Sarah Jewett, COO of Fervo Energy, explains how the company applies shale oil and gas optimization strategies to Enhanced Geothermal Systems (EGS) to reduce costs and scale deployment. She highlights Fervo's acquisition of low-cost acreage in 2017 and the progression from the Project Red pilot to the larger Cape Station project in Utah. Jewett notes that while early financing was challenging, the Inflation Reduction Act (IRA) tax credits and demand from AI hyperscalers have improved project economics. She advocates for federal permitting reform to enable replication of successful models across states. Fervo recently raised $2.2 billion in its IPO to support expansion toward a goal of 300 gigawatts of US geothermal capacity.
Key takeaways
- 1 Modularity and repeatable well-field development plans are central to Fervo's cost reduction strategy, mirroring the shale industry's approach to smoothing fixed costs over higher volumes of operational activity.
Unidentified speaker (speaker_0) · 10:31
Episode sections
- 0:01 – 2:46
Introduction to Fervo and EGS Technology
The episode introduces Enhanced Geothermal Systems (EGS) as a method to unlock geothermal energy globally by fracturing hot, dry rock, moving beyond traditional geographic limitations. Fervo Energy is highlighted as the leading company in this space, having scaled from a 2023 pilot to utility-scale operations.
- 2:46 – 8:25
Sarah Jewett's Background and Shale Playbook Strategy
COO Sarah Jewett discusses her transition from oil and gas to geothermal, emphasizing how Fervo applies lessons from the shale industry, such as rapid learning curves and repeatable deployment, to reduce costs. The company acquired vast acreage in 2017 at low costs to secure high-quality geothermal resources.
- 8:25 – 14:37
Project Red, Cape Station, and Supply Chain Similarities
Jewett details Fervo's progression from the Project Red pilot in Nevada to the Cape Station project in Utah, noting the similarity between geothermal and fracking supply chains. She explains the shift toward modularity and multi-well pad development to drive down costs through repetition.
- 14:37 – 22:03
Financing, IRA Impact, and AI Demand
The discussion covers the challenges of financing early-stage geothermal projects and how the Inflation Reduction Act (IRA) tax credits, combined with rising demand from AI hyperscalers, improved project economics. Jewett argues that demand is diversified beyond just AI, including utilities and industrial customers.
- 22:03 – 28:08
Permitting Reform and Political Neutrality
Jewett advocates for federal permitting reform to create predictability across states, allowing Fervo to replicate its success in Utah in other regions. She attributes geothermal's bipartisan appeal to its ability to leverage the existing shale workforce and technology to replace fossil fuels with clean energy.
- 28:08 – 31:55
IPO, Public Markets, and Future Scale
Fervo's recent IPO raised $2.2 billion, providing capital for expansion. Jewett outlines the path to scaling 300 gigawatts of geothermal capacity in the US, emphasizing that cost reductions will come from incremental engineering improvements rather than single breakthroughs, aiming for a $3,000/kW cost target.
Assets discussed
| Asset | Kind | Stance | Context |
|---|---|---|---|
| Fervo Energy CoFRVO | equity | neutral | only one has delivered the technology at utility scale, and that's Fervo Energy. |
“Stance” is how the speakers talked about the asset, not a recommendation.
Claims worth verifying
EGS operators blast high-pressure specialized fluid into hot, dry rock thousands of feet beneath the ground to create a reservoir.
Unidentified speaker (speaker_1) ·0:42
How to verify: Review technical white papers or engineering reports from Fervo Energy or the Geothermal Energy Association describing EGS mechanics. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.
Fervo began commercial operations at Project Red, a pilot in Nevada, in 2023.
Unidentified speaker (speaker_1) ·1:02
How to verify: Check Fervo Energy press releases or news archives from 2023 regarding Project Red commissioning. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.
Cape Station in Utah is slated to deliver roughly 500 megawatts once it reaches full capacity in 2028.
Unidentified speaker (speaker_1) ·1:22
How to verify: Review Fervo Energy project documentation, press releases, or SEC filings (if available) detailing Cape Station's capacity and timeline. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.
Primary sourceGoogle, Shell, and Southern California Edison have signed power purchase agreements with Fervo.
Unidentified speaker (speaker_1) ·1:41
How to verify: Search for official press releases from Fervo Energy, Google, Shell, or Southern California Edison confirming these PPAs. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.
Fervo went public in May 2026 at a valuation exceeding $7 billion.
Unidentified speaker (speaker_1) ·1:41
How to verify: Review the S-1 registration statement or prospectus filed with the SEC for Fervo Energy's IPO. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.
Primary sourceSarah Jewett graduated from Dartmouth with a mechanical engineering degree.
Unidentified speaker (speaker_0) ·3:20
How to verify: Check Sarah Jewett's LinkedIn profile or professional biography. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.
