The Hole Truth: Mining Investment Podcast

David Flanagan outlines Arrow Minerals' strategy to build a low-cost Pilbara iron ore exporter via the Pannawonica project.

22 min Listen to the original Episode page
Iron OrePilbara MiningAtlas IronArrow MineralsSimandouGuinea MiningMining Economics

Summary

David Flanagan, former founder of Atlas Iron and current MD of Arrow Minerals, discusses acquiring an option over the Pannawonica iron ore project in the Pilbara. He positions this asset as the cornerstone for a new mid-cap exporter, citing its proximity to a port and high-grade resource. Flanagan details target economics aiming for a $20/tonne net margin by selling 54% Fe product CIF China at $85-$90 AUD/tonne. He contrasts Arrow's scale with Atlas Iron's original resources and argues that the Simandou project in Guinea is uncompetitive due to high capital costs and logistics. The discussion also covers Arrow's assets in Guinea, including Niagara Bauxite and the Yarraloola Copper Project.

Key takeaways

  1. 1
    The Pannawonica project is located 100km from the port, with one deposit crossing a bitumen road, enabling direct hauling to port and reducing logistics complexity.

    Unidentified speaker (speaker_2) · 2:50

Episode sections

  1. 0:06 – 2:11

    Introduction and Arrow's New Project

    Paul Armstrong introduces David Flanagan, former founder of Atlas Iron, now MD of Arrow Minerals. Flanagan discusses acquiring an option over the Pannawonica iron ore project, which he views as the cornerstone for 'Atlas Mark II' due to its proximity to a port and high-grade resource.

  2. 2:11 – 6:37

    Project Economics and Cost Base

    Flanagan details the Pannawonica project's economics, citing a 62.5 million tonne resource at 53.4% Fe. He outlines a target cost base of $20/tonne to shiploader, aiming for a $20/tonne net margin by selling 54% Fe product CIF China for $85-$90 AUD/tonne.

  3. 6:37 – 11:49

    Growth Strategy and Pilbara Context

    Flanagan explains the strategy to build a mid-cap, multi-billion dollar junior exporter by bolting on projects near the upcoming Marty Port. He highlights the scarcity of such companies post-consolidation and the viability of projects within 300-400km of the new port.

  4. 11:49 – 13:45

    Iron Ore Price Outlook and Simandou Comparison

    Flanagan argues the iron ore price will remain strong, citing backwardation and high costs for the Simandou project in Guinea. He claims Simandou's double freight distance and $22 billion capital cost make it uncompetitive against low-cost Pilbara producers.

  5. 13:45 – 18:03

    Guinea Assets: Niagara Bauxite and Simandou North

    Discussion shifts to Arrow's Guinea assets. Flanagan notes the government has returned frozen tenements for the Niagara Bauxite Project. He highlights the new deep-water port in Guinea as a catalyst, allowing third-party shipping via the existing railway infrastructure.

  6. 18:03 – 21:51

    Yarraloola Copper Project and Exploration Plans

    Flanagan discusses the Yarraloola Copper Project, noting historical gold shows and promising geophysics. He plans to drill and assay for gold and copper, potentially shipping Direct Shipping Ore (DSO) to nearby plants rather than building a processing facility.

Assets discussed

AssetKindStanceContext
Coppercommodityneutralit's got quite a bit of history this year, a little copper project, hasn't it? I mean
Goldcommodityneutralthey were looking for nickel, knew that there was gold nearby, but they were still only assaying for nickel. So we'll go in there, drill, and we'll assay for gold and copper, and we'll apply a similar strategy to that as we do to the iron ore.

“Stance” is how the speakers talked about the asset, not a recommendation.

Claims worth verifying

Arrow Minerals has an option to acquire 100% of the Pannawonica Iron Ore Project from Red Hill Minerals, carrying a 62.5 million tonne resource at 53.4% iron on granted mining leases.

Paul Armstrong ·0:58

How to verify: Check Arrow Minerals (ASX: AMD) ASX announcements regarding the option agreement with Red Hill Minerals (ASX: RHI) and the associated resource estimate. For recent events, verify 2026-08-23 through 2026-11-23. Use another period only when the speaker explicitly names it.

The Pannawonica project is located 100km from the port, with one deposit crossing a bitumen road allowing direct hauling.

