Lion One Metals outlines Tuvatu gold production expansion, mill upgrades, and resumed regional exploration in Fiji
Summary
Ian Berzins, CEO, and Ronan Geoghegan, VP of Corporate Development of Lion One Metals, discuss the company's operations at the Tuvatu gold project in Fiji. Geoghegan details plans to expand mill capacity from 350 to 700 tonnes per day by 2028, targeting production growth from ~15,000 to 30,000+ ounces annually. The company is resuming regional exploration within its caldera after pausing for construction, using Tuvatu's cash flow to fund new targets like Kingston and Lumuni. Berzins addresses the company's valuation, citing a $31.8M debt facility as a suppressant on share price, and highlights the strategic shift back to exploration now that the mine is producing.
Key takeaways
- 1 it's a ISO certified s uh lab, so we can actually t take samples from other other companies and and process them. And for us, if we want to put a rush on a sample, we can get the results back within uh within a day or two. So it's it's quite a huge asset. Previously you'd have to send all the assays to it to Australia. And now we get the feedback very quickly.
Unidentified speaker (speaker_3) · 5:58
Episode sections
- 0:03 – 1:53
Introduction and Company Overview
Dave Jackson introduces Ian Berzins, CEO of Lion One Metals, and Ronan Geoghegan, VP of Corporate Development. Geoghegan outlines the company's 20-year history in Fiji, its 136 sq km exploration package with 30 targets, and its current production status at the Tuvatu project.
- 1:53 – 3:13
Production Metrics and Expansion Plans
Geoghegan details current production at 350 tonnes per day (tpd) with plans to reach 400 tpd by Q1 2027 and 700 tpd by 2028. He cites a current run rate of ~15,000 ounces/year, targeting 30,000+ ounces by 2028, and notes $76.5M in revenue through June 2026.
- 3:13 – 4:58
Geological Context and Regional Analogs
Geoghegan compares Tuvatu to major alkaline gold deposits like Porgera, Lihir, Vatukaloko, and Cripple Creek, noting Tuvatu's location within a large caldera structure similar to these long-lived systems.
- 4:58 – 6:32
Infrastructure and Operational Advantages
The speaker highlights Fiji's mining infrastructure, including Nandi International Airport (45 mins away), the deepwater Port of Lautoka (1 hour away), and an on-site ISO-certified assay lab that provides rapid turnaround times.
- 6:32 – 11:38
Deposit Structure and Zone 500 Exploration
Geoghegan describes the Tuvatu deposit as steep and narrow, using a 'tree' analogy. He discusses Zone 500, a high-grade feeder zone, and the plan to use a new underground drill to intersect structures more efficiently than surface drilling.
- 11:38 – 14:09
Regional Exploration Targets
Geoghegan outlines regional exploration within the caldera, mentioning targets like Kingston (copper-gold), Lumuni (surface chip samples), and Yoloa (copper), noting that Tuvatu's cash flow is funding this exploration.
- 14:09 – 17:05
Processing Plant Upgrades
Geoghegan explains the addition of a flotation circuit in early 2026, which increased recovery to ~85%. He notes that filter press installation will allow an increase to 400 tpd by March/April 2027.
- 17:05 – 33:15
CEO Commentary on Valuation and Debt
Ian Berzins discusses the company's undervaluation relative to peers, the impact of a $31.8M debt facility on the share price, and the strategic shift back to regional exploration now that the mine is built and producing.
- 33:15 – 33:52
Production Strategy and Grade Reconciliation
The speaker states the company aims to reduce reliance on external capital by generating proceeds from mining operations. They describe the project as a
- 33:52 – 34:45
Exploration Status and Employer Status
The speaker notes that technical teams are still in early stages of understanding the ore body's genesis and drilling targets. He also highlights that the company is the largest Canadian employer in Fiji, a point emphasized during a visit with the Canadian consulate.
- 34:45 – 35:08
Closing Remarks
The interviewer thanks the CEO and wishes him luck with the project. The CEO expresses gratitude, and the interviewer signs off.
Assets discussed
| Asset | Kind | Stance | Context |
|---|---|---|---|
| Lion One Metals LimitedLIO | equity | neutral | He is the CEO of Lion One Metals Limited, a Canadian resource company focusing on advancing its 100% owned, high-grade, and fully permitted Tuvatu Alkaline Gold Project in Fiji. |
| Gold | commodity | neutral | I didn't know anything about gold mining in Fiji three years ago. |
“Stance” is how the speakers talked about the asset, not a recommendation.
Claims worth verifying
Lion One Metals is a Canadian resource company focusing on its 100% owned Tuvatu Alkaline Gold Project in Fiji.
Dave Jackson ·0:03
How to verify: Company website (liononemetals.com) and TSXV/OTCQX filings for corporate structure and asset ownership. For recent events, verify 2026-08-18 through 2026-11-18. Use another period only when the speaker explicitly names it.
Primary sourceThe company has been in Fiji for about 20 years and has brought the Tuvatu project from exploration into production.
Unidentified speaker (speaker_3) ·1:12
How to verify: Company historical timeline on investor relations page or annual reports. For recent events, verify 2026-08-18 through 2026-11-18. Use another period only when the speaker explicitly names it.
The company holds a 136 square kilometer exploration package with 30 high-potential gold and copper drill targets, most of which are undrilled.
Unidentified speaker (UNKNOWN) ·1:13
How to verify: Company exploration license maps and technical reports filed with securities regulators. For recent events, verify 2026-08-18 through 2026-11-18. Use another period only when the speaker explicitly names it.
A drill result of 4.2 meters at 715 grams per ton was released a few months ago from underground development, 50 meters from active workings.
Unidentified speaker (speaker_3) ·1:33
How to verify: Company press release announcing drill results, searchable via SEDAR+ or company newsroom. For recent events, verify 2026-08-18 through 2026-11-18. Use another period only when the speaker explicitly names it.
A drill intercept of 76 meters at 21 grams per ton was drilled a few years ago in the Zone 500 feeder zone.
