definitely, but um we always uh have to prepare, no? not
1:34
Unidentified speaker (speaker_1): Yeah for sure. And I'm gonna and I guess I'm gonna shape the questions to to the that point 'cause I've seen some um improvements across the group and obviously with mining it's uh it's ups and downs and you know there's some things which you know ha have changed not um n not necessarily upwards. Um Bolivar, let's start with that easy one. Okay with with some
1:54
Unidentified speaker (speaker_1): flooding there. Yeah dealt with that and I'm interested in see how how you've kind of got things back up and and running there and how you prepare you're preparing for what may what could happen to the downside.
2:06
Unidentified speaker (speaker_0): Well definitely Bolivar, it's a very specific case and uh all merit to our team, Eduardo Torresillas down there, uh leading uh operations and that the watering process has gone on time, on budget. Uh we're now at uh Q Q4 four and the mine is already back on track. Yeah.
2:25
Unidentified speaker (UNKNOWN): So
2:26
Unidentified speaker (speaker_0): so we're uh we're very very pleased to see that we met our budget or uh and and more so that we have the mine back on track. We even expect the mine to come stronger than before as we identified two high grade blocks, silver blocks at Bolivar. At Bolivar. Uh they are going to come
2:45
Unidentified speaker (speaker_0): into production uh mid to late uh Q1 Q one uh this next year. So the mine is going to come stronger. So we're very, very pleased to see how things uh with those challenging sit that challenging situation was uh managed and uh finally solved.
3:02
Unidentified speaker (speaker_1): Good. So can give us a sense of you know what your expectation is in terms of uh guidance uh moving forward with
3:09
Unidentified speaker (speaker_0): for for this year we're closing uh w we should close the year with around eleven. 11 million ounces silver equivalent in production, um where revenues will be around 60% coming from silver. Next year we expect a slight increase uh coming from efficiencies, and efficiencies will come from uh CIMAPAN,
3:29
Unidentified speaker (speaker_0): from Mexico.
3:30
Unidentified speaker (speaker_1): Yeah.
3:31
Unidentified speaker (speaker_0): We're making some um, I mean, we're already capitalizing uh on the on the on the investments that we did uh over the last. fifteen months and we're seeing the the fruits of uh of those coming well or the
3:45
Unidentified speaker (UNKNOWN): how much
3:45
Unidentified speaker (speaker_1): was that fourteen million? How much how much did you invest on that?
3:48
Unidentified speaker (speaker_0): We invest around uh around a little bit more than fifteen million.
3:52
Unidentified speaker (UNKNOWN): Fifteen
3:52
Unidentified speaker (speaker_1): million in the end, okay. And what's the kind of expected payback on that then?
3:56
Unidentified speaker (speaker_0): Uh it's going to be in no more than uh
3:59
Unidentified speaker (UNKNOWN): a
4:00
Unidentified speaker (speaker_0): year and a half.
4:01
Unidentified speaker (speaker_1): Okay. Yeah.
4:01
Unidentified speaker (speaker_0): Yeah.
4:02
Unidentified speaker (UNKNOWN): It's uh
4:02
Unidentified speaker (speaker_0): it's a very high volume mine and uh with that uh we're what we're achieving is higher silver upgrades uh and sink uh grades in other words high higher head grades. We're also adding uh more tonnage throughput to the mill, around six thousand tons out of seventy four thousand that were on a monthly basis
4:22
Unidentified speaker (speaker_0): milling. And we are also achieving better recoveries at our mill. no? So those three things will allow us to increase production at Simapan in around eight to ten percent.
4:33
Unidentified speaker (UNKNOWN): Okay,
4:33
Unidentified speaker (speaker_1): and and with with things like that, I mean there's the there's a milling capacity and then there's the plants. And how how how do you do you like to um have a lot in reserve in terms of inventory? Oh
4:45
Unidentified speaker (speaker_0): yeah.
4:45
Unidentified speaker (speaker_1): You do. Okay. So tell me about that.
4:47
Unidentified speaker (UNKNOWN): Yeah,
4:47
Unidentified speaker (speaker_0): uh that's a good very good question, Matt. And actually um we're going to be posting uh or filing, I'm sorry, uh a resource estimate across all of our minds.
