Summary

CEO Greg Crowe and analyst Don Durrett discuss Silver One Resources' ($SVE) progress on the Candelaria Silver Mine in Nevada. Crowe highlights the 126 million silver-equivalent ounce resource, noting its high silver grade and brownfield permitting status which allows for faster development than greenfield projects. The company aims to complete a pre-feasibility study by late 2026 or early 2027, with construction starting in late 2028 and initial production from heap leach pads in H1 2029. Durrett argues the stock is undervalued, projecting significant free cash flow if silver prices remain between $100-$120. The discussion also covers the company's debt-free balance sheet, strong insider ownership including Eric Sprott, and past acquisition strategy.

Key takeaways

  1. 1
    The Candelaria resource is defined as 88% silver and 12% gold by silver-equivalent ounces, distinguishing it as a 'pure' silver play compared to polymetallic peers.

    Unidentified speaker (speaker_1) · 1:23

  2. 2
    A sensitivity analysis shows that increasing the silver price assumption from $27.50 to $60 per ounce increases the in-ground resource value significantly, jumping the measured and indicated ounces from 71 million to nearly 110 million silver-equivalent ounces.

    Unidentified speaker (speaker_1) · 5:14

  3. 3
    Eric Sprott holds 16% of the company and invested $10 million of the $32 million private placement, representing his fourth investment in the company.

    Unidentified speaker (speaker_1) · 10:09

Episode sections

  1. 0:08 – 1:04

    Introduction and Project Overview

    Host John Feneck introduces CEO Greg Crowe and analyst Don Durrett. Crowe presents the Candelaria Silver Mine in Nevada, highlighting its status as a past producer with two open pits and heap leach pads, and notes the 126 million silver-equivalent ounce resource at measured and indicated levels.

  2. 1:04 – 2:43

    Resource Details and Permitting Strategy

    Crowe details the resource composition (88% silver), the brownfield permitting status requiring only updates rather than new permits, and the goal to complete a pre-feasibility study by late 2026 or early 2027. He contrasts the rapid permitting timeline with typical greenfield projects.

  3. 2:43 – 4:16

    Infrastructure and Historical Context

    Crowe explains the mine's history under Kinross and acquisition from Silver Standard (now SSR Resources). He emphasizes Nevada's favorable mining jurisdiction, low tax rate, and existing infrastructure like power and water, which reduce capital expenditure requirements.

  4. 4:16 – 9:09

    Development Milestones and Future Drilling

    The speaker outlines recent achievements including redrilling leach pads, geotechnical evaluations for a 'super pit,' and a ZTEM survey identifying new targets. He confirms a 20-25,000 meter drill program is underway to expand resources and mentions the addition of two new drills.

  5. 9:09 – 12:47

    Share Structure and Insider Ownership

    Crowe describes the share structure, noting 350 million shares outstanding, no debt, and strong insider/strategic ownership including Eric Sprott (16%) and Jupiter (4%). He addresses investor concerns about lock-ups, expressing confidence that insiders will not sell at current undervalued prices.

  6. 12:47 – 14:25

    Production Timeline and Build Phases

    Durrett and Crowe discuss the production schedule, aiming for construction start in late 2028. Crowe explains the phased approach: starting with heap leach pads (6-9 month build) to generate cash flow while engineering continues for the open pit fresh mineralization, targeting production in H1 2029.

  7. 14:25 – 18:24

    Valuation and Free Cash Flow Analysis

    Durrett argues the company is extremely undervalued, citing an enterprise value per ounce metric. He projects that at $100-$120 silver, the company could generate significant free cash flow, potentially valuing the company at $2.5 billion if producing 5 million ounces annually.

  8. 18:24 – 22:02

    Acquisition Strategy and Past Deals

    Crowe states the company is open to acquiring advanced-stage assets but prefers to wait for a re-rating to avoid dilution. He details the low-cost acquisition of Candelaria from Silver Standard, which involved minimal cash and share payments plus a reclamation bond.

Assets discussed

AssetKindStanceContext
U.S. GOLD CORP.USAUequityneutralWe've got some people well known, Luke Norman, U.S. Gold Corp, Raul Diaz worked with Penioles
SilvercommodityneutralBut uh with increasing silver prices, I think you'll see us get

“Stance” is how the speakers talked about the asset, not a recommendation.