Sarah Jewett joined Schlumberger's engineer rotational program after working in Wyoming and Texas.
Unidentified speaker (speaker_0) ·4:58
How to verify: Review Sarah Jewett's professional history on LinkedIn or company press releases from Schlumberger. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.
Fervo acquired hundreds of thousands of acres in the West in early 2017 at an average of four dollars per acre.
Unidentified speaker (speaker_2) ·6:26
How to verify: Review land lease records or Fervo Energy's investor presentations detailing acreage acquisition costs and dates. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.
Fervo's early developments operated at 375 degrees Fahrenheit, later inching up to 400 degrees.
Unidentified speaker (speaker_0) ·9:11
How to verify: Review technical specifications or press releases from Fervo Energy regarding temperature milestones at Project Red and Cape Station. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.
Fervo's IPO raised $2.2 billion.
Unidentified speaker (speaker_0) ·28:27
How to verify: Review the S-1 registration statement or prospectus filed with the SEC for Fervo Energy's IPO. For recent events, verify 2026-08-10 through 2026-11-10. Use another period only when the speaker explicitly names it.
Primary sourceDo your own research
- Verify Fervo Energy's S-1 filing for detailed financials, risk factors, and use of IPO proceeds.
- Check the specific terms and duration of Power Purchase Agreements (PPAs) with Google, Shell, and Southern California Edison.
- Review the Inflation Reduction Act (IRA) tax credit provisions for geothermal energy and their impact on project economics.
- Research the permitting timelines and regulatory hurdles for geothermal projects in Utah versus other states.
- Analyze the technical feasibility of increasing temperature ratings for off-the-shelf drilling equipment to 400°F+.
- Compare Fervo's cost reduction trajectory against traditional geothermal and other renewable energy sources.
- Assess the competitive landscape for Enhanced Geothermal Systems (EGS) providers.
- Investigate the specific details of the 300 gigawatt capacity goal and the engineering assumptions behind the $3,000/kW cost target.
Full transcriptexpand
- 0:01
- Unidentified speaker (UNKNOWN): And
- 0:02
- Unidentified speaker (speaker_0): the whole reason that Fervo exists is to open up the geographic aperture of geothermal. I am not looking to develop in Utah and Nevada for the rest of my life here. There is a huge amount of demand in Utah and Nevada, but we believe at Fervo that this could be a global resource because we're pulling the cost down so much that it will be cost competitive in many different
- 0:21
- Unidentified speaker (speaker_0): geographies.
- 0:22
- Unidentified speaker (speaker_1): For decades, geothermal energy's potential was limited by geography. Developers could only drill where hot water or steam was naturally trapped in the rock. Then came enhanced geothermal systems, or EGS, and the playbook changed completely. Unlike conventional geothermal, EGS borrows straight from the oil and
- 0:42
- Unidentified speaker (speaker_1): gas sector. Operators blast high-pressure specialized fluid into hot, dry rock thousands of feet beneath the ground, fracturing it to create a reservoir. Water then absorbs the heat and returns it to the surface to drive a turbine. Because it doesn't depend on natural hotspots, EGS can unlock clean 24-7 power in
- 1:02
- Unidentified speaker (speaker_1): previously untapped places. There are a number of innovative companies active in the EGS space, but only one has delivered the technology at utility scale, and that's Fervo Energy. Fervo began its commercial operations. at Project Red, which was a pilot in Nevada in 2023. From there, it scaled fast. Its flagship
- 1:22
- Unidentified speaker (speaker_1): facility, Cape Station in Utah, is slated to deliver roughly 500 megawatts once it reaches full capacity in 2028. Not bad for beginning operations this September. Drilling times and costs have already plummeted, and major buyers from Google to Southern California. Edison and Shell have signed power purchase
- 1:41
- Unidentified speaker (speaker_1): agreements. This May, Fervo went public at a valuation exceeding $7 billion. And with two more projects in the works, Fervo is showing no signs of slowing down.
- 1:51
- Unidentified speaker (speaker_0): We like to say at Fervo that we are running the Shale playbook, but 20 years later with the answer key.
- 2:01
- Unidentified speaker (speaker_1): This is critical capital.
- 2:12
- Unidentified speaker (UNKNOWN): I'm
- 2:13
- Unidentified speaker (speaker_1): Alfred Johnson, the CEO of Crux. We're the capital platform for clean and critical infrastructure. My guest today is Sarah Jewett, the COO of Fervo Energy. Like EGS technology itself, Sarah got her start in the oil and gas sector. Today she helps Fervo scale its early pilot tests into utility scale reality. In our
- 2:32
- Unidentified speaker (speaker_1): conversation, Sarah and I discuss how her background in oil and gas shaped her work at Fervo, how the company has diversified its customers beyond the AI boom, and how permitting reform would make EGS generation even more predictable.