4:57
Unidentified speaker (speaker_1): Yeah
4:57
Unidentified speaker (speaker_0): uh very soon and um and you will see resources increasing significantly. Uh especially in Cimapan. Cimapan will be filing um a maiden report, I mean for the first time and uh and you will see a very strong uh
5:13
Unidentified speaker (UNKNOWN): um uh
5:15
Unidentified speaker (speaker_0): volume uh or number of tonnage uh
5:18
Unidentified speaker (speaker_1): yeah.
5:19
Unidentified speaker (speaker_0): My life in Simapan is today north of uh eight years and and and growing literally as we keep drilling, as we keep uh inventorying.
5:29
Unidentified speaker (speaker_1): Yeah,
5:29
Unidentified speaker (speaker_0): we have an internal policy that runs through our all of our minds, mines uh through our all of our operations, and uh the geology department. needs to inventory at least one point three times what the mining department is depleting.
5:44
Unidentified speaker (speaker_1): Okay.
5:44
Unidentified speaker (speaker_0): And we have been meeting those targets meeting those targets year over year. So I'm sure that when you see the resource estimate coming out uh very soon you will see that the mines are uh
5:58
Unidentified speaker (speaker_1): tell me about the one 1.3 point three number because if I if I look at we're talking about inflationary factor factors, right? Energy costs at the moment, right? So if I'm looking at milling costs as an energy component to that, and you when you if you look at energy costs rising, does one point three become one point two? Because uh because
6:16
Unidentified speaker (speaker_0): how
6:16
Unidentified speaker (UNKNOWN): do you think about
6:16
Unidentified speaker (speaker_0): it? Well, in our case, uh we we're always preparing our minds in and having some areas that
6:24
Unidentified speaker (UNKNOWN): are
6:25
Unidentified speaker (speaker_0): ready to come into production. at any given time. And the main idea is that uh if we see inflation uh or pressure coming into or squeezing margins, we always have areas that we can uh put into production that are already prepared, no? So we are always trying
6:45
Unidentified speaker (speaker_0): to advance or be uh advancing or preparing our minds uh ahead.
6:50
Unidentified speaker (speaker_1): Yeah.
6:50
Unidentified speaker (UNKNOWN): And
6:50
Unidentified speaker (speaker_0): that always gives you flexibility, no. What you can sometimes work with is uh with exploration. We always want to have uh at here at least five years of uh
7:01
Unidentified speaker (UNKNOWN): uh
7:02
Unidentified speaker (speaker_0): life of mind ahead of us. But sometimes uh if we see that we need to control cost uh we can uh play a little bit more with uh with the exploration uh uh Capix capex and uh so some other capex that do not compromise uh the mines. Never with uh with the infill drilling because that's our
7:21
Unidentified speaker (speaker_0): day-to-day uh
7:23
Unidentified speaker (speaker_1): yeah yeah for sure with the with the type of mining that you've got. Um
7:26
Unidentified speaker (UNKNOWN): I'm
7:26
Unidentified speaker (speaker_1): always interested in that kind of arbitrary decision making by the board where um you know you you've got to obviously as as you say prepare for the for the future
7:36
Unidentified speaker (UNKNOWN): but
7:37
Unidentified speaker (speaker_1): there's things that you're in control of things you're not in control of obviously metal prices being one of them and costs being being being another
7:44
Unidentified speaker (UNKNOWN): the
7:44
Unidentified speaker (speaker_1): efficiencies that we're talking about in this conversation about driving margin ultimate margin is is ultimate hopefully at least the free free cash flow in most cases um is what's the arbitrary stream well we we can keep shaving away we create you know we can engineer more and more efficient things but but it it starts harming us at some point.
8:04
Unidentified speaker (speaker_0): Right. Well,
8:06
Unidentified speaker (UNKNOWN): if
8:06
Unidentified speaker (speaker_0): you allow me, let me go back to Cimapanto, our Mexican mine again as an example. No, um since the last 18 months, we felt that it was the right moment for us to start more aggressively investing into that mine. We have very encouraging results at level 960, so uh we thought it was
8:26
Unidentified speaker (speaker_0): the most moment for us to really put money into that mine and prepare the mine for um moments where uh we will see margins uh narrowing. So um
8:40
Unidentified speaker (speaker_0): we are already starting to see the fruition of those investments, no?
8:44
Unidentified speaker (UNKNOWN): Yeah,
8:45
Unidentified speaker (speaker_1): yeah.