Unidentified speaker (speaker_2) ·2:47

How to verify: Review Arrow Minerals project maps and infrastructure plans in ASX announcements or technical reports for the Pannawonica project. For recent events, verify 2026-08-23 through 2026-11-23. Use another period only when the speaker explicitly names it.

Target haulage cost is under ten cents per ton per kilometer; mining cost is $4.50-$6.00; processing cost is ~$5.50; total cost to shiploader is $20 AUD.

Unidentified speaker (UNKNOWN) ·5:12

How to verify: Verify against Arrow Minerals' feasibility studies or scoping studies for the Pannawonica project, or compare with Atlas Iron's historical cost reports. For recent events, verify 2026-08-23 through 2026-11-23. Use another period only when the speaker explicitly names it.

Target selling price for 54% Fe product CIF China is $85-$90 AUD per ton, yielding a $20 AUD/tonne net margin after freight, shiploading, and royalties.

Unidentified speaker (speaker_2) ·5:56

How to verify: Check market reports on Iron Ore Fines 58% Fe CIF China prices and compare with Arrow's stated cost base and royalty structures. For recent events, verify 2026-08-23 through 2026-11-23. Use another period only when the speaker explicitly names it.

Primary source

Atlas Iron's original Padu Pardue resource was 7 million tons, whereas Pannawonica has 62.5 million tons.

Unidentified speaker (speaker_2) ·4:38

How to verify: Review historical ASX announcements from Atlas Iron (now part of Fortescue) regarding the Padu Pardue resource estimate. For recent events, verify 2026-08-23 through 2026-11-23. Use another period only when the speaker explicitly names it.

The Marty Port in the Pilbara is scheduled to be commissioned next year (2027).

Unidentified speaker (speaker_2) ·7:18

How to verify: Check Western Australian government infrastructure announcements or the Port Authority of Western Australia's schedule for the Marty Port. For recent events, verify 2026-08-23 through 2026-11-23. Use another period only when the speaker explicitly names it.

Simandou project in Guinea has a $22 billion capital cost, 650km railway haul, and barging system, making it more expensive than Pilbara projects.

Unidentified speaker (UNKNOWN) ·12:43

How to verify: Review financial reports from Rio Tinto and Chinese partners (Shahid Khan, etc.) regarding the Simandou Iron Ore Project's capital expenditure and logistics infrastructure. For recent events, verify 2026-08-23 through 2026-11-23. Use another period only when the speaker explicitly names it.

The government in Guinea has returned frozen tenements for the Niagara Bauxite Project to Arrow Minerals.

Unidentified speaker (speaker_2) ·14:24

How to verify: Check Arrow Minerals ASX announcements regarding the status of the Niagara Bauxite Project tenements and any government notifications. For recent events, verify 2026-08-23 through 2026-11-23. Use another period only when the speaker explicitly names it.

Do your own research

  • Verify the current status of the option agreement over the Pannawonica project in Arrow Minerals (ASX: AMD) announcements.
  • Check the latest JORC-compliant resource estimate for Pannawonica to confirm the 62.5Mt at 53.4% Fe figures.
  • Review Atlas Iron's historical financial reports and operational data to validate the 15Mtpa fleet and 200km haulage claims.
  • Analyze the latest iron ore price forecasts and CIF China pricing trends to assess the $85-$90 AUD/tonne target viability.
  • Investigate the current development status and capital expenditure updates for the Simandou project in Guinea.
  • Confirm the regulatory status and tenement returns for the Niagara Bauxite Project in Guinea.
  • Examine the exploration plans and historical data for the Yarraloola Copper Project to assess the gold and copper potential.
  • Review the details of the native title agreements for the BBQ Valley and Eastern Magnetic projects.
Full transcriptexpand

0:06Unidentified speaker (speaker_0): You're listening to the Whole Truth, a resources rising stars podcast.

0:12Unidentified speaker (UNKNOWN): Welcome

0:12Paul Armstrong: back to the Whole Truth Podcast. I'm Paul Armstrong. This episode of The Whole Truth barely needs any introduction. I'm having a chat with David Flanagan, well known to you all as the former managing director of Atlas Iron. He was in fact the founder of Atlas Iron. He took that company from a Penny Dreadful to an ASX50 company based on an iron ore strategy in WA's Pilbora region. It's a sense of uh history repeating here. David is now the managing director of Arrow Minerals and he's implementing the same strategy in the Pilbora. He's going to take us through why he likes this strategy, why he thinks that history can repeat, and he's just put his foot on a big project which he recognizes. reckons will form the cornerstone of Atlas Mark II. David, great to have you back. This is not the first time we've been in the studio, but uh special circumstances require special measures. You've just got your hands on a new project, and I can tell you've got that uh the look of hunger and stilly determination back in the eyes. Why are you so happy about this?