- 2:46
- Unidentified speaker (speaker_2): Sarah Jewett, welcome to Critical Capital.
- 2:49
- Unidentified speaker (speaker_0): Thank you so much. I am so happy to be here.
- 2:52
- Unidentified speaker (speaker_2): It's awesome to have you. So we're going to talk a lot about geothermal, but I actually want to start by not talking about geothermal at all. We're going to start by talking about oil and gas. You started your career in the oil and gas fields, which is relevant because the technology that geothermal uses draws on a lot of the lessons learned from
- 3:12
- Unidentified speaker (speaker_2): fracking. Tell us how your early experiences in the fields have influenced the way in which you've thought about this opportunity.
- 3:19
- Unidentified speaker (UNKNOWN): Yeah,
- 3:20
- Unidentified speaker (speaker_0): you bet. I think we've learned at Fervo that many good stories start in the oil and gas industry and translate well into geothermal. And mine is no exception. So when I graduated from Dartmouth with my mechanical engineering degree, I made a move that much to the shock. of my parents and friends
- 3:40
- Unidentified speaker (speaker_0): and classmates, moved out to Rock Springs, Wyoming, and I joined a traveling hydraulic fracturing crew with Slumberger. Yeah, my first shift was a night shift in the Jonah field. And I thought, wow, this is both so perfect. And what have I done?
- 3:54
- Unidentified speaker (speaker_2): Tell me about what led you to geothermal as an area of interest.
- 3:59
- Unidentified speaker (speaker_0): Yeah, that's right. I mean, the story really starts in in college. I was pretty laser focused on ending up in clean energy. And I logged a slew of clean energy internships. And then for my last internship, oh, I thought, oh, why not? I'll work in oil and gas and really understand the dark side of energy. And then
- 4:19
- Unidentified speaker (speaker_0): that will help arm me with better information to go start my career in clean energy. So I went to work for a small oil field services show. shop in Houston and I had a blast. I mean, they sent me out to work over rigs in Midland, Texas. They sent me to artificial lift assembly shops in Sand Springs, Oklahoma, and I was just like
- 4:38
- Unidentified speaker (speaker_0): happy as can be. And I thought to myself, this industry can offer really hands-on learning. And I will get to deploy engineering knowledge, I'll get to learn about logistics, people management, all these different things. I got convinced I'm gonna go work in, you know, Slumberger's engineer rotational program for
- 4:58
- Unidentified speaker (speaker_0): a couple of years. And they totally sold me on it. And I flew up to NISQ, Alberta, and had my interview. And I said, this is definitely where I want to work and launch my career. And so I did it. And man, my time in oil and gas was just awesome. I can't say enough things about it. Some of it is type two fun, where looking back on it now,
- 5:18
- Unidentified speaker (speaker_0): you know, it was the greatest experience of my life. And some of it, of course, probably was not so rosy at the time. But when I left there to go get my MBA, I really thought, man, it would be cool to capture a lot of the learnings and a lot of the things that I've experienced at Slumberger, both from field work and from subsurface understanding when I go into clean
- 5:39
- Unidentified speaker (speaker_0): energy. I didn't quite find that when I was in my MBA. So I joined back up with the oil field service industry and kept my eye on the market and was really looking around and finally started hearing about these innovative subsurface companies that were deploying, you know, similar technologies to what had been deployed in Shale, but for the purposes of clean
- 5:59
- Unidentified speaker (speaker_0): energy deployment. And I just thought, oh man, this if I can deploy myself. my skills here, this is going to be a perfect fit for me. And here I am.
- 6:06
- Unidentified speaker (speaker_2): Okay. So you're basically in an episode of Landman. You go to business school, and then you come out the other side and go back into the oil and gas industry briefly, and then meet up with Tim Latimer, who had started the company in 2017. And I heard this amazing story from Tim at one point of how you came to
- 6:26
- Unidentified speaker (speaker_2): acquire. hundreds of thousands of leases or acres of leases in the West at something like four dollars on average per acre. I think now some of that acreage trades at hundreds of dollars. How did you pull that off?
- 6:41
- Unidentified speaker (speaker_0): Yeah. So talk about an episode of Landman. Here we are in early twenty 2017, seventeen, the landman landmen of Garmois. GF Erwart. Um
- 6:49
- Unidentified speaker (speaker_2): that's season four.