8:45
Unidentified speaker (speaker_0): So uh uh what I want to point out is that uh the investments that we did uh when the right time mom when the right time was uh and the mind was generating and is still generating a lot of uh cash flow, uh we're preparing our minds and get them getting them ready for moments where uh margins
9:05
Unidentified speaker (speaker_0): will get uh narrower.
9:07
Unidentified speaker (speaker_0): If if that does not happen
9:10
Unidentified speaker (UNKNOWN): that's
9:10
Unidentified speaker (speaker_0): better.
9:11
Unidentified speaker (UNKNOWN): That's great, no? Yeah.
9:12
Unidentified speaker (speaker_0): Uh but the mine is already doing uh better. than what it was before. And the CapEx are now more controlled, but you have a mine that has more tonnage throughput, better head grates, and better recoveries of the meal. So you have a more efficient mine overall.
9:34
Unidentified speaker (speaker_0): That's in Bolivia.
9:35
Unidentified speaker (speaker_1): Yeah, and and and and well, so I'm showing the that point. po Yeah, it's in Bolivia, but I'm sorry. showing the portfolio uh across the board you've you've um processed more of your own ore as a result and and and less of the bought in paid the purchased ore. So
9:50
Unidentified speaker (speaker_1): you have there's not much scope for
9:53
Unidentified speaker (UNKNOWN): there
9:53
Unidentified speaker (speaker_1): is there? 'Cause how much you're buying in
9:55
Unidentified speaker (speaker_0): there's uh that that's uh actually that's a good question, Matt, because we just announced a few uh like a month and a half ago. we announced the acquisition of of a five hundred ton a day meal.
10:06
Unidentified speaker (UNKNOWN): Yes,
10:06
Unidentified speaker (speaker_1): I
10:07
Unidentified speaker (UNKNOWN): which
10:07
Unidentified speaker (speaker_0): will be dedicated for this company, the San Lucas Old Sourcing Company, no?
10:11
Unidentified speaker (speaker_1): Yeah.
10:11
Unidentified speaker (speaker_0): And what what has been happening, uh if you see our Q three numbers and you see San Lucas,
10:17
Unidentified speaker (speaker_1): mm,
10:17
Unidentified speaker (UNKNOWN): you
10:17
Unidentified speaker (speaker_0): will see that San Lucas production came down.
10:21
Unidentified speaker (speaker_1): Yeah.
10:21
Unidentified speaker (speaker_0): Like uh significantly. Was
10:23
Unidentified speaker (speaker_1): that a head crate or
10:24
Unidentified speaker (speaker_0): no, no. It it was because you you process less ore from from third party from small miners because your mines are growing.
10:33
Unidentified speaker (speaker_1): Right.
10:33
Unidentified speaker (speaker_0): Your mines are using more milling capacity of their own meals. Yeah. So uh we're leaving uh we were leaving
10:42
Unidentified speaker (UNKNOWN): uh
10:42
Unidentified speaker (speaker_0): San Lucas, the oil sourcing company, uh outside uh of of of of the normal schedule that that it re regularly has. No. Our most productive uh ore comes from our own mines, no. So that's why we acquired this uh meal which will be dedicated for San Lucas. Okay. And Saint
11:02
Unidentified speaker (speaker_0): Lucas will uh re I mean come back again with its uh normal uh regular production and will allow this new meal will allow San Lucas to keep growing okay another ten percent next year. It's
11:14
Unidentified speaker (speaker_1): it's and and so and what's the numbers that 'cause it seems like extraordinary to me in terms of the capacity. The like the Q three um milling was what, it's like ninety
11:23
Unidentified speaker (UNKNOWN): plus
11:23
Unidentified speaker (speaker_1): thousand?
11:24
Unidentified speaker (speaker_0): We we have no it's five hundred tons per day. But
11:27
Unidentified speaker (UNKNOWN): but was
11:27
Unidentified speaker (speaker_1): the but the what's the to what was the total Q three number though?
11:30
Unidentified speaker (speaker_0): The uh
11:32
Unidentified speaker (speaker_0): ounces?
11:33
Unidentified speaker (speaker_1): Yeah.
11:33
Unidentified speaker (speaker_0): Um it was I mean so far uh we have produced around eight point four million ounces.
11:38
Unidentified speaker (speaker_1): Okay. And in terms of tons processed?