1:14Unidentified speaker (speaker_2): I'm relentless.

1:15Paul Armstrong: Relentless. Relentless about what is the question.

1:18Unidentified speaker (speaker_2): I I'm in pursuit of of building something super special. And uh without a doubt, no mistake, this is a company making acquisition.

1:28Paul Armstrong: Right. So let's go back a couple of steps here so people can understand why you're you're so enthused about this and what's what's just just

1:34Unidentified speaker (UNKNOWN): transparent.

1:35Paul Armstrong: Because what we've got here is being sold to the market as Atlas Mark II. Now, as I said in the introduction, Atlas was highly successful. You took it to an ASX fifty company uh on the basis of low cost iron ore production in the Pilbara that gave you fat margins, strong cash flow, and great returns for shareholders. You believe history's going to repeat with what you're doing with Arrow?

1:57Unidentified speaker (UNKNOWN): Aaron Powell

1:58Unidentified speaker (speaker_2): Well, I think it can be better this time, because we can take everything that we've learned before. all the mistakes that that we made, avoid the mistakes and just do more of the good stuff. And it starts with getting a project close to a port.

2:11Paul Armstrong: Right. Now so you've just acquired the Panama project or got an option over the Panamaca project.

2:15Unidentified speaker (UNKNOWN): Yeah, yeah.

2:18Paul Armstrong: So but y this is not the first iron ore deal Ordeal that Arrow's done. So this is this is the latest in a in a series of iron ore transactions that you've

2:26Unidentified speaker (UNKNOWN): put together.

2:27Paul Armstrong: in the Pilbora in recent months. You've now got a land holding of what sixteen hundred odd square kilometers?

2:32Unidentified speaker (UNKNOWN): Correct. Yep.

2:33Paul Armstrong: So you booked yourself a big position there. You're obviously going down the same track as as Atlas, uh, but you you needed a a cornerstone project, if you like, and that's what the Panacawanac project gives you.

2:44Unidentified speaker (UNKNOWN): The

2:44Unidentified speaker (speaker_2): P The Pannawanica Panawanica Project.

2:45Unidentified speaker (UNKNOWN): The

2:46Paul Armstrong: Panawanica Project.

2:47Unidentified speaker (speaker_2): That's what it is. So it no, it's exactly that.

2:50Unidentified speaker (UNKNOWN): So

2:50Unidentified speaker (speaker_2): there's a there's sixty-two million tons on granted mining licenses. There's a native title mining agreement. Um one of the deposits actually crosses a bitumen road with the capability of hauling or straight to the port and the port's a hundred Ks away. That to me,

3:06Unidentified speaker (UNKNOWN): from

3:06Unidentified speaker (speaker_2): what I've done before in the Pilbara, that should be a license to make money for shareholders.

3:12Unidentified speaker (UNKNOWN): So

3:12Paul Armstrong: how do you make money out of this? Take us through the process. You've got the option over the project.

3:16Unidentified speaker (UNKNOWN): You

3:16Paul Armstrong: said you're going to exercise it.

3:18Unidentified speaker (speaker_2): Yep.

3:18Paul Armstrong: What happens from here?

3:20Unidentified speaker (speaker_2): So at the moment, the first thing that we do is we pull apart all of the data, we go and speak to contractors, we go and speak to the port providers, road haulage people, the government, the EPA, and we figure out the scope of that project, which is going to provide the optimum return for shareholders and the optimum time to make. market.

3:39Unidentified speaker (UNKNOWN): And

3:40Unidentified speaker (speaker_2): then we press the button, we submit the documents and we go.

3:43Paul Armstrong: So take us through the model, if you like, the cash flow model. What are your costs? What sort of margins do you envisage here?

3:50Unidentified speaker (speaker_2): So I I can sort of speak to the CID deposits that we've mined before. So so so this is not

3:57Unidentified speaker (UNKNOWN): a good thing. So C CID ID

3:58Paul Armstrong: deposits being a a style of mineralization.

4:01Unidentified speaker (UNKNOWN): It essentially

4:01Unidentified speaker (speaker_2): looks like an elongated hamburger sitting on the surface. So and that has the benefit of there not being a lot of waste.