Unidentified speaker (speaker_3) ·1:53
How to verify: Historic drill result press releases filed with securities regulators. For recent events, verify 2026-08-18 through 2026-11-18. Use another period only when the speaker explicitly names it.
Current production is 350 tonnes per day, with plans to reach 400 tpd by end of Q1 2027 and 700 tpd by 2028.
Unidentified speaker (speaker_3) ·2:13
How to verify: Company operational updates or quarterly production reports. For recent events, verify 2026-08-18 through 2026-11-18. Use another period only when the speaker explicitly names it.
Current production is approximately 15,000 ounces per year, targeting 30,000 ounces or more by 2028.
Unidentified speaker (speaker_3) ·2:13
How to verify: Company production guidance in annual reports or investor presentations. For recent events, verify 2026-08-18 through 2026-11-18. Use another period only when the speaker explicitly names it.
Ian Berzins joined the company in early 2025 and delivered record global production in the second half of 2025.
Unidentified speaker (speaker_3) ·2:33
How to verify: Company press releases regarding executive appointments and production statistics for H2 2026. For recent events, verify 2026-08-18 through 2026-11-18. Use another period only when the speaker explicitly names it.
Revenue was $76.5 million up to June 2026 (financial year end).
Unidentified speaker (speaker_3) ·2:53
How to verify: Audited financial statements for the fiscal year ending June 2026. For recent events, verify 2026-08-18 through 2026-11-18. Use another period only when the speaker explicitly names it.
Market cap is approximately $60 million.
Unidentified speaker (speaker_3) ·3:13
How to verify: Stock market data for LIO.V or LOMLF at the time of the interview. For recent events, verify 2026-08-18 through 2026-11-18. Use another period only when the speaker explicitly names it.
The company aims to reduce reliance on the market for new capital by using proceeds from mining operations.
Unidentified speaker (speaker_1) ·33:15
How to verify: Review Lion One Metals' quarterly or annual reports for cash flow from operations versus financing activities during the verification period (2026-08-18 to 2026-11-18). For recent events, verify 2026-08-18 through 2026-11-18. Use another period only when the speaker explicitly names it.
The company is targeting a production grade of five grams of gold per tonne.
Unidentified speaker (speaker_1) ·33:33
How to verify: Check Lion One Metals' technical reports, press releases, or NI 43-101 filings for production guidance or grade assumptions for the Tuvatu project. For recent events, verify 2026-08-18 through 2026-11-18. Use another period only when the speaker explicitly names it.
Primary sourceThe company could achieve grades of six or eight grams if lower dilution is maintained.
Unidentified speaker (speaker_1) ·33:33
How to verify: Review internal technical presentations or mining plans for dilution control strategies and grade reconciliation data. For recent events, verify 2026-08-18 through 2026-11-18. Use another period only when the speaker explicitly names it.
The company has some of the best grades in the world.
Unidentified speaker (speaker_1) ·33:15
How to verify: Compare Lion One Metals' reported grades against industry averages from sources like the World Gold Council or competitor technical reports. For recent events, verify 2026-08-18 through 2026-11-18. Use another period only when the speaker explicitly names it.
The company is the largest Canadian employer in Fiji.
Unidentified speaker (speaker_1) ·34:32
How to verify: Verify via Lion One Metals' corporate website, investor presentations, or statements from the Canadian Consulate in Fiji. For recent events, verify 2026-08-18 through 2026-11-18. Use another period only when the speaker explicitly names it.
The company took on debt to build the Tuvatu project.
Unidentified speaker (speaker_1) ·34:12
How to verify: Review Lion One Metals' balance sheet and debt disclosures in their financial statements for the verification period. For recent events, verify 2026-08-18 through 2026-11-18. Use another period only when the speaker explicitly names it.
Do your own research
- Verify the $31.8M USD debt facility terms, maturity, and covenants in Lion One Metals' latest MD&A or press releases.
- Check the Tuvatu project's NI 43-101 technical report for current resource estimates and mine plan assumptions.
- Review the timeline and status of the filter press installation and flotation circuit upgrades mentioned for early 2026.
- Compare Lion One Metals' valuation multiples (EV/EBITDA, P/NAV) against peers like Newmont, Barrick, or other Fijian/Australian gold producers.
- Assess the geological continuity of the Zone 500 intercept (4.2m @ 715 g/t) against historical drilling data and assay protocols.
- Investigate the operational status and production history of the Vatukaloko mine to validate the 'sister mine' analogy.
- Review the company's cash flow statements to confirm the ability to fund regional exploration without additional dilution.
- Check for any regulatory or political risks specific to mining operations in Fiji, including environmental permits and local community agreements.
Full transcriptexpand
- 0:03
- Dave Jackson: Hello everyone and welcome to Stocks to Watch. I'm Dave Jackson. Today we're glad to be joined by Ian Bearsens. He is the CEO of Lion One Metals Limited, a Canadian resource company focusing on advancing its 100% owned, high-grade, and fully permitted Tuvatu Alkaline Gold Project in Fiji.
- 0:23
- Dave Jackson: This interview is disseminated on behalf of Lion One Metals. Welcome to Stocks to Watch, Ian, and great to have you on the show.
- 0:31
- Unidentified speaker (UNKNOWN): Yeah,
- 0:31
- Unidentified speaker (speaker_1): good morning, Dave. Appreciate the opportunity to tell the story about Lion One and our Tobatu project.
- 0:37
- Unidentified speaker (speaker_2): Before we continue, be sure to subscribe to our channel and ring the bell to get notified about our latest videos.
- 0:45
- Dave Jackson: Sounds great. Ronan, would you be so kind as to demo your corporate deck and tell us a little bit? about yourself?
- 0:52
- Unidentified speaker (UNKNOWN): I'm
- 0:52
- Unidentified speaker (speaker_3): the VP of Corporate Development and Investor Relations here at line one. So I think if you can see my screen now. So line one, the first thing to know about us is that we're in Fiji and we're we're in production. Uh we've been in Fiji for uh about 20 years now, uh so a long history. And we've brought the project from exploration all the way through into uh into
- 1:12
- Unidentified speaker (speaker_3): production.