11:41
Unidentified speaker (speaker_0): In terms of tons processed by San Lucas um they are around um twenty five thousand tons on the on the
11:52
Unidentified speaker (speaker_0): over the over the each month.
11:54
Unidentified speaker (speaker_1): Yeah.
11:55
Unidentified speaker (speaker_0): Over each month.
11:56
Unidentified speaker (speaker_1): Over each month, okay, fine. Okay.
11:58
Unidentified speaker (speaker_0): That's what we process, not what we
12:00
Unidentified speaker (speaker_1): Yeah, yeah, yeah, yeah, yeah. Okay. Interesting, interesting. Um so you i if you kinda step back and sorry this conversation is a little bit more um at times like this, I'm interested in people who protect to the downside because the upside is great when the when life is good, life was good, right? Um i in terms of the the group group as a whole,
12:20
Unidentified speaker (speaker_1): it there's a lot of moving parts. Yes. You know, and it's um and I know there's a bit control system that you guys run on each of the each each of projects there. But w w how how do you kind of s continue to set the company up for success beyond the projects which we've we talk about each time we make it.
12:35
Unidentified speaker (speaker_0): Well I guess in this industry as in many other industries, um I mean we need to be very responsible as management. Uh we need to be very um conservative on our approach um towards what we're doing and in this case up towards the mines.
12:53
Unidentified speaker (speaker_0): So even though we're experiencing very good times metal price-wise, we need to be very disciplined where we allocate the money and always have a paid back on the on the on any investment that we're doing. No, We cannot uh forget that even though we
13:13
Unidentified speaker (speaker_0): are experiencing a lot of uh cash flows as many other companies are. But discipline should never be uh left out.
13:21
Unidentified speaker (speaker_1): No, for for sure.
13:23
Unidentified speaker (speaker_1): Can lead leads me to the next bit which is not everyone thinks like you. In moments like this, there's opportunities to arise. People become cash constrained, Constraint, um they uh you know bills builds to pay, maybe the cash isn't flowing the way they thought it would, and maybe they're over leveraged in some way, shape, or form. Do you think there are other opportunities? Because you you have a
13:43
Unidentified speaker (speaker_1): certain profile of asset that you'll go for. You're not gonna overpay, you're gonna look for specific things. Do you are you seeing anything else?
13:49
Unidentified speaker (speaker_0): Right. Yes, I mean we're seeing opportunities, Matt. Um we're building a lot of cash. I mean, Q3, uh we end up the quarter with around $130 million dollars in the Treasury, uh very clean balance sheet nowadays. no deb, no, no streamings, no royalties attached. So we we have a lot of uh
14:08
Unidentified speaker (speaker_0): flexibility right now. We are looking for MA initiatives. We have identified a few opportunities.
14:16
Unidentified speaker (speaker_1): Right.
14:17
Unidentified speaker (speaker_0): Hopefully we can um we can take to safe harvard harbor one of these opportunities uh but definitely always with a very conservative approach
14:28
Unidentified speaker (speaker_1): and
14:28
Unidentified speaker (speaker_0): accredited to our investors as we have done the last two acquisitions.
14:33
Unidentified speaker (speaker_0): But yes, there are opportunities as you point out, I mean, companies that for any reason they have a very good project but um maybe they don't have the balance sheet to to to take them uh to the next level or or or
14:50
Unidentified speaker (UNKNOWN): or
14:51
Unidentified speaker (speaker_0): for any other reason uh
14:53
Unidentified speaker (speaker_1): do you think it's it's fair to say that you know s some some of the assets that you've got were uh a little bit broken in the sense that there's some great opportunity there if you can fix those things which you I think you've demonstrated you have. Is that the kind of just wanna make people haven't heard the story before for the type of company you
15:11
Unidentified speaker (UNKNOWN): have I
15:11
Unidentified speaker (speaker_0): yeah I I will I will not say broken but they need it or they required a tailor made um uh approach. No uh for example, when you go to to an underground mine and you have a narrow vein system, you need to run that mine with
15:32
Unidentified speaker (speaker_0): smaller underground equipment,
15:34
Unidentified speaker (speaker_1): yeah,
15:34
Unidentified speaker (speaker_0): with jack leg sometimes, uh with people who knows how to mine and and and how to take cycles um one after another repeatedly and uh and keep advancing.
15:46
Unidentified speaker (speaker_1): Yeah.