Claims worth verifying

The Candelaria project has approximately 126 million ounces of silver-equivalent ounces at the measured and indicated levels using NI 43-101 standards.

Unidentified speaker (speaker_1) ·1:04

How to verify: Check Silver One Resources' NI 43-101 technical report filed on SEDAR+ for the Candelaria project. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.

The resource composition is 88% silver and 12% gold by silver-equivalent ounces.

Unidentified speaker (speaker_1) ·1:23

How to verify: Review the metallurgical assumptions and metal price assumptions in the NI 43-101 technical report for Candelaria. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.

The mine was previously operated by Kinross, which shut it down between 1997 and 1999 because silver prices fell below $5 per ounce.

Unidentified speaker (speaker_1) ·2:43

How to verify: Search historical news archives or Kinross Gold Corporation annual reports for 2026-2026 regarding the Candelaria mine closure. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.

Silver One Resources acquired the project from Silver Standard (now SSR Mining) with no royalties back to SSR.

Unidentified speaker (speaker_1) ·2:56

How to verify: Review the definitive agreement or press release announcing the acquisition of Candelaria from Silver Standard. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.

Nevada has a 5% tax rate and power costs of nine cents per kilowatt-hour at the site.

Unidentified speaker (speaker_1) ·3:16

How to verify: Check Nevada state tax statutes for mining taxes and utility rate schedules for the specific location of the Candelaria mine. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.

The pre-feasibility study is targeted for completion by the end of 2026, potentially slipping to Q1 2027.

Unidentified speaker (speaker_1) ·1:23

How to verify: Monitor Silver One Resources' quarterly operational updates or press releases for PFS completion announcements. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.

Eric Sprott holds 16% of the company and invested $10 million of a $32 million private placement.

Unidentified speaker (speaker_1) ·9:48

How to verify: Check the company's Management Information Circular (MIC) or press release detailing the private placement and insider holdings. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.

The company has 350 million shares outstanding and no debt.

Unidentified speaker (speaker_1) ·9:09

How to verify: Check the company's most recent quarterly financial statements or balance sheet. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.

Production is targeted for the latter part of 2028, with construction starting in late 2028 and production in H1 2029.

Unidentified speaker (speaker_1) ·6:52

How to verify: Monitor the pre-feasibility study results and production decision announcements. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.