4:09Unidentified speaker (UNKNOWN): And

4:09Unidentified speaker (speaker_2): it that the drilling that you need to do is really shallow. And um you you're basically straight into ore without any pre-strip.

4:17Unidentified speaker (UNKNOWN): And

4:17Unidentified speaker (speaker_2): it the ore is relatively soft.

4:19Paul Armstrong: And they were the style of deposits that made Atlas so successful.

4:23Unidentified speaker (speaker_2): Yeah, so so for example, the very first ton that we put on a ship at Atlas was going about fifty-three percent FE, and it was one of these CID things, and we made money selling it when the price was fifty-six dollars a ton. So today it's $90 a ton. We're about roughly the same distance from the port. Um we've got sixty sixty-two two million tons of the stuff. At Atlas, we only had a total resource at Padua pardue was seven million tons.

4:52Paul Armstrong: Right. So so again, let's get back to the cost base. Oh,

4:55Unidentified speaker (speaker_2): yeah,

4:55Unidentified speaker (UNKNOWN): I think it's a good thing. Don't

4:57Paul Armstrong: don't avoid my questions, Funno. I I've been doing this a long

5:00Unidentified speaker (UNKNOWN): time.

5:00Paul Armstrong: No,

5:00Unidentified speaker (UNKNOWN): no, I just get carried away.

5:02Paul Armstrong: What what is the cost base here? And and what's sort of uh based on your on your uh your experience here, you've got grounds for for opinion. You don't

5:12Unidentified speaker (UNKNOWN): have so your haul

5:13Unidentified speaker (speaker_2): your haulage cost should be should be under ten cents a ton per kilometer. Okay, your your your mining cost should be between four dollars fifty and six dollars. And your your processing cost, which is just turning some of the big rocks into smaller rocks, um that should be round about five, five dollars fifty. So the the net roundup of that is you get your ore to the shiploader for twenty bucks.

5:39Paul Armstrong: Aussie.

5:39Unidentified speaker (speaker_2): Aussie.

5:40Paul Armstrong: Right.

5:41Unidentified speaker (speaker_2): So so if you're if you're selling at CIF China, so we've we sort of understand this spec and we've sort of spoken to some people in the market and said, look, if we were producing a ore had roughly this spec, which is not too different to the the FMG Fortune finds at fifty four.

5:55Unidentified speaker (UNKNOWN): So

5:56Unidentified speaker (speaker_2): selling a fifty four percent product, no beneficiation, delivered China would be between sort of eighty eighty-five five to ninety Aussie per ton.

6:05Paul Armstrong: Giving you a margin of?

6:07Unidentified speaker (speaker_2): Um by the time you back out freight and shiploading costs and royalties, um that the target would be something like twenty bucks a ton Aussie.

6:17Paul Armstrong: Right. And that's a good margin?

6:19Unidentified speaker (speaker_2): Well, it's an extending margin. Because if you do it three or four million times a year, you're making eighty million dollars a year. So if your company's got a valuation of thirty million bucks and it's only cost you thirty or forty million dollars to build the project, that's a good investment.

6:37Paul Armstrong: And

6:38Unidentified speaker (UNKNOWN): at

6:38Paul Armstrong: thirty-six million dollar market cap today, obviously that's a that's a great that's that's great cash flow, it's a great multiple. But the idea, I assume, would be to try to bolt on other projects. or or exports around the outside, just like you did at Atlas.

6:54Unidentified speaker (speaker_2): And and that's and that's that's

6:55Paul Armstrong: the bigger

6:56Unidentified speaker (UNKNOWN): game there isn't

6:57Unidentified speaker (speaker_2): fundamentally the prop the the opportunity in the Pilbara right now is that there there really because there was this consolidation strategy which we played a role in, we sort of there were these companies that were kind of gobbled up and then we were gobbled up. Atlas was gobbled up, right? Um There's been a scarcity of companies like Arrow in the Pilbara providing people an opportunity to convert tenements into equity and to sort of come for the ride. There's been an absence of infrastructure in the West Pilbara, so the delivery of the Marty port, which is going to be commissioned next year, um hasn't been around. So theoretically anything within three or four hundred kilometers kilometres of that port should be viable. So right now there's that opportunity. And the iron ore price is still high.

7:45Paul Armstrong: And what about transport to the port?