- 1:13
- Unidentified speaker (UNKNOWN): Um
- 1:13
- Unidentified speaker (speaker_3): forward-looking forward looking statements. So I'll start off with some some highlights. Um right off the bat, as I mentioned, for uh exploration at heart, we have a 136 square kilometer uh exploration package with a 30 high potential gold and copper uh drill targets. And most of those are are undrilled. Our main uh project, Tuvatu, is in
- 1:33
- Unidentified speaker (speaker_3): production and we spent the m mut past few years focused on on 2BAP2. Tuvatu. And that's this next point. high grade production. So one of the key aspects of the project is it's very high grade. So this result here, 4.2 meters at 715 grams per ton, was released a few months ago, and that's from underground jewelry. That's only 50 meters away
- 1:53
- Unidentified speaker (speaker_3): from uh from active underground development. The this next intercept, 76 meters of 21 grams per ton, is a little bit deeper in sort of the jewel drill box. of the company in the zone five hundred feeder zone. And so this was drilled a few years ago. Uh, and both these drill results would be top uh top drill results globally
- 2:13
- Unidentified speaker (speaker_3): for for the one that we've drilled. The next step is is the mine expansion. Right now we're running at three hundred and fifty tons per day. And in the coming months, by the end of Q one twenty twenty seven, we expect to go to four hundred tons per day or even a little bit more. And then in twenty twenty eight go up to seven hundred tons per day. So right now we're doing about fifteen thousand ounces per year. And so on a simple double,
- 2:33
- Unidentified speaker (speaker_3): they'll get us to thirty thousand ounces or or more, thirty thousand ounce run rate in twenty twenty eight. So Ian, who's the CEO, uh is an underground mine engineer and he's been uh with the company since early twenty twenty five and he has over forty years of experience. So when he he joined the company, we changed some of the mining methods and um and and the that that delivered record global production in the second
- 2:53
- Unidentified speaker (speaker_3): half of twenty twenty five. And he brought his team, so Eric Setcheld is the director of operations. He was instrumental in that uh transformation as well. And so as I mentioned, we're in production and up to June twenty twenty six, which is our financial year, uh we had seventy-six point five million dollars of revenue. Um so our market cap right now is about sixty million dollars of revenue. So you see
- 3:13
- Unidentified speaker (speaker_3): there's a there's a big disconnect against between the value of the company and and the current market cap. This is uh Tubatu, this is what this is where we are in Fiji. Uh and the the yellow uh line is the uh you know the ring of fire, the plate tectonic boundaries. And so that's where we see all these other major deposits. Uh Poragrelli here and Vaticula are
- 3:33
- Unidentified speaker (speaker_3): our analog deposits to Tubatu. So they're all major alkaline gold systems. And they tend to be these tend to be very large and long-lived mines. Obviously Por Gras 25 million ounces, Lahir, 40 million, Vetacula 11, and Cripple Creek in Colorado is the same type of type of deposit and is 20 million ounces. And so these
- 3:52
- Unidentified speaker (UNKNOWN): tend
- 3:52
- Unidentified speaker (speaker_3): to be quite large and they're the type of deposits that that uh the majors go after. So one thing to note here is that the white circle is the size of the caldera that we uh that Tuvachu is located in. So call Tuvachu is basically in the root of a volcano, and that white circle is is the size of volcano. So you can see
- 4:12
- Unidentified speaker (speaker_3): compared to these other major deposits, uh it has the geographic size um to contain a similar similar quantity of gold. So looking at at Fiji, the caldera outline, which you can see I'm outlining in red, is just here.
- 4:27
- Unidentified speaker (speaker_3): And Vaticula, our sister mine, is just the next caldera over. These calderas both lie on the same regional structure that that goes from Tubatu over to Vaticula and then off into the into the ocean. The difference is that Vaticula has been in production for for 90 years, whereas Wedus entered production uh in 2024, twenty twenty four, two
- 4:47
- Unidentified speaker (speaker_3): years ago. They have quite a bit of a head start. Uh But it's the same geology. the the same structure, the the same mineralization. So that's where we're headed. That's what that's where where we want to go.
- 4:58
- Unidentified speaker (speaker_3): Speaking about a little bit about infrastructure now, we actually benefit quite a bit from the history of of uh of Vaticula because a lot of our underground miners come from Vaticula. So there's a an inbuilt labor pool in Fiji. Um a lot of people wouldn't necessarily think of Fiji as a mining jurisdiction, but it has a long history of mining. So
- 5:18
- Unidentified speaker (speaker_3): all the infrastructure is in place. Here at the Nandi International Airport is a 45-minute drive from our project. So if you were to fly from anywhere around the Pacific, from Vancouver, LA, Singapore, Auckland, you get straight to Nandi and then 45 minutes to our project. The portal Latoka up at the top is a deepwater deep water port. So all of our
- 5:38
- Unidentified speaker (speaker_3): machines. machinery, our equipment comes in uh from there, and that's an hour l long drive to our project. And the other thing to note is is the uh the assay lab. Right. So our head office and assay lab are located close to the airport in Fiji. And the ASE lab in particular is a is a huge asset. Um
- 5:58
- Unidentified speaker (speaker_3): it's a ISO certified s uh lab, so we can actually t take samples from other other companies and and process them. And for us, if we want to put a rush on a sample, we can get the results back within uh within a day or two. So it's it's quite a huge asset. Previously you'd have to send all the assays to it to Australia. And now we get the feedback very quickly.
- 6:18
- Unidentified speaker (speaker_3): So looking at the uh the property now, in yellow is the uh the exploration uh license and then in red a thin the red line is uh is the caldera. So we'll go and have a look
- 6:31
- Unidentified speaker (UNKNOWN): at
- 6:31
- Unidentified speaker (speaker_3): the deposit.