15:46
Unidentified speaker (speaker_0): Uh you need to develop you need in the narrow vein system you need to develop three times ahead of what you do in in a wider body, no. So those kind of things uh you need to understand really well uh the competence of uh of the rock that you're working
16:02
Unidentified speaker (UNKNOWN): with.
16:02
Unidentified speaker (speaker_0): Uh
16:03
Unidentified speaker (speaker_0): so
16:05
Unidentified speaker (speaker_0): all those things combine. Um sometimes uh
16:09
Unidentified speaker (UNKNOWN): uh
16:10
Unidentified speaker (speaker_0): companies run a mine with the same formula
16:16
Unidentified speaker (speaker_0): across all the different uh geology uh and mineralization systems. system. So in our case we're very we're we're very boots on the ground, first of
16:26
Unidentified speaker (UNKNOWN): all.
16:26
Unidentified speaker (speaker_0): I think that's uh that's very helpful. But we we feel that every mind is different, very unique, and they need a tailor-made uh approach or formula.
16:37
Unidentified speaker (speaker_1): I I met a um a mind builder in London
16:41
Unidentified speaker (UNKNOWN): a
16:41
Unidentified speaker (speaker_1): month or so ago um and it was quite interesting the way that that uh sort of a a a big company mentality um when you approach a a project compared to a junior, um is saying like g get in and do the metallurgy quickly, do it to a very, very high standard, know exactly where you know what you're
17:01
Unidentified speaker (speaker_1): dealing with. Um also if you're going to do get after the PEA, perhaps do some of those components, not just the network, to a much higher standard. You'll save yourself a year or or or or two because once you understand the rock,
17:13
Unidentified speaker (UNKNOWN): that's
17:14
Unidentified speaker (speaker_1): not gonna going change. to
17:16
Unidentified speaker (speaker_1): You're thinking about how you go chasing after those ounces or those pounds or whatever you're chasing, it will materially ch shape the way that the expiration project works. And you're you you start thinking about the the m the mind design, the mind planning a lot sooner. I mean, for f for you, if you are looking for
17:35
Unidentified speaker (speaker_1): MA, the j ge what's what is the does geology? look like that you that you go for?
17:41
Unidentified speaker (speaker_0): Well, um there's no formula. Uh every every mine is different. Uh so we're not looking exactly for a geology per se. We are looking for projects, Matt, where we can add value, where we feel strong. Um, projects that uh But
17:56
Unidentified speaker (UNKNOWN): it's gonna
17:57
Unidentified speaker (speaker_1): be more than just money, right? Oh
17:58
Unidentified speaker (speaker_0): yeah, absolutely. No, absolutely. And and and I can tell you that uh I think that people is as as important or sometimes more important than an asset.
18:10
Unidentified speaker (UNKNOWN): Yeah.
18:11
Unidentified speaker (speaker_0): People is super important in in this industry, having the right people, the the life the right leaders at each mind.
18:18
Unidentified speaker (UNKNOWN): Uh
18:19
Unidentified speaker (speaker_0): and of course in the in in in the day-to-day day to day operations and and and on the general overview of the company.
18:26
Unidentified speaker (speaker_1): Yeah.
18:26
Unidentified speaker (speaker_0): Um so definitely
18:29
Unidentified speaker (UNKNOWN): uh I
18:30
Unidentified speaker (speaker_0): mean the approach to each mine uh requires a lot of um a lot of planning, definitely and uh and a lot of uh tailor made
18:40
Unidentified speaker (speaker_1): yeah. Yeah. Well well yeah, well you'd h you'd hope so. Not always true. Uh for some of there's the some things I've seen out here. Um and and look twenty twenty twenty seven obviously you you've there's a big kind of setup year, it feels like. This year's been about kind of getting everything where you want it to be, how you want it to be, to feed into what you want to deliver into 2027.
19:00
Unidentified speaker (speaker_1): So people are looking at metal prices and going, Oh I I I don't know what to do here. I think we've established at the beginning, metal prices are just fine if you've got the right setup. Set up. So for for next year, what are you looking forward to?
19:11
Unidentified speaker (speaker_0): Well, we we definitely want to keep growing.
19:16
Unidentified speaker (UNKNOWN): through
19:17
Unidentified speaker (speaker_0): efficiencies, uh as we discussed previously, to organic growth by bringing one of our mines into production, the Sorakaya Mine, and by MA. No, we're ready to uh look for uh opportunities outside of our portfolio. Uh we're ready from a fiscal point of view, from
19:37
Unidentified speaker (speaker_0): a management point of view. view in in all fronts, administratively, um, operationally.