7:48Unidentified speaker (UNKNOWN): So

7:48Unidentified speaker (speaker_2): we'll use trucks. So um when Atlas first got up and running, um we we played a, I would say, a leadership role in developing trucking technologies in the Pilbara. So they told us in the beginning it couldn't be done. And to date, I think no one's

8:02Unidentified speaker (UNKNOWN): not a good idea.

8:03Unidentified speaker (speaker_2): ever, you know, put together a bigger trucking fleet than we had running back then. So we were doing fifteen million tons per annum on on the roads. Um and that was the average haulage distance was two hundred kilometers. And our break even was about forty five USD on the sixty two price.

8:19Paul Armstrong: So take us through the other projects that you before you got Panawanica you had bought some other ground and projects nearby.

8:28Unidentified speaker (speaker_2): Yep.

8:28Paul Armstrong: So obviously Panaquonica Panawanica can we change the name of this project?

8:33Unidentified speaker (UNKNOWN): That's

8:33Unidentified speaker (speaker_2): a great

8:33Unidentified speaker (UNKNOWN): name.

8:34Paul Armstrong: Obviously Panawanica comes in over the top in in in terms of the the pecking order here. But do you have to do uh a lot of exploration on the other projects before you can say, Hey, these are coming into the pipeline of production?

8:45Unidentified speaker (speaker_2): Yeah, we'll we're gonna going to do everything. Okay. So Barbecue Valley is only about forty 40 Ks from the port. What In fact, we're doing a heritage survey and we've signed a native title agreement with that group as well. So that will happen. Then there's the Eastern Magnetic target that's that's on the adjoining tenement there as well. So there's two iron ore targets there within 50 Ks of the port. In fact, the next tenement over, joining that tenement, is owned by the port. That's how close it

9:10Unidentified speaker (UNKNOWN): is.

9:11Unidentified speaker (speaker_2): Um And then we've we've gone and done a um a a bunch of other acquisitions in the Pilbara and pegged ground. Because the the next phase, so it's almost like the horizon one, is to just get up and running as fast as we can

9:26Unidentified speaker (UNKNOWN): and

9:26Unidentified speaker (speaker_2): then and then bolster that with some other projects in and around we call it the West Pilbora. And then once you develop that we'll then step out. And there'll be there's other like say Utah, okay um was as a port built in Port Headland for juniors, and Atlas was the biggest benefactor. Also, we were the biggest funder, and we took over ownership and project management of that port in its late stages and delivered

9:53Unidentified speaker (UNKNOWN): it.

9:54Unidentified speaker (speaker_2): And um there's there's not a lot of juniors using that port. So we sort of will look at other opportunities to ship through other ports, we'll look at other ways to partner with the majors. and we'll look at other innovative ways of getting ore to customers.

10:07Paul Armstrong: Now this does have a big ring of deja vu. We keep coming back to Batlas, but that's exactly what you did then, didn't you? You bolted on projects and

10:13Unidentified speaker (UNKNOWN): port

10:13Paul Armstrong: capacity as you went. So clearly at Arrow it's the same approach. You're trying to build a pipeline of projects here, Panawanica Wanaker being at the start of the queue, working your way back through them uh at uh to various levels of advanced. advancement currently uh to grow ultimately grow the inventory and the uh export.

10:32Unidentified speaker (UNKNOWN): Yeah, well if it is.

10:33Unidentified speaker (speaker_2): Well we you know, look at it like this. If we can demonstrate we've got our projects that viable, that's viable, and we kick it off and we start making money, and then we point to a growth pipeline where we double and then we double and then we double again. Um and we've you know, the same team, we've done deals with BHP. and a joint venture around accessing the Goldsworthy Railway line before. We've put ore through the FMG port before. We've had lots of engagement with Hancock before. And and I would expect that there's all sorts of innovative opportunities still present with those companies and Utah and the West Pilbara. So all of that should de-risk subsequent stages of growth. and add a lot of value for shareholders and cre and there really is space for a mid-cap, multi-billion dollar junior iron ore exporter.

11:25Unidentified speaker (UNKNOWN): You

11:25Unidentified speaker (speaker_2): know, the world's not meant to be dominated by one species of mining company, Paul.

11:29Paul Armstrong: Now people listening to this would say, well, that's great, but what about the iron ore price? Now, it there's has been no shortage of bearish forecasts forecast for I don't know, three, four years about the iron ore price. But as interestingly, it seems to s be sitting tight at ninety dollars. And amid all the carnage and the gold price and the copper price in recent weeks, the one the one constant in this commodity world at the moment seems to be iron ore.