- 6:51
- Unidentified speaker (speaker_0): But really,
- 6:53
- Unidentified speaker (speaker_0): we like to say at Fervo that we are running the Shale playbook, but 20 years later with the answer key. And so there are pieces of the shale strategy that were very easy to adopt when we were crafting our strategy at Ferbo. Burbo. A lot of that has to do with learning
- 7:12
- Unidentified speaker (speaker_0): curves and repeated deployment. Another one that was really informative in our early strategy was we believe the technology is going to work. We believe the technology is based in physics. We're going to deploy it. It will eventually work. And when it works, we want to have already picked up all of the best places to deploy the
- 7:32
- Unidentified speaker (speaker_0): technology that we possibly can at a time when no one else cares about that land and it's really very cheap. And so that is what the founding team started to deploy in 2017. They said, we are gonna go at the market with a geologic layer. We're gonna go find the highest quality geothermal
- 7:52
- Unidentified speaker (speaker_0): acreage, and we're gonna overlay a commercial layer on top of that. It has to have some believable delivery pathway to a customer. And if it has that, we're going to go ahead and we're going to buy it. And so we did. And, you know, we find ourselves today with a pretty massive least acreage portfolio. And a lot of that is really, really high
- 8:12
- Unidentified speaker (speaker_0): quality acreage.
- 8:13
- Unidentified speaker (speaker_2): How much, Sarah, is the supply chain for geothermal different or similar to fracking? Is it more or less exactly the same? Or is there, are there specialty components?
- 8:25
- Unidentified speaker (speaker_0): It's incredibly similar. So you should think about our businesses. You should kind of bifurcate how you think about our business. We have the subsurface portion, the geothermal extraction portion, and then we have the surface portion, which is build out of power plants and transmission lines. And when you look at the subsurface portion, the supply chain is incredibly Really
- 8:45
- Unidentified speaker (speaker_0): similar to the oil and gas industry with a couple of key changes. We're operating at higher temperatures.
- 8:51
- Unidentified speaker (speaker_0): We're operating often at wider diameters. And these are things that we've kind of gotten to incrementally because we've always said that we will use off-the-shelf technology so that we don't have to go invent something, you know, invent a tool to enable the geothermal energy to be extracted. That's actually why you saw, you know,
- 9:11
- Unidentified speaker (speaker_0): our early developments were at 375 degrees Fahrenheit. And then we kind of inched up the temperature and we're developing at 400, now developing, you
- 9:19
- Unidentified speaker (UNKNOWN): know,
- 9:19
- Unidentified speaker (speaker_0): higher than that. And that is because we are kind of following the high-end rated temperature window of all the tools and technology that exists. And then a lot of our suppliers have come along with us and said, okay, we now believe in purposely and we're going to help upsize something, or we're going to help, you know, increase the resiliency by deploying a different.
- 9:39
- Unidentified speaker (speaker_0): material to be more resilient at a higher temperature. And it's been a really, really productive RD journey with our supplier partners.
- 9:47
- Unidentified speaker (speaker_2): You've also made a big bet on modularity. Can you say why that's so important?
- 9:51
- Unidentified speaker (speaker_0): Yeah, absolutely. So this is a big learning from the shale playbook that when any operator entered a shale basin, their most expensive wells were the first wells that they drilled. And then over time, they learn the resource, they set up infrastructure that's shared over a higher volume of operational activities. They um learn the resource better
- 10:11
- Unidentified speaker (speaker_0): and better and better to the point which they're, you know, focused on every minute of productivity in these wells. And so um, you know, we knew that that was part of the playbook. And we said if we're gonna going to reduce the cost of geothermal energy, repeatability. is going to be a big part of our scale. And so that is what we've done.
- 10:31
- Unidentified speaker (speaker_0): We have built well-field development plans that have highly repeatable models so that we can drill well after well after well after well and not have to redesign it every time and therefore pull cost out of it.
- 10:45
- Unidentified speaker (speaker_2): How did you start to find the places where you would really invest and start to build the projects?
- 10:51
- Unidentified speaker (speaker_0): Yeah, so this is a capital-intensive business. And when you are trying to prove that a capital-intensive business works, no matter how much you believe the technology works, you have to convince people that it works by going through a little bit of milestone-based work. And so the way that I would characterize the early days of Fervo are kind of increasingly
- 11:11
- Unidentified speaker (speaker_0): inexpensive expensive and complex deployments, first on the desktop model. modeling. Next, we did a a four-stage stimulation on an existing, highly deviated, existing well. And then we said, okay, that worked really well. Now we're actually going to go drill our own two well system to build,
- 11:31
- Unidentified speaker (speaker_0): you know, kind of the minimum viable product of a unit of a radiator that we will eventually go repeat over and over again. So we went and this was actually at the same site where we did our four-stage hydraulic fracture on an existing well. We went and built it ended up being a three-well system because it was two horizontal
- 11:50
- Unidentified speaker (speaker_0): wells and a single vertical monitoring well. And we drilled and fractured those wells and proved that you could actually flow and extract heat from that resource. And that is what we call Project Red. We said at the time, okay, we're gonna go deploy the capital to build this. It can't just be a technological pilot. It also needs to be a commercial pilot. Because if we do a technological pilot and
- 12:10
- Unidentified speaker (speaker_0): then move to try to make it commercial, that's too many steps. And so we went out to sell it to the market and say this is a first-of-kind technology demonstration, and we need to find a buyer. And Google ended up signing up as the buyer for that project. And as we built that project, and we proved that the physics worked on that level, we said, okay, now this
- 12:30
- Unidentified speaker (speaker_0): greenlights us to go build a large greenfield development. So that's what we're doing today. We we just announced that we brought online our very first commercial scale power last month, a 33 megawatt power facility in southwest Utah. That is the first of what will become many, many power plants deployed at the same
- 12:50
- Unidentified speaker (speaker_0): time. site at Cape Station.