- 6:32
- Unidentified speaker (UNKNOWN): So
- 6:33
- Unidentified speaker (speaker_3): this is looking down, it's plan view. Over here, this is the west zone, which is a near mine target. This is zone two, and this is zone five. So those are the two main areas of the mine.
- 6:44
- Unidentified speaker (speaker_3): The main uh the portal is here and ventilation is here,
- 6:49
- Unidentified speaker (UNKNOWN): and
- 6:49
- Unidentified speaker (speaker_3): so the red lines are the underground development and the uh the black is the the modeled structures.
- 6:55
- Unidentified speaker (UNKNOWN): And
- 6:55
- Unidentified speaker (speaker_3): so the way the way to think about these is kind of like a tree. Now if you switch to the profile view you can see it's very deep, very steep and very narrow. So you know some of our our shareholders investors would will have heard this analogy, but we use the at the top of the the deposit is kind of like the top little branches of at a tree. And then as they come together they get thicker.
- 7:15
- Unidentified speaker (speaker_3): You get uh you know bigger branches or wider mining widths and higher grades. And so down around here is what we call zone 500. And that's where we hit the 75 meters um 21 grams per ton. And so that's where we're working down to get down there. It's important to note also that these these structures are based purely on drilling. So
- 7:36
- Unidentified speaker (speaker_3): they don't uh stop here, for example. There's just no drilling down here, there's no drilling here, there's no drilling here. So so this is where we'd have um potential to increase the resource. And uh
- 7:49
- Unidentified speaker (UNKNOWN): yeah,
- 7:49
- Unidentified speaker (speaker_3): and there's a there's a lot left to drill even within within uh within the the property or within the dep the mine.
- 7:56
- Unidentified speaker (speaker_3): Looking at
- 7:59
- Unidentified speaker (speaker_3): this particular uh area in zone two, these two
- 8:03
- Unidentified speaker (speaker_3): uh lanes, they're modeled based on drilling from surface. And once you get underground, you really understand what's going on. Um so so then it becomes larger, you see there's more structures. So you have to get underground to drill this out. Here's the URL load. So in this view, this is the main entrance to the mine, the portal,
- 8:23
- Unidentified speaker (speaker_3): and we this was is a a blind blind discovery. discovery. The The URL Euroload was a blind was a blind discovery. discovery. Uh we basically hit it when we were building the main decline. And then so we put a drill here, start drilling it out in more detail, and then it
- 8:36
- Unidentified speaker (UNKNOWN): it
- 8:36
- Unidentified speaker (speaker_3): becomes quite a bit larger as you start to understand the system.
- 8:42
- Unidentified speaker (UNKNOWN): And
- 8:42
- Unidentified speaker (speaker_3): so this is the kind of the the challenge and the opportunity because the veins are so narrow and so steep and they and they they pinch and swell.
- 8:50
- Unidentified speaker (UNKNOWN): they're
- 8:50
- Unidentified speaker (speaker_3): easy to miss from surface drain, so you really have to get underground. And then once you do get underground, you can start to see the grades and you start to understand what's going
- 9:00
- Unidentified speaker (UNKNOWN): on. So
- 9:01
- Unidentified speaker (speaker_3): this is uh classic Tuvatu, extremely high grade and quite narrow, 0.3 meters, 190 grams per ton.
- 9:08
- Unidentified speaker (UNKNOWN): And
- 9:08
- Unidentified speaker (speaker_3): we see that all all across the mine. Um
- 9:11
- Unidentified speaker (UNKNOWN): this
- 9:11
- Unidentified speaker (speaker_3): is just zone two, but also zone five is the same. Uh and so what when Ian and his team joined, one of the things they changed was to introduce the shrinkage stope mining. And this was the first one,
- 9:23
- Unidentified speaker (UNKNOWN): first
- 9:23
- Unidentified speaker (speaker_3): shrinkage stope that was done. And we got 10.6 grams, 5,700 tons of 10.6 gram per ton material. So that is sort of proof of concept to use that uh that style of mining. The key, of course, is to keep it as narrow as possible. Uh underneath was a long hole strope and so long
- 9:43
- Unidentified speaker (speaker_3): hole will likely be the the bulk of the mining and wherever possible we'll do uh shrink slope. Again down here we have very little drilling and so these are some of the drill results that we saw in that area. And this seven hundred and seven 715 hundred and fifteen grams per ton over four 4.2 point two meters. It's just right here. So that's about
- 10:03
- Unidentified speaker (speaker_3): 50 meters away from active uh underground development. So that's the kind of drilling that you can expect as as we keep on going deeper down in the mine. And as we go quite a bit deeper, looking into the future, here we have that intercept in zone 500. And so this was drilled uh a few years ago, and we haven't drilled zone 500 in probably four
- 10:23
- Unidentified speaker (speaker_3): years. So one of the things we've done recently is we bought a new underground drill. We're gonna put it here
- 10:29
- Unidentified speaker (UNKNOWN): and
- 10:29
- Unidentified speaker (speaker_3): then start to drill this from underground. Uh and here we have like proper drill intersects. All the historic drilling
- 10:40
- Unidentified speaker (speaker_3): is from surface in this area. And so you can see these are these are very long, steep, and expensive drill holes. Still very good results.
- 10:52
- Unidentified speaker (speaker_3): But you're intersecting at kind of an acute angle. Whereas once we have the the new drill up and running, then we can intersect it across, basically drill across the structure and and have sh quicker, less expensive, and better drill intersects. And this is what we're looking at. So that this is the the first drill hole
- 11:12
- Unidentified speaker (speaker_3): into uh into zone 500 five hundred and for in and four in four years and so this is this is the first of eight drill holes um and you can see we're targeting three different areas
- 11:26
- Unidentified speaker (UNKNOWN): right
- 11:26
- Unidentified speaker (speaker_3): around where we hit the 75 meters of 20 grams and 20 meters of 26 grams so this is quite exciting the first time we're drilling join this area in in four years um and this is ongoing right now
- 11:38
- Unidentified speaker (UNKNOWN): so now
- 11:38
- Unidentified speaker (speaker_3): looking at the regional uh picture, Tuvatu is is here. And if we go back to the tree analogy,
- 11:47
- Unidentified speaker (UNKNOWN): uh
- 11:47
- Unidentified speaker (speaker_3): Tuvatu is this one tree in the forest of the caldera.