Do your own research

  • Verify the 126 million silver-equivalent ounce resource figure in Silver One Resources' latest NI 43-101 technical report or press release.
  • Check the current status of the Candelaria mine's permit updates with the Bureau of Land Management (BLM) and US Forest Service.
  • Review the company's latest 10-K or 10-Q filing for details on the $32 million private placement and insider ownership percentages.
  • Confirm the timeline for the pre-feasibility study completion against the company's stated goal of late 2026/early 2027.
  • Analyze the sensitivity analysis methodology used to jump measured and indicated ounces from 71 million to 110 million at higher silver prices.
  • Check for any recent insider trading activity or lock-up expiration dates for Eric Sprott and other major shareholders.
  • Review the historical production data from Kinross and Silver Standard to validate the 'past producer' status and infrastructure claims.
Full transcriptexpand
0:08
Unidentified speaker (UNKNOWN): This
0:08
Unidentified speaker (speaker_0): interview is being disseminated on behalf of Silver One Resources. My name is John Fenneck. I'm your host with the Fennec Commodities Report. And with me today, we have two people: Don Durett, my partner from uh GoldstockData.com, and we have Greg Crow, who is CEO of Silver One Resources. Gentlemen, welcome.
0:27
Unidentified speaker (speaker_1): Thank you very much, uh John and Dawn. Good to be here.
0:31
Unidentified speaker (UNKNOWN): Yeah,
0:31
Unidentified speaker (speaker_2): welcome, Greg.
0:32
Unidentified speaker (UNKNOWN): Yeah, great to have
0:32
Unidentified speaker (speaker_0): you, Greg. Would you
0:33
Unidentified speaker (UNKNOWN): be
0:33
Unidentified speaker (speaker_0): kind enough to give us maybe a 10-minute overview using your slides there and we'll ask some questions?
0:38
Unidentified speaker (speaker_2): Before we continue, be sure to subscribe to our channel and ring the bell to get notified about our last videos.
0:44
Unidentified speaker (speaker_1): Sure. There's a photograph of our flagship project called the Pass Producing Candelaria Silver Mine. in the state of Nevada. It comprises two big open pits and two big heap leech pads, which you see one of each in here. Not much left of the old processing site. Some of the main aspects
1:04
Unidentified speaker (speaker_1): of this are we've got a large resource. We've got about 126 million ounces of silver equivalent, and that's at the measured and indicated levels using the 43101 measurements, the Canadian measurements. Not only that, we boast one of the richest silver
1:23
Unidentified speaker (speaker_1): concentrations of a resource, with 88% being silver and the remainder being gold. We have no other elements right now in our resource base. We are permitted, it's a brownfields operation. The permits have to be updated, but essentially, since the past producer never fully
1:43
Unidentified speaker (speaker_1): reclaimed the project, our permits just have to go through an update. So that could be relatively rapid after we submit what's called a plan of operation. We've got about 32 million Canadian the bank, and we are aiming to get a pre pre-feasibility feasibility study out. We hope to have it by the end of the year, but it might
2:03
Unidentified speaker (speaker_1): be Q1 of 2027. So essentially, we also have the ability to restart the mine with one of the lowest capex in terms of silver ounces in North America. And our resources open along strike and down depth. We're currently doing about a 20 to 25,000
2:23
Unidentified speaker (speaker_1): meter drill program to expand that resource. And we also have potential to increase recoveries with some new recovery leaching techniques. Now, Kin Ross was the big previous operator. They mined it up until 97-99. The reason they decided to shut down was because
2:43
Unidentified speaker (speaker_1): silver prices went well under $5 per ounce. They produced about 68 million ounces. That $5 per ounce was versus in current prices of $50
2:56
Unidentified speaker (speaker_1): per ounce. We acquired our project from actually Silver Standard, which is now SSR Resources. They had bought it off of Kinross. We now own 100% with no royalties back to SSR. What are the big points? Nevada essentially. number one
3:16
Unidentified speaker (speaker_1): in terms of mining jurisdictions on the Fraser Institute. We're in the state. This second, what's called the Silver State, second largest silver producer after Alaska in the United States. Here are some of the details. We've got tax of 5%. We have power to the site at nine cents per kilowatt
3:36
Unidentified speaker (speaker_1): hour, and we have abundant water on. site as well. We also have a paved road right to the site. So we have a lot of the infrastructure with a lot of other companies would have to pay hundreds of millions of dollars to have. Now, here are some of the permits we need to get. As I said, after we submit a plan of operations, it'll
3:56