11:51Unidentified speaker (speaker_2): Yes, I look I first been I first started looking at iron ore when I was with Jin Dalby with George Jones and David McSweeney. And the iron ore price has been in backwardation every single time I've looked at a forward. curve. Okay, so everyone always thinks that in the future demand is going to fall off. Supply is going to blow everyone's heads apart and the price will come off. But I'll tell you what, the iron ore price now is looking really good. People think, oh, Sim and Doo is going to come online and flood the market. If the If the operating cost for Simandu Sim and Doo is higher

12:25Unidentified speaker (UNKNOWN): than the

12:26Unidentified speaker (speaker_2): pill. Pilbora, how can it displace Pilbara tons?

12:31Unidentified speaker (UNKNOWN): Is it high?

12:32Unidentified speaker (speaker_2): It is. So they for a start, the the freight differential is double from Guinea to China.

12:38Unidentified speaker (UNKNOWN): You've

12:38Unidentified speaker (speaker_2): got to haul 650 Ks on a railway line and put it through a barging system.

12:43Unidentified speaker (UNKNOWN): Okay?

12:44Unidentified speaker (speaker_2): So they they they don't have a deep water port, so they pay a cost for that. They pay a penalty for the haulage. They and there's a capital charge. It was a twenty-two billion dollar project. You have to have to recover twenty-two billion dollars a bit against every ton. So um

12:59Unidentified speaker (UNKNOWN): the

13:00Unidentified speaker (speaker_2): Pilbara is safe, for sure. So um I actually see Simmadu causing a flaw under the iron ore price. And I and I can't really say

13:09Unidentified speaker (UNKNOWN): But So

13:09Paul Armstrong: by virtue of its cost base.

13:11Unidentified speaker (speaker_2): Yeah, yeah, yeah, yeah, yeah. So um there that will be some marginal producers that sit between seventy five and ninety dollars, which will be squeezed from time to time. Um but if you design your balance sheet

13:23Unidentified speaker (UNKNOWN): to

13:23Unidentified speaker (speaker_2): deal with that and your operations to deal with that and your scheduling to deal with that, you'll be okay.

13:28Paul Armstrong: Right. Now you mentioned Simon Doo. So let's let's throw the spotlight here, because obviously in Guinea that's where the Rio and its Chinese partners have developed this that m iron ore mine you're referring to. But most importantly for Arrow, they've built a whopping state of the art railway line

13:45Unidentified speaker (UNKNOWN): uh

13:45Paul Armstrong: to port. Now Arrow, before you went on this iron ore acquisition spree in the Pilbara, Arrow was building an asset base in Guinea, wasn't it?

13:54Unidentified speaker (speaker_2): Yep.

13:55Paul Armstrong: And out of one of those assets was the uh the the Niagara, if you pronounce it like that, it's a bit like Panawanica. Why

14:01Unidentified speaker (UNKNOWN): do you

14:01Paul Armstrong: all these projects with difficult names, I don't know?

14:02Unidentified speaker (speaker_2): It's

14:03Unidentified speaker (UNKNOWN): just you,

14:03Unidentified speaker (speaker_2): Paul. It's just you.

14:04Paul Armstrong: So so the Niagara Bauxite project in Guinea was your flagship project until you decided to go back to your old stomping ground in the Pilbara. Now, Niagara has been uh had its ups and downs with you. The obviously history shows that the government took the tenements off you for temporarily or froze them, whichever phrase you attempt

14:23Unidentified speaker (UNKNOWN): to use.

14:24Unidentified speaker (speaker_2): I like the phrasing

14:26Unidentified speaker (UNKNOWN): froze them. But

14:27Paul Armstrong: it it it has since given them back and said get on with your business. Uh please do.

14:34Unidentified speaker (UNKNOWN): So things

14:34Unidentified speaker (speaker_2): are starting to

14:35Unidentified speaker (UNKNOWN): loosen up. So all

14:36Paul Armstrong: the wheels are turning again. Yep. So tell us why you want to persist with this project. What was where's the upside here?

14:43Unidentified speaker (UNKNOWN): So

14:43Unidentified speaker (speaker_2): with with Niagara. Well actually, for a for a start, the reason we went to Guinea was infrastructure. So that port is being built, and I think it's got about four hundred and fifty million tons of capacity, and the majors are only going to use about 160 million tons. Okay, so so there's no constraint on that railway line that would prevent us shipping out some bauxite or some iron ore.