- 11:52
- Unidentified speaker (UNKNOWN): You
- 11:52
- Unidentified speaker (speaker_3): know, so we know these are all very steep structures, uh very narrow, and all of these results are from surface, surface sampling, uh chip sampling in situ of veins.
- 12:03
- Unidentified speaker (UNKNOWN): Uh
- 12:03
- Unidentified speaker (speaker_3): so they're not coming from Tubachu, they're not coming from anywhere else. These are these represent the deposits which are which are undrilled. And so that's the big upside. The whole point of putting Tubachu into production was effectively to use our own cash flow to explore the rest of the caldera. And so looking at the caldera It in 3D,
- 12:23
- Unidentified speaker (speaker_3): um
- 12:24
- Unidentified speaker (speaker_3): Banana Creek up at the top is is a top. uh target. And but King Kingston here is another top target, and we're drilling Kingston right now, and that's actually a copper and gold target. And this is the first drilling we've done in the caldera in three years. So as I mentioned earlier, a lot of the focus has been
- 12:43
- Unidentified speaker (speaker_3): on Tuvatu, which is right
- 12:47
- Unidentified speaker (speaker_3): here for the past couple years, but now we're getting back into exploration. within the mine at zone 500 and regionally. And so there's quite a few of these targets. One of my favorites is here Lumuni.
- 13:00
- Unidentified speaker (speaker_3): Just to give you an idea what these this looks like. So 67 grams per 10 over 0.7 meters, 48 grams over 0.7 meters. These are all chip samples at surface, um, 93 grams per ton. And so if these were drilled results, you'd be quite happy. They were underground. But this is right at surface. You can walk along the vein at surface for over
- 13:20
- Unidentified speaker (speaker_3): 150 meters. And that's one kilometer away from Tuvatu.
- 13:23
- Unidentified speaker (UNKNOWN): So
- 13:23
- Unidentified speaker (speaker_3): that's another prospect that's sort of begging to be uh be drilled out. And then that's how you'd you'd add quite a bit more to the to the prod property as well. Looking at Y Loa Loa, another target. This is a copper target. We drilled this hole 163 meters at 0.17%. point one seven percent copper,
- 13:39
- Unidentified speaker (UNKNOWN): then
- 13:40
- Unidentified speaker (speaker_3): drilled these two. Uh they had copper and gold as well, but not as much, so we turned the rig around and hit three more long intersects of low grade copper.
- 13:49
- Unidentified speaker (UNKNOWN): The
- 13:49
- Unidentified speaker (speaker_3): interesting thing here is that the alteration, minimization, veining it ended in minimization, all that increases with depth. So you potentially hit the the side or the top of a larger system. Um that also is one kilometer away from Tubatu. Tuvatu. So within the the caldera there's an enormous amount of uh of untested uh potential. Looking
- 14:09
- Unidentified speaker (speaker_3): at Tuvatu up here is the main portal and then so obviously the material comes out ROM pad and a crush screen and through the rest of the plant. Right now we're operating at 350 tons per day.
- 14:20
- Unidentified speaker (speaker_3): And this flotation circuit we added in at the start of 2026. twenty twenty-six. And so that has increased our recovery, you know, up say four percent so far to eight around eighty-five percent. Um and we're adding these two filter presses right now. Right. So once we had have those complete, and that'll be at
- 14:40
- Unidentified speaker (speaker_3): you know, the end of March or April of twenty twenty seven, that's when we go up to four hundred tons per day or or more. So looking at the production over the past uh since the beginning of 2025, uh Ian and Eric joined the team here.
- 14:55
- Unidentified speaker (UNKNOWN): And
- 14:55
- Unidentified speaker (speaker_3): throughout 2025, everything was improving sort of by every metric. Grade grade was going up capital development and production. Uh Q1 20, Q4, 2025 was the best uh quarter we we've had of 4,400 ounces. And then at that point, then the mine was operation was taken over by private a equity. company,
- 15:15
- Unidentified speaker (speaker_3): the production dropped. And so this quarter here was was one of the lowest quarters we've ever had. So Ian and his team came back here and now things are are are going back up once again. And so what one thing to note here is that the these two months total about eight and a half thousand uh ounces.
- 15:34
- Unidentified speaker (UNKNOWN): No,
- 15:35
- Unidentified speaker (speaker_3): so that's already at about a seventeen 17,000 thousand ounce run rate. So if we can go back up to that and then and then double production from there, then we
- 15:42
- Unidentified speaker (UNKNOWN): can
- 15:43
- Unidentified speaker (speaker_3): go above 30,000 ounces. Looking to the future, the flotation circuit was commissioned in uh the end of the first quarter. We started the filter press expansion to go up to 400 tons per day. And then the regional exploration started we got the underground drill and now we're drilling zone 500. five hundred. So we're progressing towards the future and there are some several
- 16:03
- Unidentified speaker (speaker_3): major uh potential catalysts coming up. Um the first would be the going from 300 tons, 350 tons per day to over 400 tons per day. The second potential catalyst would be uh the a major discovery, either regionally or at zone five hundred. And then the third thing would be would be the the debt. So Well the company has some debt, thirty-one thirty one point eight million
- 16:23
- Unidentified speaker (speaker_3): dollars US, and once we refinance that, you'd expect to another catalyst there.
- 16:28
- Unidentified speaker (UNKNOWN): Um
- 16:28
- Unidentified speaker (speaker_3): and so here to get to seven hundred tons per day, put these in in gray. These are uh approximate timelines, um, depending on when construction starts and when we start getting mine equipment upgrade. And then once we get to seven hundred tons per day, then it's a whole it's a whole different ballgame for the company. Uh I think I'll leave it there and pass back to you, Dave.