- 12:52
- Unidentified speaker (speaker_2): Cool. So Project Red comes online in Nevada in 2023. Then your first big utility scale project, Cape Station, started producing power. What did you learn from Project Red about how to bring down the cost curve on subsequent projects that you brought into Cape Station?
- 13:11
- Unidentified speaker (speaker_0): Yeah, well, it it's interesting because the way you asked the question. Project Red, as a minimum viable product, in its design, was not meant to be really repeatable. I mean, we wanted to build a system that we could learn a lot from and then go repeat writ large to actually achieve the learnings. But we had seen in shale,
- 13:31
- Unidentified speaker (speaker_0): oh, learnings are available to us. And if you look at every operator in every shale base in the United States, they start with high cost wells. And over time, by increasing the productivity of those wells, you know, smoothing their fixed costs over a larger volume of operational activity and learning about the resource,
- 13:51
- Unidentified speaker (speaker_0): they end up getting those wells down from a cost perspective over time, to the point where when I was in the oil field, you know, we were trying to eliminate minutes of non-productive time. And that was, you know, sort of boring from a fracturing perspective. But now I'm like totally, you know, excited by the idea of eliminating minutes from our non-productive time schedule. And so we
- 14:11
- Unidentified speaker (speaker_0): knew that it could be done. At Project Red, we were only drilling two wells that looked alike. And so we knew we would have to extend into a greenfield development in order to really achieve those learnings. Now we saw some pretty big efficiencies from well one to well two at Project Red, but it wasn't until we really started drilling, you know, the third, fourth, fifth,
- 14:31
- Unidentified speaker (speaker_0): sixth, seventh to tenth to nth well at Cape Station where we really started seeing the learnings play out.
- 14:37
- Unidentified speaker (speaker_2): Tell me what the life cycle was like to access financing in that era. Was it easy? Was it hard? What was it like?
- 14:45
- Unidentified speaker (UNKNOWN): Um,
- 14:45
- Unidentified speaker (speaker_0): I think you're really, you know, you're really digging into the meat of it here. It's been it's been the hardest thing for us. And I think it remains the hardest thing today. It's it's not dissimilar from hockey, right? We're skating to where the puck is going. You can't finance to where the puck is going. You can finance to where you've gotten to today,
- 15:05
- Unidentified speaker (speaker_0): typically. Because especially when you're at the front end of a technology cycle, you have to convince people that you're coming down the risk curve over time and that they you know, if you're trying to drive down the cost of capital, you're trying to convince them that you're pulling risk out of the asset. And so when you're at Project Red, you're not convincing anyone that the asset is
- 15:25
- Unidentified speaker (speaker_0): low risk because you have no operating track record. You have not proven that the technology is functional yet. You, you know, I think we had proven at that point that we could sign a creative commercial offtake, but we had not proven that we could. sign a full-scale 15-year power purchase agreement with a credit-worthy counterparty. And so you were proving a lot of
- 15:45
- Unidentified speaker (speaker_0): firsts. And that is kind of textbook when your cost of capital is going to remain really high, no matter how creative you get about it. Now, over time, as you start to tick off operational milestones and you say, This is what we are going to do, and these are the results that we expect to see, and you communicate those in advance.
- 16:03
- Unidentified speaker (speaker_0): And then the market says, okay, come back to us when you have results. And so then you come back when you have results and you say, just like we said we would, we went to perform this operation. These are the results that we expected. And then these are the results we achieved. You start to build that track record over time. And little by little, those are the data points that allow you to access a
- 16:23
- Unidentified speaker (speaker_0): broader array of financing. So I'm kind of talking about, you know, this is financial. financing 101, but it it definitely applies to our business in spades, especially as we look to build repeatable low-risk infrastructure from what is perceived as a high-risk new technology.