19:43
Unidentified speaker (speaker_1): Yeah.
19:44
Unidentified speaker (speaker_0): And um
19:46
Unidentified speaker (speaker_0): so so we're ready to take that that next step. So next year um I see the company
19:54
Unidentified speaker (UNKNOWN): um
19:55
Unidentified speaker (speaker_0): growing um in a um
20:00
Unidentified speaker (speaker_0): let's say at least
20:03
Unidentified speaker (speaker_0): twenty percent more from what we're today, if you allow
20:07
Unidentified speaker (UNKNOWN): me. Um
20:09
Unidentified speaker (speaker_0): that's going to be our our target.
20:12
Unidentified speaker (speaker_1): How do you measure that? Are you measuring in dollars?
20:15
Unidentified speaker (UNKNOWN): On the balance sheet.
20:17
Unidentified speaker (UNKNOWN): Profitable hours.
20:18
Unidentified speaker (speaker_0): Okay.
20:18
Unidentified speaker (speaker_1): Profitable answers, right?
20:20
Unidentified speaker (UNKNOWN): It's
20:20
Unidentified speaker (speaker_0): different than uh
20:21
Unidentified speaker (UNKNOWN): Yeah. just balance. the noun.
20:23
Unidentified speaker (speaker_1): Okay, okay. Well I I I look forward to see uh seeing what you think
20:26
Unidentified speaker (UNKNOWN): of my next thing. one.
20:27
Unidentified speaker (speaker_1): As as ever great great to see you. And uh and I think it's if I'm an investor looking at this, you know, you want to be looking at for management teams like this who are looking to for those efficiencies and talking about growth and talking about efficiency uh across the board. So I appreciate time today. Thank you.
20:43
Unidentified speaker (speaker_0): My pleasure. Thank
20:44
Unidentified speaker (speaker_1): you. Thank you.
This page was produced automatically: the audio was transcribed with nvidia/parakeet-tdt-0.6b-v3+sortformer-v2.1 and interpreted by Qwen3.6-35B-A3B-UD-IQ3_S.gguf. Transcription and interpretation can contain errors; always confirm against the original episode. Nothing here is investment advice.

More from Company Interviews

Company Interviews

Dune Oil (CSE:DUNE) - Targeting First Production at Türkiye's M47 With C-1 Sidetrack

Episode discussion: Dune Oil CEO Scott Lower discusses M47 block discoveries, C-1 well technical issues, and path to first production in Türkiye.

Speakers’ claims: Dune Oil CEO Scott Lower outlines the company's strategy to bring its C-1 sidetrack in Türkiye's Block M47 to production, citing recent discoveries by state operator TPAO as de-risking the acreage. He attributes previous production failures in the C-1 well to cementing issues rather than reservoir quality, asserting that technical fixes can resolve the problem. The company has raised $8.3 million CAD and converted debt to equity to fund a $4-4.5 million US work program aimed at converting contingent resources to proved reserves. Lower highlights Türkiye's refining infrastructure and low transport costs as key drivers for high netbacks, positioning the stock as a ground-floor opportunity compared to other Canadian producers.

Oil & Gas ExplorationTürkiye EnergySmall-Cap Equities
28 min1 assets10 claims to verify
Company Interviews

Midterms Priced In, Commodity Views Intact: Post-Election Market Read

Episode discussion: Post-midterm market analysis covers AI rotation, commodity views, and Fed expectations

Speakers’ claims: Eric Furson and Sam Pelaez discuss the US midterm election results, noting a 'blue tsunami' with Democrats winning control of Congress. They argue that market outcomes were largely priced in, with flat commodity performance except for crude oil and a strong US dollar. Pelaez highlights aggressive selling in AI stocks, suggesting a rotation into gold and doubting near-term copper demand narratives tied to AI capex. Furson and Pelaez analyze oil market dynamics, viewing recent price pulls from peace talks as potential buying opportunities due to structural deficits. Finally, they assess the upcoming Fed meeting, noting high probability of a rate hike but warning that failure to cut could pose significant downside risk.

Midterm ElectionsAI SectorCommodities
19 min4 assets10 claims to verify
All insights