Unidentified speaker (speaker_1): be a matter of months, perhaps up to a year, to get all of the permits updated, and that will allow us to get into a production decision. If you look at most greenfield type projects, it can take five to twenty years to get into a permitted situation. We can
4:16
Unidentified speaker (speaker_1): do that within a matter of, as I said, either month or up to a year. Here's some of the infrastructure main highway that joins Reno to Vegas, two miles of paved road, two big leech pad, two big open pit, a working power line, and we have more than enough water for restarting this
4:35
Unidentified speaker (speaker_1): operation. And we have a permitted area that just needs the permits renewed. Here are some of the resources we've got. In the ground resource, open pit mineralization constitutes about 71 million ounces of silver equipment. equivalent at the measurement indicated. We have another starting into the
4:55
Unidentified speaker (speaker_1): underground after that. We've just started, we've already expanded that to another 400 meters beyond this resource. So that's going to grow. And we have leech pads with another 50 million ounces of silver equivalent sitting on them. Now, if we look at essentially these resources, this was calculated at 27.
5:14
Unidentified speaker (speaker_1): 2750. If we assume $60 per ounce, that in ground resource of 71 million ounces measured and indicated will jump to almost 110 million ounces silver equivalent. And that's about a 55% increase just by the increase in uh
5:34
Unidentified speaker (speaker_1): essentially the silver prices. These are some of the peer groups that we have. And if we look at essentially which ones are really true silver companies, we look at silver one, about 88% pure silver with a little bit of gold. Most of the other ones are deemed to be more
5:52
Unidentified speaker (speaker_1): polymetallic with silver, lead, zinc, and uh some gold. So we really boast one of the purest uh silver plays. uh around. Here are some other comparisons that we have. We're looking at the enterprise value. These are sort of the enterprise values of some of the
6:12
Unidentified speaker (speaker_1): developers. We're way down here, we're way undervalued. Uh, and uh if we could be re-rated up to the development uh stage after we get our pre-feasibility study out and we get our um plan of operation submitted to update those permits, then we I think we'll have
6:32
Unidentified speaker (speaker_1): a significant re-rating up into the development uh developer level. These are the steps that we need to get into production. We're currently working on this pre-feasibility study, which will be followed by a plan of operation in 27. The permit amendments hopefully will also be in 27, early 2020. 28, and
6:52
Unidentified speaker (speaker_1): then we will make a production decision, start project financing. We could be in production by the latter part of 2028. These essentially some of the milestones that we've achieved. We've done quite a bit this year. We redrilled the leech pads and put up the new measure measured and indicated resource of almost 50
7:11
Unidentified speaker (speaker_1): million ounces silver equivalent. We did a geotechnical. evaluation for pushing back the two big open pits to make one big super pit. We've done more metallurgical work. We're just waiting on the final results of that. We did a huge airboard electromagnetic survey called the ZTEM survey.
7:31
Unidentified speaker (speaker_1): We outlined seven more silver targets and six porphyry targets for blue sky expiration on top of. going to a pre-feasibility study and a production uh decision on the silver. And we completed a significant private placement back in January. So we're financed to do that. Going forward, we've got 20
7:52
Unidentified speaker (speaker_1): to 25,000 meters of drilling to expand that resource, look at some new targets. We want to get that plan of operations in to update the permit, and then we will. do project financing after the pre-feasibility study and the permits. Essentially, the pre-feasibility study will look at bringing into
8:11
Unidentified speaker (speaker_1): operation the heap leach material and the fresh in-ground material. So, ways that we can grow this project are looking at the two big open pits, drilling to the north. We're currently drilling right around in here, and we've got we're going to try and expand that resource. We're looking at essentially pushing back
8:31
Unidentified speaker (speaker_1): the two big pits into one big super pit. And we've got a lot of other expiration targets. The two pits sit right here. This is the project, which boasts almost 30,000 acres of ground yet to explore. These are some of the high grade intercepts that we have, and we expect to be getting more. as
8:51
Unidentified speaker (speaker_1): we're drilling away with two new drills coming on site for a total of three deals starting in the next couple of days. We've got two other projects.
9:09
Unidentified speaker (speaker_1): Our neighbors are the big boys, Freeport Matt Moran, BHP, Rio Tinto, Capstone. We've had expressions of interest to partner on the porphyry copper exploration while we develop the silver. We have another very good prospect in eastern Nevada. And we're not doing a lot of work there, but this would support