15:08Paul Armstrong: Because Nigara is located close to the

15:10Unidentified speaker (UNKNOWN): hundred day railway. So it's the

15:11Unidentified speaker (speaker_2): it's like the Atlas model. It's basically what's the distance. to the point of delivery? Can you economically get it there? Can you pay back your investment really quickly? Do you have a long enough life project to attract investment partnership? Tick, tick, tick. And even more so now in the port the government have announced they're going to build a deep water port specifically with capacity set aside for third parties. It's a cracking announcement. It's It was all out last week. So it it fits neatly with all the

15:38Unidentified speaker (UNKNOWN): people.

15:39Unidentified speaker (speaker_2): of that. Now our job, kind of a little bit like Josh Pitt, like if the guys at Red Hill is is to get those projects to a point and then to find a partner. Now for Josh and the guys at Red Hill, we're their partner for the West Pilbora and and we will find a partner for the for the projects in Guinea. Absolutely.

15:57Paul Armstrong: Right. So let's let's get into Niagara though, because the numbers are huge. Now bauxite is obviously in in big demand, you know, there's no secret about that. Al al aluminium is, you know, one of the um you know the products of the future. Uh and so many of the deposits around the world have been mined out. We've seen it in Western Australia. I mean, Alcoa's having an increasingly difficult time trying to get licenses and permits and and the like. So there's no question about the outlook for bauxite and aluminium. Um why do you think Nigara Niagara's got such cash flow potential? Because that's ultimately what we're talking about here, isn't it?

16:35Unidentified speaker (speaker_2): If you plug the long term freight price into that, um it it makes makes a reasonable margin for sure. And um and we'll we'll continue to tap that along, get it through the exploitation license process, bring in a partner as part of the finance financing strategy, and off that'll

16:52Unidentified speaker (UNKNOWN): go.

16:53Unidentified speaker (speaker_2): But the stuff here in the Pilbara, we can actually get in and develop that 100%. The capital cost to invest there, like our first mine at Padu cost us $13 million to build, all up. $13 million.

17:10Unidentified speaker (UNKNOWN): Right.

17:10Unidentified speaker (speaker_2): A second mine cost us about $15 fifteen or $20 twenty million. dollars. By

17:14Unidentified speaker (UNKNOWN): the

17:14Unidentified speaker (speaker_2): time we built our third mine, we were making twenty million dollars free cash each month.

17:20Unidentified speaker (UNKNOWN): But

17:20Paul Armstrong: but at Niagara the idea would be you bring a big partner in

17:22Unidentified speaker (UNKNOWN): the same way.

17:23Unidentified speaker (speaker_2): So there's a

17:24Paul Armstrong: you turn the model around.

17:26Unidentified speaker (speaker_2): So we'll we'll basically get it through the exploitation license permit process. The the scoping study work that's been done will largely feed into the

17:35Unidentified speaker (UNKNOWN): You're

17:35Paul Armstrong: essentially going to incubate

17:36Unidentified speaker (UNKNOWN): it?

17:37Unidentified speaker (speaker_2): No, no, no. We'll advance it. Um but it'll be the stuff in the Pilbara where we pin our ears back.

17:44Paul Armstrong: Right. And then with a view to to unlocking the value of Noagara by bringing the partner in the

17:50Unidentified speaker (UNKNOWN): case.

17:50Unidentified speaker (speaker_2): Yeah, yeah. So we we'll we'll during the course of the next three to six months we'll have more to talk about on that.

17:56Paul Armstrong: Now one other quick question, let's return to the Pilbara. Because last time we spoke you were talking about a copper project in the Pilbara.

18:03Unidentified speaker (UNKNOWN): Yep.

18:03Paul Armstrong: Yarrula, if I remember correctly. There you go. Another name.

18:07Unidentified speaker (UNKNOWN): Well

18:07Unidentified speaker (speaker_2): it's kind of funny how these things like Atlas was Atlas Gold when we listed, Paul.