- 16:38
- Unidentified speaker (speaker_2): Yeah. So Sarah, Fervo was in the process of building when the IRA was passed and the tech neutral credit for geothermal was created. How did that change access to finance?
- 16:51
- Unidentified speaker (speaker_0): I would say it changed it. I mean, it was incredibly helpful. You can't deny that, you know, a tax credit that is reliably 10% year after year, that it moving to 30% or 40% or 50% with adders is going to help your financial picture.
- 17:11
- Unidentified speaker (speaker_0): Interestingly, at the same time, the demand. for what we were building kind of came up simultaneously at the same time that the IRA tax credits were put into place. So in 2023 and four, we started seeing an increased demand for geothermal power. And so the willingness to pay went up and all of the PPA
- 17:31
- Unidentified speaker (speaker_0): prices for geothermal started going up at the same time that we achieved this tax credit. So it was a really nice set of factors.
- 17:39
- Unidentified speaker (speaker_0): that really convinced people that, you know, from a financial perspective, these projects were actually going to be healthy projects, in addition to them, you know, ultimately achieving low risk infrastructure status. And I think it it was really helpful for us to attract more traditional financing to come participate in the big picture.
- 17:57
- Unidentified speaker (speaker_2): Yeah, there were a lot of happenings in 2023 because that was also when the world became much more aware of the commercial potential of AI. And I think you started to sign power purchase agreements with hyperscalers in that period. Uh, how has the explosion of behind the meter
- 18:17
- Unidentified speaker (speaker_2): power influenced the way that you think about the company?
- 18:20
- Unidentified speaker (speaker_0): It's definitely added to demand. I think there is a misconception that our business is only alive because of hyperscaler demand. And that is not true. I joined the business fully convinced that we had a massive customer base prior to AI demand even being on my
- 18:40
- Unidentified speaker (speaker_0): radar. We saw because of a result of rolling blackouts and at the time renewable portfolio standard targets, and you saw sort of like this giant. you know, wave of nuclear and old fossil fleets coming offline. And there was this very obvious picture, even without meaningful
- 18:59
- Unidentified speaker (speaker_0): electricity load growth, that there was going to be a massive demand for firm clean energy. And then interestingly, you know, we used to say, oh, electrification, onshoring of manufacturing, retirement of the fossil fleet, these are all the things. that are going to contribute to demand. And then it was like, boom, AI arrived on
- 19:19
- Unidentified speaker (speaker_0): the scene. And all of a sudden that demand started to be more obvious because the load growth was much more massive than we had ever seen in the past. You know, for load growth that's not been growing at any meaningful rate over the last 20 years, the picture is different now. And so AI kind of added to the story in a really meaningful way, but our demand. is really
- 19:39
- Unidentified speaker (speaker_0): diversified and coming from a huge number of places between utilities, large load industrial customers, um, you know, smaller load serving entities, and then AI. And so, you know, did I believe that we would be selling to Google in a meaningful way in 2026, back in 2023? The answer is yes. I didn't
- 19:59
- Unidentified speaker (speaker_0): necessarily believe that we would be talking about a very specific. use of a of a co-located, potential co-located development as the as the off taker for that power.
- 20:09
- Unidentified speaker (speaker_2): Paint what that looks like. When we're talking about a very large scale geothermal project that is close to an AI data center, what does it look like if I were to drop down on the ground?
- 20:20
- Unidentified speaker (speaker_0): Yeah. So because I sing for my own songbook here, I will I will paint the picture of what the geothermal project looks like first. Um the the data center project is kind of like a series of HVAC equipped warehouses. It's not the most, you know, foundational new infrastructure, but the geothermal infrastructure I think is of course
- 20:40
- Unidentified speaker (speaker_0): really beautiful and elegant because it's really my second child out there. But it's very cool. You have um, you know, you drive up on site at Cape Station, you can see a bunch of well packed. pads kind of stacked against each other. This is an innovation that we have driven in geothermal um for the very first time. Bervo has driven, which is
- 20:59
- Unidentified speaker (speaker_0): multi-well pad development. You know, before you kind of had a single vertical well per pad, traditional oil and gas is the same. Now you'll come and you'll see, you know, eight to ten well heads on a single pad, and you'll see three of those pads. in a row. And then you'll see geothermal power plants, three different geothermal power plants
- 21:19
- Unidentified speaker (speaker_0): all clustered right next to each other. And you'll say, oh wow, these look a lot alike. And there's a lot of intention in that because much the way we drove learnings out of the subsurface by deploying the same well over and over and over again, we have made the intention to do the same on the surface by deploying the same infrastructure over and over again. and
- 21:39
- Unidentified speaker (speaker_0): learning from previous iterations of that infrastructure and then pulling cost out of the infrastructure itself. And so if you go to Cape Station today, you see many well pads, you see three fully baked power facilities, you see other power facilities in construction, and you see, you know, a transmission line with our own substation that leads to, you know, the broader grid infrastructure. And it
- 21:59
- Unidentified speaker (speaker_0): is a really complex and very cool piece of infrastructure.