9:29
Unidentified speaker (speaker_1): another junior company on its own. And we plan to get there to do more exploration. expiration. It's just that we're concentrating on Candelaria and Phoenix Silver to start. Here's our share structure that you can see there, issued an outstanding 350 million shares. Essentially, we've got some options and warrants. Um, we've got a
9:48
Unidentified speaker (speaker_1): treasury of about 32 million right now and uh no debt. Um, the warrants, which are almost in the money, they're in the money when I put this slide up, but we'll bring in another six and a half million uh dollars, and we have some more expensive warrants. We'll bring in about double that. And our largest shareholder is Eric Sprott, uh, 16%.
10:09
Unidentified speaker (speaker_1): He came in on the last financing, he put in 10 of the 32 million, and uh that was the fourth time he's invested in our company. Jupiter out of London, a big long-term holder, is into our company by about 4%. Commodity capital out of Switzerland, Libra Advisor. out of New York. We've got about
10:28
Unidentified speaker (speaker_1): 20 other high net worth individuals and family funds that are also into the company, and we're on the SPROT ETF index as well. Here essentially are the people involved. We've got some people well known, Luke Norman, U.S. Gold Corp, Raul Diaz worked with Penioles
10:48
Unidentified speaker (speaker_1): out of Mexico for years. He's our VP. of Expiration. Ken Anquest has just recently come on and he's going to be spearheading a lot of the engineering work. So that's really our story. And um I will open it to any questions that you have right now.
11:05
Unidentified speaker (speaker_0): Nice job, Greg. Thank you. If you can just go back one slide uh to the share structure. Had a question for you on the 32% there. Like
11:13
Unidentified speaker (UNKNOWN): Don
11:14
Unidentified speaker (speaker_0): and I look for companies that have 30% or more, which clearly you do, but you know, we want 30% that aren't going to sell, you know, to a, you know, uh a predator in this kind of market for lack of a better word. So what what confidence level do you have that you've got about thirty percent of the share structure tied up in good hands?
11:34
Unidentified speaker (speaker_1): Uh very confident. I don't think anybody would want to sell at this level. You're quite correct. I mean our uh high for the 52 was about 85 cents uh Canadian. Um, so I think uh we're very undervalued, as are many of the uh uh juniors at this time. But uh with increasing silver prices, I think you'll see us get
11:53
Unidentified speaker (speaker_1): re-rated. With our pre-feasibility study, we'll you'll I think you'll see us get re-rated. re rated. So I don't think any of these people would sell that cheaply.
12:02
Unidentified speaker (UNKNOWN): And the
12:02
Unidentified speaker (speaker_0): pre-feasibility. prefease uh is scheduled for when again, please?
12:06
Unidentified speaker (speaker_1): We're trying for the end of this year, but I think it's gonna go into January. The engineers just
12:10
Unidentified speaker (UNKNOWN): take a
12:10
Unidentified speaker (speaker_1): little bit of time to tweak things, okay?
12:12
Unidentified speaker (speaker_0): Yeah. That might work to your benefit anyway. I mean I think it looks like it's gonna raise December ninth and uh probably get some type of relief rally in Q one. So um the the other question I had for you was on slide ten, 10. if you could go back there, please. Yeah so this is the kind of thing that Don and I talked to CEOs about, you know, adding to
12:32
Unidentified speaker (speaker_0): their deck where they have some type of game plan in place. And then slide eleven also discusses that more in detail. But um I just wanted to point this out because I know Don's going to have some questions about it.
12:44
Unidentified speaker (speaker_1): Okay. Not a No problem.
12:45
Unidentified speaker (UNKNOWN): Go
12:45
Unidentified speaker (speaker_0): ahead Don.
12:47
Unidentified speaker (speaker_2): So you're aiming right now for construction second half of 28, and that looks pretty doable. My question to you is is the how long is the build? Is it a one-year build?
12:58
Unidentified speaker (speaker_3): Well, okay, it's a bit complicated because we have the leech pads and we have the fresh in-ground mineralization. So essentially, we plan on starting with one of the leech pads, which has about a two to three year estimated mine life based on the tonnage and the fact that we hope to be producing at about 15,000
13:18
Unidentified speaker (speaker_3): tons per day. That gives us time to do any additional engineering work we need to bring into production the fresh mineralization in the open pit. And that will essentially follow about three years after we get into production on the heap leach. There's about seven years of worth of mineralization there. And then there's another, uh,
13:38