18:12Paul Armstrong: Yeah. I I

18:13Unidentified speaker (UNKNOWN): and

18:13Unidentified speaker (speaker_2): we went looking at this timber. I thought, this smells a bit like iron ore. Let's bang some holes into it. Well, Yarrallula, we went to the Pilbora for a copper gold project that Western mining drilled out, but they never assayed it for gold. But there was gold on the surface going a gram. And if that continues at depth, it's something special. I then pick up the phone and start calling people on the adjoining tenements and and Chris Piggott said, Yeah, I've got an iron ore project. Um it's right next door to you. Do you want to do a deal? I think it might fit what you can do up there. Um and that was off we went.

18:43Unidentified speaker (UNKNOWN): So

18:43Paul Armstrong: what about the copper project?

18:45Unidentified speaker (speaker_2): So we're we're actually doing a heritage survey there today. So um whenever this goes live. so the survey's happening on the Friday. Um and we have a POW in place to drill, so we'll be in there drilling quickly.

18:59Paul Armstrong: Right. And

19:00Unidentified speaker (speaker_2): we'll assay for gold. Now

19:01Paul Armstrong: it's got quite a bit of history this year, a little copper project, hasn't it? I mean

19:05Unidentified speaker (UNKNOWN): the geo

19:05Paul Armstrong: the geophysics is uh are very promising.

19:08Unidentified speaker (speaker_2): Yeah, but it's actually even better story than that. So there's a rooshooter who goes out shooting in the eighteen hundreds and finds a bunch of green rocks sticking out of the ground.

19:17Unidentified speaker (UNKNOWN): And

19:17Unidentified speaker (speaker_2): they just look that's and that that became that became some guy, Thomas, that became a mine. But then yes, West Western Mining and others came in and drilled

19:27Unidentified speaker (UNKNOWN): it.

19:27Unidentified speaker (speaker_2): And they had a habit back then of really being selective in their assaying. And this is this played true right up in Cambalda, right up until the nineteen 1990s, nineties,

19:37Unidentified speaker (UNKNOWN): where

19:37Unidentified speaker (speaker_2): they were looking for nickel, knew that there was gold nearby, but they were still only assaying for nickel. So we'll go in there, drill, and we'll assay for gold and copper, and we'll apply a similar strategy to that as we do to the iron ore. And you might say, what the hell does that mean? Well, we don't I don't intend on building a copper processing facility, but if there's an opportunity to have a DSO product and just ship it to a customer, there's a number of nearby plants who have already expressed an interest in taking the dirt off our hands. Trevor

20:08Unidentified speaker (UNKNOWN): Burrus, So

20:08Paul Armstrong: the upshot of this is you've got three projects here, in essence, between your Pilbora iron ore, your Pilboro Copper Exploration Project, and Niagara Balkside in Guinea. So you've got three tickets in this lottery that all stand to make substantial value for shareholders.

20:26Unidentified speaker (speaker_2): Yeah, and there's the the the low-cost systems lotto ticket as well. So we've got these subsequent projects that sit behind. And what happens is when you're a company and you own one project that you execute on, the market then realizes, okay, these guys have done that one. Actually they're probably going to do something with these other ones as well. So you s you get re re-rated rated on the on the basis you have a business plan to expand. You've got the credibility and capability

20:52Unidentified speaker (UNKNOWN): to expand.

20:53Unidentified speaker (speaker_2): Exactly. And um, we're well aware of that and and and fully having a crack.

21:00Unidentified speaker (UNKNOWN): It's

21:00Paul Armstrong: great to have you back. Your energy, your enthusiasm's invaluable, but I think obviously so is your experience and track record, as you said at the outset, is there's nothing like having been there and done it before. Uh and the Pilbury is your backyard. So uh this this uh Panamanica. project has obviously really got you fired up.

21:17Unidentified speaker (speaker_2): It's it is a company making transaction, right? Like, and I just can't wait to get into it.

21:23Paul Armstrong: Great. Thanks very much for coming in.

21:25Unidentified speaker (speaker_2): Cheers,

21:26Unidentified speaker (UNKNOWN): Paul.

21:30Unidentified speaker (speaker_0): You've been listening to the whole truth, a resources rising stars podcast, produced by Resource Media, hosted by Paul Armstrong. for Reed Corporate. Please note that Reed Corporate does not provide investment advice, and investors should seek personalised advice before making any investment decisions.

This page was produced automatically: the audio was transcribed with nvidia/parakeet-tdt-0.6b-v3+sortformer-v2.1 and interpreted by Qwen3.6-35B-A3B-UD-IQ3_S.gguf. Transcription and interpretation can contain errors; always confirm against the original episode. Nothing here is investment advice.