- 16:47
- Dave Jackson: Well, thanks for uh running through that presentation for us, Ronan. Very thorough job. Thank you again. Let's start with the big picture. For investors discovering line one for the first time. What makes Tubatu gold mine such a compelling asset? And what's the broader opportunity in Fiji?
- 17:05
- Unidentified speaker (speaker_1): Sure. Thanks, Dave. I mean, unfortunately, Ronan stole stole all my good stuff, but um it's it's it's an exciting project. Um I'll be honest, I didn't I didn't know anything about gold mining in Fiji three years ago. So it was an eye-opener for me. As Ronan alluded to, the project
- 17:25
- Unidentified speaker (speaker_1): itself is built. So there is a long history of gold mining in Fiji at Vadakula. It's one of the larger gold deposits in the world. And uh it's again what Ronan alluded to in alkaline. an alkaline gold system, which tend to be large, and they tend also to be owned by majors like Barrick and Newmont
- 17:45
- Unidentified speaker (speaker_1): and others. So we are in the ring of fire, and so there is a a lot of analogy. We we can you know postulate that there are certainly not just inferences but but connections between what's happening at in Vodacool Vadakul and ourselves. So again, to be forty. 40 kilometers away from a mine that's
- 18:04
- Unidentified speaker (speaker_1): done seven and a half to eight million ounces over 75 years, that's a long life asset. So that would be the big thing. I mean, from an investor's point of view, to me, it's the mine is built uh uh several years ago, three years ago, this this stock was trading at uh over $2 a
- 18:24
- Unidentified speaker (speaker_1): share based on an expiration. story. Then the company decided to build something, which they've done, and uh and now uh our share price has suffered. Uh the the and I'll get into it in a minute, but but really if one looks from an investor's perspective, just about every junior mining or micro mining
- 18:44
- Unidentified speaker (speaker_1): cap company in our space, they've enjoyed up to four-fold improvement in share price over. the last year and a bit. And we've dropped precipitously to by almost a third. So it's a very compelling reason that everybody likes to say they're undervalued, but clearly to me, when you look at the strength
- 19:04
- Unidentified speaker (speaker_1): of our assets, we we can make that case that that we are.
- 19:08
- Dave Jackson: Yeah, and line one has been advancing operations at Tuvatu while also delivering increasing. encouraging exploration results. How are these two areas of progress positioning the company for its next growth phase?
- 19:23
- Unidentified speaker (speaker_1): Exploration for us is really twofold. Most of our exploration in the last two years has been what would he call infill or grade control drilling to expand the resource and to allow us better understanding on how to to mine the actual deposit at Tuvatu. Tubatu. The the other half of the story is the
- 19:42
- Unidentified speaker (speaker_1): potential in the caldera, which Ronan alluded to. So we not only have uh gold outcrops um and porphyry copper, but it just just from an expiration point of view, that caldera is a very, very interesting story and it could translate into multiple mines going forward.
- 20:03
- Unidentified speaker (speaker_1): So Tavatu really uh has been the flagship. So it'll be a mine that will have certain um, it's still very shallow, less than 150 meters from surface. So we believe these could be deep structures. And some of the assays that Ronan talked about, uh 715
- 20:23
- Unidentified speaker (speaker_1): grams over 4.2 meters, you multiply those together, it's three. 3,000. That will be arguably, in my mind, one of the top three to five holes in the world this year. And prior to that, a couple years ago, the original Discovery hole at Tuvatu was 76
- 20:42
- Unidentified speaker (speaker_1): meters over 21 grams gold. So that in its time was also prolific. So right now, the the interesting thing. for us is that we've quietly put a new drill in surface on the in the surface drilling in the caldera. We're finishing two holes before the wet season kicks in. But this is a
- 21:02
- Unidentified speaker (speaker_1): porphyry copper target, which would be quite larger than what we're currently mining. But the other thing is we we were able to procure a new drill for the underground that is fit for purpose. So as Ronan alluded to, we now have our second hole going directly to the 500 zone. So that was
- 21:22
- Unidentified speaker (speaker_1): the high grade discovery. Now we're not necessarily going to see the same, but we are going to have more closer to what I call true width. So the drill can drill where we want it to do. It's not limited by uh by dip and and azimuth and things like that. But we're quite comfortable that we can now start talking about
- 21:42
- Unidentified speaker (speaker_1): the five hundred zone. And frankly, it's today only five percent of the current resource at at Tuvalu is included, i the five hundred zones included. So we're still probably maybe a hundred and seventy five meters above it. But that is really uh Ronan alluded to the trunk of the tree, if that an analogy
- 22:02
- Unidentified speaker (speaker_1): were. works. But we're very excited that we now are following up on no one intersects. And I think between now and the new year, uh we are gonna have some interesting news flow on that front.
- 22:13
- Dave Jackson: Sounds great, Ian. Now you've been focused on improving operational performance, including development underground Around and in optimizing the processing plant. What key milestones have been achieved and how are these improvements setting the stage for increased production?
- 22:30
- Unidentified speaker (speaker_1): Yeah, I mean, the mill is really in pretty good shape. It it's uh it was designed for about 300 tons a day. Uh, it reached commercial production last year. And so we we typically run it at about 350 tons a day. In the last 12 twelve months, we've added what we call a flotation circuit. Uh the notion of the
- 22:50
- Unidentified speaker (speaker_1): flotation. circuit is to improve recovery. So we've demonstrated since March when it was finally commissioned about four to six percent. So that's gold that would have been lost to tails before that. In parallel, we looked at the circuit and said, What is today? What do we think is the bottleneck? And we felt
- 23:10
- Unidentified speaker (speaker_1): it was the back end of what's called the filtration. So we don't have a conventional tailing structure. We have what's called a filter tails or dry stack. So we filter our tailings to about 18-20%, and then we truck it to an enclosed structure. As we expand from the 350 to 700 tons,
- 23:30
- Unidentified speaker (speaker_1): we knew that we're going to have to add filtration capacity. But we've actually made the decision to double the size of the filtration plant in. advance of that full completion. What that's going to mean is that filtration today is the bottleneck at 350, but we believe we can probably push the mill to 400,
- 23:50
- Unidentified speaker (speaker_1): 425 without even spending the full monies to get it up to 700. But in the pipeline, that project will be commissioned by about April of 27, and then that our plan.