Unidentified speaker (speaker_3): sorry, there's about uh four or five years mineralization there, and then we have another couple of years mineralization on the other leach pad, which takes us to year 11 or 12. Plus, we are drilling to expand the resource, which will give us additional years of operation that may require a different
13:57
Unidentified speaker (speaker_3): style of permitting, but we have lots of time to work that out.
14:01
Unidentified speaker (UNKNOWN): So
14:01
Unidentified speaker (speaker_2): since you're going to start with a heap leach pad, that means the initial build for that to get into construct get into production will only be six months?
14:11
Unidentified speaker (speaker_1): Yeah, it just depends on procurement of equipment. Uh things are a little slow right now.
14:16
Unidentified speaker (UNKNOWN): Let's say six months to a year. Let's say
14:18
Unidentified speaker (speaker_2): call it six to nine months probably. Yeah,
14:20
Unidentified speaker (speaker_1): six months Most to a year. Let's let's be I I like to
14:23
Unidentified speaker (UNKNOWN): be a little
14:23
Unidentified speaker (speaker_1): more conservative.
14:25
Unidentified speaker (speaker_2): All right. Yeah. At most a year um, middle of 29. So yeah, you said that you know you're very undervalued, uh, you know, at 60 cents uh currently, uh EV per ounce. You're so undervalued that you know, right now I know all the miners. Um, it's hard for me to find one that's cheaper than yours right now. So
14:45
Unidentified speaker (speaker_2): you're you have 125 million ounces of silver, which is quite a bit. If you mine five 5 million ounces. a year, um your free cash flow. So I'm a speculator. I don't invest for the next 12 months. I really don't care about the next 12 months. As far as I'm concerned, the next 12 months is just noise. So from my perspective,
15:05
Unidentified speaker (speaker_2): I don't care about the current silver price. If I'm investing 24 months down the road, 36 months down the road, why should I care about the current silver price? So if the silver prices go double from here, 50 to 100,
15:21
Unidentified speaker (UNKNOWN): on
15:21
Unidentified speaker (speaker_2): your upside, on your free cash flow, I firmly believe that for every 1 million ounces of silver, you're going to get about $50
15:31
Unidentified speaker (speaker_2): in free cash flow. So in Nevada, you get a pretty darn good multiple. I would say at least a 10, that's 500 million. So basically at $100, it's basically $500 million per million. So if you have five, if you produce $1 million ounces, it's $2.5 billion at $100 silver or $120, let's call it $120 silver.
15:52
Unidentified speaker (speaker_2): Say somewhere in there, $100, $120. Incredibly cheap. It's like it's ridiculously cheap if I'm right about the current silver prices. The one thing that I look for as an investor um is I look for companies that kind of have a really all they have to do is execute, right? And that's kind of what you have to do. I
16:12
Unidentified speaker (speaker_2): mean, you have the silver, all you have to do is permit it, build it, put it in production. It's kind of an easy story. Plus it's open pit, which makes it even easier. It's It's in in Nevada. well, Well, it it starts starts
16:22
Unidentified speaker (speaker_1): with with heap eight bleaches, bleaches. it's It's even even easier. easier.
16:25
Unidentified speaker (speaker_2): It's in Nevada, which is a really good location. So really the only variable here is the silver price, which is amazing. And you I I think by the time you get into production in 29, uh, maybe for Q428, but it's probably going to be Q H129. By the time you get into production, um,
16:45
Unidentified speaker (speaker_2): I think you'll easily get $50 margins. So it's hard for me, you know, to to tear holes. in your company, tear holes in your project. You did a really good presentation. Um one thing I just want to point out here is the is the blue sky. I mean, what I just mentioned is what they already have, the 125 million. This is they have a lot of
17:05
Unidentified speaker (speaker_2): targets, 30,000 acres. This is gonna get bigger. Plus the blue sky, you get the Phoenix Project for free, you get the Cherokee project for free. This is one of those what I call specul spec bets that is really, really juicy. But so when you said you're undervalued, everybody's undervalued, but there's only a few that are extremely undervalued.
17:25
Unidentified speaker (speaker_2): I I would put you in the extremely undervalued category. I love I love what you said about insiders. The reason why I'm not asking questions is because I don't really have any. You kind of check all the boxes. I you did a great job in your presentation. You showed us the inside. insiders, 30% solid. Eric Sprock, 15%. Your cash balance is really, really
17:45
Unidentified speaker (speaker_2): strong. You don't need to dilute to get unless you drill really, really aggressively between now and you know, um, into 27. You probably don't need to dilute. Right now, I have you kind of one of the highest rated, you know, silver development stories on my website. Um I just think I just think that um it's hard to poke holes in