- 22:02
- Unidentified speaker (UNKNOWN): I
- 22:03
- Unidentified speaker (speaker_2): love it. So you see a a nondescript data center and some very beautiful geothermal facilities tied to the grid. And so I want to get into transmission for a second. So if we go back to the early history of the company, you had all those acres of of public lands that were accessible to drill on,
- 22:23
- Unidentified speaker (speaker_2): but it wasn't necessarily easy to get the lines to that land. The law that has just been proposed by the Senate, led by Senator Heinrich and others, would make it easier to build transmission on public lands. Tell me how that would change your business.
- 22:39
- Unidentified speaker (speaker_0): Our business is a generating asset, right? So you have to get electrons from the generating asset to wherever they are going. You can do that in a number of different ways. You can put them on examples. existing transmission infrastructure, which is what we had always planned to do. You can build new transmission infrastructure or this new concept that you can
- 22:59
- Unidentified speaker (speaker_0): connect to load behind the meter. We expect that our business will embrace all three methods of power delivery going forward. But when you look at what the bipartisan senators have done, is they have proposed something that will pave the path. pathway for more predictable in-state and intrastate transmission
- 23:19
- Unidentified speaker (speaker_0): development, which ultimately helps us move electrons around the grid in a really, really helpful way. So, overall in the United States, we have an increase in demand for electrons. We also have kind of a lumpy Want the increase in demand for electrons. People want it in different places. And by easing that transformation, transmission
- 23:39
- Unidentified speaker (speaker_0): development or making it more predictable, we are allowing for the ease of passage of electrons to go from one region to the next, which is increasingly important at this period of load growth and demand.
- 23:50
- Unidentified speaker (speaker_2): What would permitting reform more broadly do for the company? So we talked about transmission, but the permitting reform law that has been proposed by the bipartisan group would do a lot of things. How would that help being able to scale the solution that you guys offer?
- 24:04
- Unidentified speaker (speaker_0): The key word that I use when talking about permitting reform from a Fervo perspective is predictability. We are building, generating assets to support different uses in different geographies. And the whole reason that Fervo exists is to open up the geographic aperture of geothermal. I am not looking to develop in Utah and
- 24:24
- Unidentified speaker (speaker_0): Nevada for the rest of my life here. There is a huge amount of demand in Utah and Nevada, but we believe at Fervo that this could be a global resource because we're pulling the cost down so much that it will be cost competitive in many different geographies. So the whole reason to think about permitting reform for us is that I want to be able to
- 24:44
- Unidentified speaker (speaker_0): move from Utah to Nevada to New Mexico to Colorado and beyond and not have to learn a new playbook every single time I go to a new state. I am pulling risk out of the project through deployment and proof points, operational proof points, over and over and over again. And I should be
- 25:03
- Unidentified speaker (speaker_0): able to benefit from that risk reduction over time. And I should basically, you know, for all intents and purposes, be building projects that are easier to finance as I go throughout my lifespan. But I should not have to say, oh, this was a really low risk project when we developed four of them in the state of Utah. But now that we're going to Colorado, it's going to be a
- 25:23
- Unidentified speaker (speaker_0): completely different risk profile and we're going to have to, you know, rewrite the financing playbook all over again. We are instead looking for predictability. And that is what something like the BAJ BAJA AA Baja really helps do is it really says we want to be consistent in our federal project. permitting across the American states, and we are going to help with
- 25:43
- Unidentified speaker (speaker_0): that. That's a piece that I'm really, really focused on.
- 25:46
- Unidentified speaker (speaker_2): Okay. So speaking of predictability, federal tax law has been changing a lot. And the politics around different kinds of energy have been polemic, with wind and solar in particular, and and gas, with different sides having different views. on that. Geothermal has somehow stayed above
- 26:06
- Unidentified speaker (speaker_2): the fray and avoided being either the favorite or the the enemy of either side. You are seen as being just good from both sides of the aisle. What do you attribute that to?
- 26:18
- Unidentified speaker (speaker_0): Well, one, I would like to, you know, take credit and say that it's a lot of our hard work. But in reality, you know, the story is is easy to sell. In the United States, the shale industry built something that is truly unique and remarkable to this country. We developed
- 26:38
- Unidentified speaker (speaker_0): American-led innovation that led to our energy independence, made us an undeniable energy exporter. We developed a massive suite of innovation. that we can deploy across the rest of the world. And we trained an entire workforce.