- 24:03
- Unidentified speaker (speaker_1): to complete the full upgrade to 700 should be completed in 2028. And again, it's not, let's say, a limit to what this mine can do. The footprint's fairly concentrated. And so we'll have to look at what is the nominal run rate. So the mill is in very good shape. Our our challenge will really
- 24:23
- Unidentified speaker (speaker_1): be to create enough workplaces underground to feed that mill. And we use the term in Canada, call them stopes, and we call them that here in Fiji too. But workplaces are stops. The more workplaces we can have, the more flexibility we have in, let's say, blending or deciding what we're going to feed that
- 24:42
- Unidentified speaker (speaker_1): mill. The team here has accelerated the advance of what we call declines or underground ramps. So basically, as we drive this system deeper, uh we're trying to get to the top of the 500 zone, but at the same time, we're trying to add tons per vertical meter or ounces per
- 25:02
- Unidentified speaker (speaker_1): vertical meter, which means that the ramp doesn't have to go as quickly. The other thing Ronan alluded to is that the previous operators kind of they took more of a bulk mining approach. These drives structures are extremely narrow. They're l for the most part, they're they're less than a meter, and they can be into the centimeters. So
- 25:22
- Unidentified speaker (speaker_1): they're very narrow, but they're very high grade. So it makes sense to mine this as as narrow as you can. We have 550 uh national employees here. Our underground miners are very experienced, they're used to working in some pretty tough conditions, but we do a lot of hand mining with stopers and jack
- 25:42
- Unidentified speaker (speaker_1): legs, which they're very not afraid to use and can use them safely. So we're trying to look at what our people can do, what equipment makes sense. And when the mine was built, kind of through necessity, uh and it all most of the mobile underground equipment um will be probably older than
- 26:02
- Unidentified speaker (speaker_1): some of your viewers.
- 26:03
- Unidentified speaker (speaker_1): Um so you get to the point where it's very difficult on an island to get mechanical availability, parts, replacement, capital spares. So we've made a concerted effort to to gradually do a change out of the underground fleet, which will really go a long way to improve s improving the productivity
- 26:23
- Unidentified speaker (speaker_1): of the mine in terms of drilling, blasting, mucking and movement of materials. So today the constraint is really the mine.
- 26:34
- Dave Jackson: Okay, and so beyond the current mining operation, Line One has reported significant drill results across the Devadu project. What are these results revealing about the resource potential? And how could further exploration create a different? additional value for the company?
- 26:52
- Unidentified speaker (speaker_1): Yeah, so again, returning to the original, we're so we're going to be drilling in two different places. We're going to be drilling underground because we need to continue to expand the underground resource. And as Ronan alluded to, we've got big areas that don't show mineralization, but it's not because it's not there. We don't know, we don't know. And
- 27:12
- Unidentified speaker (speaker_1): so until we can drill these areas, we may find that actually we have more tons or ounces per vertical meter than we know today, but we're lacking drilling. So as we do more drilling from underground, I look forward to expanding the underground resource at Tuvatu, which adds to flexibility. But I think the
- 27:32
- Unidentified speaker (speaker_1): one that the market may not quite understand is we haven't drilled in the caldera, the main caldera for about three, four years. And it's not because we didn't like what we saw out there, but it was we made the decision to actually build a mine. But now we'll be returning to drilling uh and it'll be gold targets and it'll be porphyry copper
- 27:52
- Unidentified speaker (speaker_1): targets. And there could be multiple mines or or whether it be shafts or but they'll th there'll be multiple opportunities to expand in the caldera and at that point in time one would might have to look at something more of a regional mill where you would suppl truck and s and to a call it a hub and
- 28:12
- Unidentified speaker (speaker_1): spoke if you will but something where you have multiple uh uh opportunities to to to feed a central mill. So we're really early days. I mean we're two years into this our sister mine, which is not a stone throwaway, throwway, but it's close. has been there for seventy five years. So, you know, w we really think that
- 28:32
- Unidentified speaker (speaker_1): those opportunities are are are are certainly going to be uh available to us.
- 28:37
- Dave Jackson: Okay. And as line one looks ahead, what are the key priorities for expanding and optimizing DuVadu? And you know, what milestones milestone should investors be watching for over the coming quarters?
- 28:49
- Unidentified speaker (speaker_1): Well the the biggest thing is that what's hurt us or held us back is that in order to complete the construction of the project, we took on debt. And so we have a fairly large thirty one point eight million US facility that we currently are working with our lenders to either replace or
- 29:09
- Unidentified speaker (speaker_1): to extend or or or a variety thereof. That has been really the that's been really the elephant in the room for the company, but also for investors where people are saying, will they be able to repay the debt? Our view is that it's not just a speed bump. We're going to figure it out. We
- 29:29
- Unidentified speaker (speaker_1): have between now and Christmas or potentially longer, depending on the lender's position. Once that debt is removed,
- 29:37
- Unidentified speaker (speaker_1): it really changes the perspective
- 29:39
- Unidentified speaker (speaker_1): The debt is what's holding the share price down right now. So we're of the view that it's a lot of money, but when you look at how much has been invested here already, it's a bit of a drop in the bucket when you look at it in terms of big picture. So the loan replacement is important, but also getting up to
- 29:59
- Unidentified speaker (speaker_1): 700 ton because 700 ton, it's it starts to change the whole dynamic. You start to get the project up to 30 or 35,000 ounces, which again, generally speaking, is a small mine. But our advantage relative to North America is that we have an experienced workforce that
- 30:19
- Unidentified speaker (speaker_1): wants to be here. We pay competitive wages, but a lot of North American companies are struggling finding miners that. want to do this tough work. And uh so we have, I don't want to call it a captive audience, but we have a motivated group of people here that recognize the opportunity. So um I
- 30:39
- Unidentified speaker (speaker_1): I I think when I look at this um the project here at 4,000 ounces of gold, um it it uh the the margins are going to be pretty good. And then the the real thing is gonna be uh the caldera because uh again we haven't drilled it because we didn't have the funds to drill it. But anybody that ke
- 30:59
- Unidentified speaker (speaker_1): held that land position would be motivated to raise money and get the drill bit turning. And we're we're absolutely convinced that there's opportunity there. And as is Ronan used the term float, this is not rocks that that found their way from some. unknown source. This is these are rocks that are channel samples in the ground.