18:05
Unidentified speaker (speaker_2): this project. I've hung on to your company or so I've owned this stock for a long time because I've always liked Candelleria. I've always said candelleria is worth a lot of money. All we need is higher silver prices. I'm glad you guys were able to hold on to it. And so um so yeah this is going gonna to be this is going gonna to be a really great story. My final question to
18:24
Unidentified speaker (speaker_2): you is you are going to be a billion dollar company, right? I mean, you're currently 90 million. You're going to be a billion dollar company. So if that's the case, I mean you have Phoenix and Cherokee, but you know, now, I mean, are you guys gonna start thinking in terms of but you know, let's start looking at other projects
18:45
Unidentified speaker (speaker_2): and Another other assets in in Nevada, for instance, or n other assets, period. At what point will you start to look at other assets?
18:53
Unidentified speaker (speaker_1): Well, we've been approached about other assets already. Uh, you know, we'll look at them, but we're not really interested in early expiration assets, which are a lot of the cases that come about. We're interested in things that would be uh more advanced at the development stage or pre-production stage. And I think we can afford to do that. But
19:13
Unidentified speaker (speaker_1): again, we need to get re-rated a little bit and get a little bit of strength behind us. Otherwise, how do we pay for some of those new assets without diluting? And uh we want to come in from a position of strength, which is what we want to do. But we are looking and uh we're keeping our eyes open.
19:31
Unidentified speaker (speaker_2): Awesome, awesome. That's fantastic. But one thing about it when you do acquisitions, a lot of times if you do an all-share, all share deal and it's a creative. accretive,
19:39
Unidentified speaker (UNKNOWN): it's
19:39
Unidentified speaker (speaker_2): not going to hurt you.
19:41
Unidentified speaker (UNKNOWN): Um
19:43
Unidentified speaker (speaker_1): as an example, look at Candelleria. When we did the deal with Candelleria, it started out as an all-share deal. We gave Silver Standard 3 million US dollars in shares of silver one, US dollars and shares of silver one. We had to replace a reclamation.
20:03
Unidentified speaker (speaker_1): bond of $2.5 million. And after one year of commercial production, we're on the hook for another $500,000 shares and another um $500,000, and that's it. So that was the acquisition.
20:16
Unidentified speaker (speaker_2): I'm back here laughing. There's so many beautiful silver projects that SSR mining gave away, and this is
20:23
Unidentified speaker (UNKNOWN): one of them.
20:24
Unidentified speaker (speaker_2): Argenta is another example. uh I mean, these are company builders, and they basically basically gave them away. It's unbelievable.
20:32
Unidentified speaker (speaker_1): Well, they were they were rebranding, they were emerging with LSR.
20:35
Unidentified speaker (speaker_2): Well,
20:35
Unidentified speaker (UNKNOWN): they didn't becoming a
20:37
Unidentified speaker (speaker_1): gold miner.
20:37
Unidentified speaker (speaker_2): Yeah, we see this quite often where companies they don't care about the long term. So what if silver goes to 100? We don't care. And you know, in hindsight, you know, it it it doesn't look good down the road. It it it was a very risky. thing to give away high quality silver projects, which we're seeing today, but it was it turned out great for silver one. Well, Greg,
20:57
Unidentified speaker (speaker_2): thanks for being on the show. Um I'm sure your stock should bounce uh quite a bit. When silver gets to a hundred dollars, I think your stock will, you know, it should do really well between now and a hundred bucks. And then once it once we get above a hundred dollars, I think we're gonna stay there. And then so at that point, you know, you're just kind of
21:17
Unidentified speaker (speaker_2): just riding the wave, the high silver price wave into production. But thanks for coming on.
21:23
Unidentified speaker (UNKNOWN): Well
21:23
Unidentified speaker (speaker_1): th well thanks a lot, uh Don and John. Uh it was a pleasure to speak with you. And um I'm sure we'll see each other again.
21:30
Unidentified speaker (UNKNOWN): That's
21:30
Unidentified speaker (speaker_0): great, Greg. Thanks a lot for coming on. Uh Greg Crow, CEO of Silver Sober One Resources. We'll uh wrap it up there, guys. And um if you want to check out our websites, Sober One dot com for the company we just interviewed. For me it's fenonconsulting.com and for Don it's Goldstockdata.com. Thanks
21:50
Unidentified speaker (speaker_0): everyone.
This page was produced automatically: the audio was transcribed with nvidia/parakeet-tdt-0.6b-v3+sortformer-v2.1 and interpreted by Qwen3.6-35B-A3B-UD-IQ3_S.gguf. Transcription and interpretation can contain errors; always confirm against the original episode. Nothing here is investment advice.
All insights