- 26:58
- Unidentified speaker (speaker_0): And by being a shale-adjacent technology, sometimes we argue, you know, the next chapter of American Shale, we can completely redeploy that workforce and so much of the innovation that drove the last great innovative. energy
- 27:16
- Unidentified speaker (speaker_0): wave in the United States, and we can just redeploy it again in geothermal energy. And interestingly, you know, the Shale Revolution brought down the emissions in the United States by replacing coal with gas. And we're going to do that again by replacing gas with clean energy, but using the same workforce and the same tools and the same
- 27:36
- Unidentified speaker (speaker_0): technology that really created the. backbone of global shale. That's pretty compelling for both sides of the aisle. It's especially compelling, you know, for anyone who believes in oil and gas. And then when you realize that it's clean, reliable energy that replaces is a one-for-one replacement with fossil fuel, it's pretty hard to argue with from either side of the aisle.
- 27:56
- Unidentified speaker (speaker_2): Yep. And it's been compelling to investors as well. Fervo IPO'd earlier this year. Can you tell us what is different, what it's been like to be a public company versus a private one?
- 28:08
- Unidentified speaker (speaker_0): Yeah. Um how is it different? I think inside from the day-to-day, it isn't. We, as the management team, you know, like to be able to have the financing it takes to reach our growth goals. And we have that now, um, after a very successful.
- 28:27
- Unidentified speaker (speaker_0): May IPO. And this is a capital hungry business. And because we IPO'd for $2.2 billion, we have a lot of capital that we can deploy into making geothermal megawatts. And we love that internally and as a management team. You know, it's been, it's come with all of the challenges that you know are existent from being a public company,
- 28:47
- Unidentified speaker (speaker_0): you know, constant feedback from the market on how your business is doing. which does not always align, it feels, with the operational milestones you're taking off. But I think we're kind of learning our way into that. And overall, you know, it's been an incredible opportunity to educate a much larger group of people who before may never have heard of geothermal energy.
- 29:06
- Unidentified speaker (speaker_2): So you're nine years in, you have gone from demonstration to utility scale, you've gone public, but there's still a lot of work ahead. I saw in some of the public filings you talked about the opportunity to scale something like 300 gigawatts of geothermal in the United States over time. What will be
- 29:26
- Unidentified speaker (speaker_2): necessary to get anywhere near a number like that? What do we need to do?
- 29:30
- Unidentified speaker (speaker_0): It's honestly little by little. I mean, we talk about that in all of our investor materials. People ask us, you know, what's the big unlock? that gets you to, you know, cheaper clean energy? We have this, we have this goal of reaching three thousand dollars a kilowatt by EGS at scale. And people ask us, when is EGS at scale? And what what big
- 29:50
- Unidentified speaker (speaker_0): breakthrough is it really gonna take to get there? And what we always say is a bit disappointing to them, but it's true. It's that we will not get there through any, you know, one big breakthrough. It is going to be a series. of small, highly innovative, you know, human-led ingenuity breakthroughs that are going to get us there. And we see those
- 30:10
- Unidentified speaker (speaker_0): every day. And pulling cost out of this business to the point where the energy that we're producing is not just fast and is not just, you know, profitable at today's market clearing willingness to pay. prices, but that ultimately is resilient to a slew of different
- 30:30
- Unidentified speaker (speaker_0): pricing environments and is potentially the cheapest form of electricity on earth. That is going to get us, you know, deployed all over the world and to be one of the premier sources of electricity that we could think about. And that's that's what we believe internally at Virgo. And it it feels crazy. And I I many times have on panels and you know in front
- 30:50
- Unidentified speaker (speaker_0): of group audiences been like the crazy geothermal lady. And it's something that I'm super to Moniker, I'm super happy to have. I will be the crazy geothermal lady as long as I, as long as I live.
- 31:02
- Unidentified speaker (speaker_2): I love it. Uh well, what a privilege to be here with you as a crazy geothermal lady. I would say a prescient geothermal lady uh who has built this business. So Sarah Jewett, thank you for being here. on Critical Capital.
- 31:16
- Unidentified speaker (speaker_0): Thank you all so much for having me and for taking interest in geothermal energy.
- 31:21
- Unidentified speaker (UNKNOWN): That
- 31:21
- Unidentified speaker (speaker_1): was Sarah Jewett, the COO of Fervo Energy. Critical Capital is a co-production of Crux and Latitude Studios. Our production team includes Max Savage Levinson, Jenna Herzog, Ann Bailey, Stephen Lacey, and Sean Marquon. Matthew Filler mixes the show. Additional production by Emily. Hughes and the excellent team at Crux, the capital
- 31:41
- Unidentified speaker (speaker_1): platform for clean and critical infrastructure. You can find critical capital on Spotify, Apple, or wherever you get your podcasts. I'm Alfred Johnson. Thanks for listening.