- 31:19
- Unidentified speaker (speaker_1): So the mineralization comes to surface. So that's a pretty good place to be if you're an expiration person. And then it's a matter of prioritizing which of the targets are best to go after. But in most cases, they're all within two kilometers of the existing infrastructure. So that in itself is extremely. unique.
- 31:40
- Dave Jackson: Well, Ian, to close, when you look at Lion Wen over, say the next 12 months, what are you most excited about? And what do you believe the market may be underestimating about the company's potential?
- 31:51
- Unidentified speaker (speaker_1): Yeah, I mean, I guess the big thing is the the notion of debt, is that once that's eliminated or reworked or whatever you want to call it, uh then the project has that chance. to really catch win at its sales. We are going to get to 700 tons, but we may do it in more of a phased approach. And I'm quite
- 32:11
- Unidentified speaker (speaker_1): convinced that although we may design it for 700, we'll probably run at a higher run rate. So the real issue is going to be getting the new underground equipment to The site. We have no challenges with people
- 32:25
- Unidentified speaker (speaker_1): attracting, retaining quality. qualified people here. So it's a matter that if we can upgrade the equipment that the men have to work with and then some and then look at ways and means to keep these structures narrow. Dilution is the name of the game. So if we can eliminate dilution where you're taking unnecessary waste
- 32:45
- Unidentified speaker (speaker_1): through your mill, it's a huge opportunity for us. So all those projects. most of the I I I'm remiss in not saying that the actual expansion of 700 tons is about 10 million US. So it's not a huge amount of money in the overall scope of things. And as I mentioned,
- 33:05
- Unidentified speaker (speaker_1): we'll be spending about 2 million Canadian of that between now and April to get that back into the mill started. So we think that we'll be able to fund most of our capital.
- 33:15
- Unidentified speaker (speaker_1): uh through uh through proceeds of mining. And um, you know, our hope would be to reduce having to go to the market for new monies. But um I think it's really a show me story. And the biggest thing is we've shown some, we've had some of the best grades in the world,
- 33:32
- Unidentified speaker (UNKNOWN): but
- 33:33
- Unidentified speaker (speaker_1): we're trying to run at five grams of gold. So people are saying, well, how do you reconcile that? So the way we reconcile it is we could be higher to six or eight grams if we can maintain lower dilution. But we are blessed with incredibly high grade, steep structures. But it's still
- 33:52
- Unidentified speaker (speaker_1): early days for our technical teams to really understand the genesis of the aura body, where to look, where to drill, those kind of things. But I think we're going to continue to have excellent drill results relative to our competitors. And um so, like I say, I think again it's a show me story. We've been hurt not so
- 34:12
- Unidentified speaker (speaker_1): much because of poor execution, but really um we had to take debt on to get this thing built. But now it is built. So now it it really comes the point where we can uh demonstrate that all the vision of what this could be is there. And I think that certainly uh just uh realizing how important
- 34:32
- Unidentified speaker (speaker_1): uh gold mining is to Fiji, I guess my final point, we meant we visited with the Canadian consulate here and reminded them that we are the largest Canadian employer in Fiji. I think that's kind of special.
- 34:45
- Dave Jackson: Well thanks again for joining us today on Stocks to Watch Ian, in and best of luck with the project moving forward.
- 34:52
- Unidentified speaker (speaker_1): Thanks again, Dave.
- 34:53
- Dave Jackson: Our pleasure. I'm Dave Jackson for Global One Media. Thanks for watching.
More from Stocks To Watch
Episode 900: Virtuix ($VTIX) Looks to Expand into Defense and AI Simulation with Proposed STS Acquisition
Episode discussion: Virtuix CEO Jan Goetgeluk discusses $12M STS acquisition to launch defense division and AI simulation growth
Speakers’ claims: Host introduces Virtuix's proposed $12 million acquisition of STS International to launch Virtuix Defense, focusing on military training and AI simulation. CEO Jan Goetgeluk describes the non-binding LOI as transformative, citing STS's $40M YTD revenue and government contract vehicles. He outlines five drivers to profitability, including scaling consumer sales with Meta and high-margin enterprise sales. Goetgeluk identifies the STS acquisition closure as the primary catalyst for investors, alongside continued Meta consumer growth and larger defense awards.
Episode 899: Tartisan Nickel ($TN | $TTSRF) CEO on Drill Plans for Kenbridge & Sill Lake
Episode discussion: Tartisan Nickel CEO outlines Phase 2 drilling at Kenbridge and Sill Lake silver project
Speakers’ claims: CEO Mark Appleby presents Tartisan Nickel's ($TN | $TTSRF) development plans for its Kenbridge nickel-copper deposit and Sill Lake silver project. He highlights a Preliminary Economic Assessment (PEA) indicating a low $150 million capital expenditure for a 10-year mine life at Kenbridge. The company plans a 5,000-meter Phase 2 drill program aimed at doubling the resource size to extend mine life beyond 15 years. Appleby also discusses the Sill Lake project, acquired when silver prices were low, which features a shallow vein system. He contrasts the company's $10-11 million market cap with the in-situ value of its assets, arguing for significant undervaluation.